Inspection history · 104
4 April 2014
Deficiency Check · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4826201
9 January 2014
Permit to Proceed · Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4780315
3 October 2013
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4728906
19 September 2013
Deficiency Check · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4716886
17 September 2013
Administrative Inspection · Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4717697
25 June 2013
Administrative Inspection · Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4633272
30 November 2012
Administrative Inspection · Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4495115
10 July 2012
Annual Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4381491
22 March 2012
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4269416
4 March 2012
Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4258502
3 January 2012
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4217635
18 December 2011
Deficiency Check · Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4218757
13 August 2010
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3822810
24 June 2010
Internal Structural Exam · COI Inspection · Cargo Tank Internal · MTSA/ISPS Verification · Drydock Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3775245
27 April 2010
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3726395
27 July 2009
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3544738
17 July 2009
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3538086
27 May 2009
Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3487226
27 February 2009
Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3424974
17 February 2009
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3418824
15 December 2008
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3380820
14 December 2008
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3379573
11 October 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3357985
2 September 2008
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3316948
3 April 2008
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3176784
12 September 2007
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3055839
29 July 2007
Examination of Repairs
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3010567
17 July 2007
Permit to Proceed
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2999361
17 July 2007
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3000403
11 July 2007
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2991525
20 July 2006
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 2719314
31 July 2005
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2473466
31 July 2005
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2473528
13 February 2005
COI Inspection · Cargo Tank Internal · Internal Structural Exam · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2355008
11 January 2005
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2268582
6 December 2004
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2254687
8 November 2004
Permit to Proceed · Damage Survey
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2236686
25 October 2004
Examination of Repairs
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2227913
4 October 2004
Examination of Repairs
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2213224
20 September 2004
Damage Survey
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2201965
3 September 2004
Annual Inspection · Damage Survey · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2185228
28 August 2004
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2179161
23 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1985283
19 August 2003
Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1881596
18 February 2003
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1752852
25 October 2002
Deficiency Check · Annual Inspection
Physical examination · MSD ST. PAUL · USCG Heartland District (CGD-H) · Activity 1697122
16 October 2002
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1690904
21 August 2002
Type not recorded
No type recorded · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1664263
22 October 2001
Annual Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1462275
11 November 2000
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 525262
10 October 2000
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 480258
5 October 2000
COI Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1361736
16 March 2000
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 69255
2 March 2000
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1046972
15 November 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 766124
10 November 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 210295
20 October 1999
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 793836
26 July 1999
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 766224
3 July 1999
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 210291
25 November 1998
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 807216
23 November 1998
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 804960
10 February 1998
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 456785
17 November 1997
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1107475
12 March 1997
Damage Survey
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1105680
11 March 1997
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 57634
5 November 1996
Hull Examination · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1170077
1 May 1996
Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1468384
11 March 1995
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1176967
1 March 1995
Deficiency Check · COI Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 852865
10 February 1995
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 725
27 April 1994
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1170485
1 March 1994
Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1164480
9 December 1993
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1158135
6 September 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 122294
4 August 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1154443
22 March 1993
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1146199
3 March 1993
COI Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1463761
20 January 1993
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 436444
13 January 1993
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 827356
28 December 1992
Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 961682
30 January 1992
Re-Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1254692
3 December 1991
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 476659
18 July 1991
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1224575
29 March 1991
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 913575
11 February 1991
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 526685
23 July 1990
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 529930
6 June 1990
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 931409
3 December 1989
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 514252
27 April 1989
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 446903
20 April 1989
COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1201253
5 November 1988
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 452674
1 April 1988
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1300472
19 February 1988
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 520395
14 July 1987
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 490671
22 April 1987
COI Inspection · Hull Examination
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1313152
5 February 1987
Administrative
Administrative · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1008799
3 February 1987
Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1008555
24 December 1986
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 448850
22 January 1986
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1303893
25 April 1985
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 470290
3 April 1985
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 982247
24 July 1984
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 462734
27 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1280014
2 February 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278315
Construction/Loadline › Hull › Double Hull
Issued 9 January 2014
Resolved
Barge has fractures in bow rake, #2,3,4 voids with temp repair, requried permanent repair prior to cargo ops.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2014
Resolution: Witnessed 1.5 PSI air test and visual examination of completed repairs.
Construction/Loadline › Hull › Hull Plating
Issued 17 September 2013
Resolved
TBSIP examiner noted a 3" x 1/16" crack in the stbd bow, just aft of the corner wrapper. Temp repairs of expoxy applied inside and out. Vssl to transit to TT 104 for perm repairs. TBSIP 835 issued.
Action required: 705 - Other - as specified
Due 29 October 2013
Resolved 19 September 2013
Resolution: Witnessed satisfactory air test after completion of repairs.
