MISS VIVIAN is a 1979 passenger vessel (inspected). The Coast Guard has recorded 89 inspections since 1981, most recently in May 2026, along with 103 deficiencies, 1 operational control and 4 casualty investigations between 2010 and 2018.

Records from 1981 to 2026. Most recent: inspection, 20 May 2026.

Built
1979
Last inspected
20 May 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDH-6631
Flag
UNITED STATES
367640020
Maury page id
psix-50143

Inspections, by type

…with no type recorded19
Years with a record 43 calendar years (1981–2026)
The 89 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)91.3 ft × 19.6 ft × 2.3 ft
Registered tonnagegross 92 / net 68
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSWIFTSHIPS, INC. · MORGAN CITY, LA, UNITED STATES · built 1979
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portARANSAS PASS, TX
Trade endorsementsCoastwise, unrestricted, Recreational, Registry
DocumentationValid · issued 23 July 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it92 - Regulatory (Subpart C or D), Gross Ton
68 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDH6631MMSI 367640020 · active · compulsorily equipped · granted 6 September 2024, expires 10 September 2034
WCX8865MMSI not assigned · expired · compulsorily equipped · granted 18 December 1997, cancelled 19 February 2008 · licensed under a name not among this hull’s recorded names (not shown)
WCX2307MMSI not assigned · expired · compulsorily equipped · granted 23 January 1997, cancelled 31 March 2007 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MISIONERO Passenger (Inspected) · MISLE 46571 · 1 August 2018 · activity 6498322PETITE Offshore Supply Vessel · MISLE 220697 · 1 August 2018 · activity 6498322

Inspection history · 89

20 May 2026 Examination of Repairs · Administrative Inspection · Vessel Attendance
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8377464
18 July 2025 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8188701
16 May 2025 Administrative Inspection · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8139536
8 May 2025 Deficiency Check · Administrative Inspection · Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8130939
30 October 2024 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8027151
7 August 2024 Administrative Inspection · COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7976489
8 June 2023 Annual Inspection · Administrative Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7709689
26 May 2023 Administrative Inspection · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7696979
10 May 2023 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7685592
2 August 2022 Administrative Inspection · Examination of Repairs · In-Service Inspection · Drydock Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7523002
12 October 2021 Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7283631
3 March 2021 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7157069
26 February 2021 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7146864
26 October 2020 Deficiency Check · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7084090
24 September 2020 Drydock Exam · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7064084
9 September 2019 Deficiency Check · Administrative Inspection · COI Inspection · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6807511
6 August 2019 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6827589
12 October 2018 Annual Inspection · Damage Survey · Plan Review "T" Boat · In-Service Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6560024
26 September 2018 Internal Structural Exam · Examination of Repairs · In-Service Inspection · Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6549448
6 August 2018 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6502533
1 August 2018 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6498322
12 March 2018 In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6370336
13 October 2017 Internal Structural Exam · DAPI Audit · Annual Inspection · Deficiency Check · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6261140
1 December 2016 Annual Inspection · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6045119
21 September 2016 Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5999723
3 September 2015 Internal Structural Exam · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5767457
3 June 2014 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4878608
17 May 2012 Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4311974
12 January 2012 Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4223926
14 July 2011 Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 4086190
12 July 2011 Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 4089341
15 November 2010 COI Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3891452
26 October 2010 Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3878111
8 March 2010 Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3694702
9 December 2008 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3377219
1 July 2008 Drydock Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3245820
5 June 2008 Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3227999
17 December 2007 Deficiency Check · Periodic Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3142439
31 January 2007 Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2867349
13 October 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2800014
24 March 2006 Deficiency Check · Hull Examination · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2606804
27 January 2005 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2281321
19 October 2004 Hull Examination · Internal Structural Exam
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2223782
10 September 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2192452
16 March 2004 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2022570
17 February 2004 Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2001150
30 January 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1999748
24 April 2003 Hull Examination · Periodic Inspection · Internal Structural Exam
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1775555
5 March 2002 Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1490846
15 February 2000 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1046544
15 December 1999 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1391164
8 February 1999 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1130754
1 February 1999 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1125938
6 January 1999 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 810430
17 December 1998 Re-Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1402750
8 December 1997 Examination of Repairs · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1457519
31 October 1997 Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1388387
30 October 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 60511
19 February 1997 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1092291
23 December 1996 Hull Examination · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1374817
6 February 1996 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1183003
29 December 1995 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1392355
6 August 1995 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 113060
30 December 1994 Hull Examination · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1470669
5 October 1994 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1172331
7 December 1993 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1158792
15 September 1993 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1146391
1 September 1993 COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 835666
13 May 1993 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1142607
4 September 1992 COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1362647
11 May 1992 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 952348
14 May 1991 Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 899605
11 February 1991 Drydock Extension
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 922232
22 June 1990 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1234556
12 July 1989 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1338349
5 July 1989 COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 898769
22 December 1988 Drydock Extension
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1343881
30 June 1988 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1205766
2 July 1987 Hull Examination · COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1019761
9 January 1986 COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 992765
25 July 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 984430
21 February 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1290266
10 January 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1286459
23 February 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970943
12 January 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1279285
30 August 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970588
13 January 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968870
25 February 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 972325
18 February 1981 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278368