Construction/Loadline › Hull › Hull Plating
Issued 3 December 2012
Resolved
5" x 1/8" fracture found on STBD bow deck. Temp repairs conssiting of epoxy applied by TBSIP examiner. TBSIP 835 issued for perm repairs in 45 days
Action required: 705 - Other - as specified
Due 14 January 2013
Resolved 4 January 2013
Resolution: Repairs made to stbd bow cornerwrap to OCMI satisfaction. See Narrative for further details.
Construction/Loadline › Hull › Hull Plating
Issued 4 March 2012
Resolved
"D8 TBSIP SELF-REPORTED DEFICIENCY" 8" x 1/4" fracture on Port stern. Jack patch and epoxy have been applied.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 April 2012
Resolved 22 March 2012
Resolution: C/R (1)4''''X''''4''''X5/8" corner & 2''''X4'''' orange peel on port stern. C/R (1) 2''''X4''''X5/8" orange peel on stbd stern corner.
Construction/Loadline › Hull › Bottom Plating
Issued 3 January 2012
Resolved
fracture in port bow transition
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 January 2012
Resolved 3 January 2012
Resolution: 03 Jan2012:: Conducted repair check. Examined welds and witnessed satisfactory air test of (1) 4'' x 6'' x 3/4" transition knuckle at port bow.
Construction/Loadline › Hull › Hull Plating
Issued 18 December 2011
Resolved
"D8 TBSIP SELF-REPORTED DEFICIENCY" Examiner discovered a 2" hairline fracture on poirt bow at the 8' draft on the transition knuckle.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 January 2012
Resolved 3 January 2012
Resolution: Crop and renewed a 4'' x 6'' x 1/2" transition knuckle. Air and soap test sat.
Construction/Loadline › Hull › Hull Plating
Issued 1 July 2010
Resolved
Vessel issued 835 to provide to the CG, 30 year mid-body professional engineering gauging report.
Due 2 August 2010
Resolved 13 August 2010
Resolution: Recieved and reviewed PE report fort he 30 yr mid-body gauging report. Cleared CG-835. No further action required.
Construction/Loadline › Hull › Hull Plating
Issued 17 February 2009
Resolved
1in X 1in hole on stbd side of slopesheet in bow just four (4) feet forward of the cargo tank.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 27 February 2009
Resolution: 24"x24" plate inserted by shipyard; fit up, weld, air test are satisfactory.
Construction/Loadline › Hull › Hull Plating
Issued 17 July 2007
Resolved
Make repairs to 10"x3/4" fracture at the stbd stern aft end at the #5 wing tank 3" below the walking deck.
Action required: 705 - Other - as specified
Due 18 August 2007
Resolved 17 February 2009
Resolution: Did not find any fractures to stbd stern aft end at the #5 wing tank 3" below walking deck.
Construction/Loadline › Hull › Hull Plating
Issued 4 January 2005
Resolved
Fractures noted in way of stbd bow, #1 Stbd wing void and #1 Port wing void.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 January 2005
Resolution: All areas inserted.
Construction/Loadline › Hull › Bottom Plating
Issued 8 November 2004
Resolved
Vessel permitted to transit to Chalmette, Conoco Phillips to discharge its cargo of Diesel Fuel. Vessel has fracture in the aft port wing void, that has been temp repaired with a [name withheld].
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 November 2004
Resolved 8 November 2004
Resolution: Vessel plans changed and issued PTP See Narrative for Activity 2236686 for details.
Construction/Loadline › Hull › Bottom Plating
Issued 8 November 2004
Resolved
Vessel to be dry-docked and proper repairs to the bottom plate IWO the aft port wing void bay #7 counting from aft. A fracture has been jack patched and the incoming water stopped. Repairs to be to the satisfaction of the attending marine inspector.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 November 2004
Resolved 8 November 2004
Resolution: Cleared due to vessel plan change, see narrative for activity 2236686.
Construction/Loadline › Hull › Bottom Plating
Issued 8 November 2004
Resolved
Vessel issued a PTP to proceed to mile 99.9 Tennessee River then to BATD for repairs. Vessel to be dry-docked and make proper repairs to the #5 port wing void hull approx 15ft under cargo tank IWO bay #7 Counting from aft. Vessel installed a [name withheld] to stop leak in this area. Repairs to satisfaction of USCG Inspector.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 November 2004
Resolved 8 December 2004
Resolution: Repairs witnessed by BATU.
Construction/Loadline › Hull › Side Shell
Issued 20 September 2004
Resolved
Crew discovered a fracture in the port stern void on 20 Sep 2004. MSO Memphis was notified, Attending inspector verified water intrusion from the deck hatch opening, issued CG 835 for vsl to off load in Memphis, TN., make temp. repairs, transit to repair facility and make permanent repairs to the satisfaction of the attending USCG Marine Inspector. MSU Baton Rouge was notified.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 October 2004
Resolved 12 October 2004
Construction/Loadline › Hull › Hull Plating
Issued 28 August 2004
Resolved
Make permanent repairs to holed side shell and wasted/damaged internals IWO #1 wing void. See reference case for additional details.
Action required: 705 - Other - as specified
Resolved 7 September 2004
Resolution: 2'' x 4'' x 3/8": insert in way of the #1 wing viod
Construction/Loadline › Hull
Issued 16 October 2002
Resolved
Barge was reported to have had repairs made to the bottom plating of the #1 wing tank. The barge was then dispatched prior to being inspected by Coast Guard Marine Inspector to verify the repairs were IAW 46 CFR and the inland repair guide. LEGACY COMPONENT DESC: Bottom Plating
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 October 2002
Resolved 25 October 2002
Resolution: Attended barge moored stbd side to at Upper River Services Pig''s Eye Facility in South St. Paul, MN. Inspected shell repair from inside of #1 stbd wing tank. Repair considered satisfactory.
Construction/Loadline
Issued 12 March 1997
Resolved
FIND AN MAKE PERMANENT REPAIRS TO THE LEAK IN WAY OF THE #5 STARBOARD WING VOID BOTTOM PLATE. THE REPAIRS SHALL BE MADE TO THE SATISFACTION OF THE ATTENDING U.S.C.G MARINE INSPECTOR PRIOR TO LOADING THE NEXT CARGO.
Condition: Unknown
Due 12 March 1997
Resolved 12 March 1997
Deck/Cargo
Issued 1 March 1995
Resolved
OPEN VAPOR RECOVERY LINE FOR INTERNAL INSPECTION.
Condition: Unknown
Due 1 April 1995
Resolved 3 March 1995
Deck/Cargo
Issued 1 March 1995
Resolved
OPEN 1 THRU 5 PORT AND STARBOARD CARGO TANK PRESSURE VACUUM VALVES FOR INTERNAL INSPECTION.
Condition: Unknown
Due 1 April 1995
Resolved 3 March 1995
Construction/Loadline
Issued 1 March 1995
Resolved
REPAINT ALL DRAFT MARKS.
Condition: Unknown
Due 1 April 1995
Resolved 3 March 1995
Deck/Cargo
Issued 1 March 1995
Resolved
CONDUCT "SET POINT TEST" AS DESCRIBED IN ERL OPERATION MANUAL TO PROVE PROPER OPERATION OF 1 THRU 5 PORT AND STARBOARD CARGO TANK SPILL VALVES.
Condition: Unknown
Due 1 March 1995
Resolved 1 March 1995
Deck/Cargo
Issued 3 March 1993
Resolved
Install inspection openings in vapor control system which allow inspection of each horizontal run. Current installation does not allow inspection of transverse runs from tanks to longitudinal header, and inspection of _x001C_ diagonal run in longitudinal header.
Condition: Unknown
Due 3 March 1993
Resolved 3 March 1993
Deck/Cargo
Issued 3 March 1993
Resolved
Amend transfer procedures to show how the inspector will be able to view the vapor control system piping without being exposed to hazardous vapors._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 March 1993
Resolved 3 March 1993
Deck/Cargo
Issued 3 March 1993
Resolved
Amend transfer procedures. Provide a schematic that shows the actual layout of the vapor control system. Additionally, the location of inspection openings in the vapor control system which allows inspection of each horizontal and vertical run of vent pipe shall be clearly marked.
Condition: Unknown
Due 3 March 1993
Resolved 3 March 1993
Construction/Loadline
Issued 28 December 1992
Resolved
REMOVE TEMPORARY PATCH TO HEAD LOG IN WAY OF THE BOW VOID AND MAKE PERMANENT REPAIRS TO FRACTURE. THIS REQUIREMENT IS TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT [name withheld] 28JAN93.
Condition: Unknown
Due 28 December 1992
Resolved 28 December 1992
Deck/Cargo
Issued 3 February 1987
Resolved
CARGO PIPING WAS NOT TESTED AT 1.5 TIMES MAWP AS REQUIRED BY 33CFR 156.170.TEST CARGO PIPING AT 187.5 PSI, AND REPORT THE TEST DATE AND RESULTS TO [name withheld] , KY.
Condition: Unknown
Due 3 February 1987
Resolved 3 February 1987
Unknown
Issued 22 January 1986
Resolved
MAKE PERMANENT REPAIRS TO DAMAGE IN WAY OF STARBOARD BOW HEAD LOG CORNER. REPAIRS TO BE COMPLETED AT NEXT GAS-FREE CONDITION OF VESSEL AND NOT LATER THAN 28 FEBRUARY 1987.
Condition: Unknown
Due 22 January 1986
Resolved 22 January 1986
Construction/Loadline
Issued 3 April 1985
Resolved
MAKE PERMANENT REPAIRS TO 3' LONG FRACTURE IN WAY OF STARBOARD SIDE BOW HEAD LOG.
Condition: Unknown
Due 3 April 1985
Resolved 3 April 1985
Construction/Loadline
Issued 3 April 1985
Resolved
MAKE PERMANENT REPAIRS TO DAMAGE IN WAY OF PORT BOW HEAD LOG CORNER.
Condition: Unknown
Due 3 April 1985
Resolved 3 April 1985