Deficiency record · 103

11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 August 2025 Resolved
A vessel must have one or more ring life buoys as follows: A vessel of more than 65 feet in length must carry a minimum of three ring life buoys. At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached. Each ring life buoy with a floating waterlight must have a lanyard of at least 3 feet in length but not more than 6 feet, securing the waterlight around the body of the ring life buoy. The name of the vessel must be marked or painted in clearly legible letters and numbers: clearly legible block capital letters with the vessel's name. Each ring life buoy must be marked with Type II retroreflective material in accordance with 46 CFR 185.604. Vessel is fitted with three buoys; the port bow buoy has a waterlight incorrectly attached and lacks markings, including approval standard per 46 CFR 160.050. The starboard bow buoy requires retroreflective material and markings, and the aft buoy requires approval per 46 CFR 160.050. 46 CFR 180.70
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2025
Resolved 17 September 2025
Resolution: Owner/Operator purchase new ring buoys with appropriate markings and fittings.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 1 August 2025 Resolved
Each disposable hydrostatic release unit (HRU) must be marked with an expiration date of two years after the date on which the unit is installed. The EPIRB was marked for three years, and was found to be expired. Vessel operator had a new HRU available. 46 CFR 185.740(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2025
Resolved 4 September 2025
Resolution: Vessel installed a new HRU for their EPRIB.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 1 August 2025 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: Charts of large enough scale to make safe navigation possible. Vessel's crew was not able to verify up-to-date electronic charts. 46 CFR 184.420(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 August 2025
Resolved 17 September 2025
Resolution: Capt emailed a photo of the Garmin specs/software update. MI verified latest software system.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 1 July 2025 Resolved
When operating a vessel on a body of water where the discharge of treated or untreated sewage is prohibited. Acceptable methods of securing the device include— Closing the seacock and removing the handle;(2) Padlocking the seacock in the closed position;(3) Using a non-releasable wire-tie to hold the seacock in the closed position; or(4) Locking the door to the space enclosing the toilets with a padlock or door handle key lock. Piping appears to be configured to bypass MSD tank and was missing required securing devices. Discharge piping was wasted and fractured. Rectify to the satisfaction of the MI. 46 CFR 184.704 33 CFR 159.7(c)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 July 2025
Resolved 16 July 2025
Resolution: Discharge piping replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 4 September 2024 Resolved
At each inspection for certification and reinspection the marine inspector shall examine the bilges and other spaces to see that there is no accumulation of oil or other matter which might create a fire hazard. Observed excessive oil in the bilges under the main engine. Remove and clean to the satisfaction of attending marine inspector. 46 CFR 176.25-50(b)(Old T)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 September 2024
Resolution: Excess oily water removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 September 2024 Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment other than small buoyancy compartments, under all practical conditions. Vessel's fixed bilge system was inoperable and unable to drain water from spaces. Correct to the satisfaction of attending marine inspector. 46 CFR 182.25-1(a)(Old T)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 September 2024
Resolution: Fixed bilge pump replaced and operational.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 September 2024 Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. In the crew accommodation space there are two penetrations aft port, one forward port, and two aft starboard that are not watertight. Correct to the satisfaction of USCG marine inspector. 46 CFR 177.13-1(Old T) 46 CFR 171.114(a)(2)(Old S)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 6 September 2024
Resolution: Pentrations corrected.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 September 2024 Resolved
The cockpit must be watertight. There are two leaks, port and starboard, in way of the companionway decks outboard of crew accommodations that are leaking into the voids below deck. Correct to the satisfaction of the USCG marine inspector. 46 CFR 177.13-1(Old T) 46 CFR 171.145(a)(Old S)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 6 September 2024
Resolution: Leak repaired.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 September 2024 Resolved
Examine all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. Where the internals of the vessel are completely concealed, sections of the lining or ceiling may be removed or the parts otherwise probed or exposed so that the marine inspector may satisfy himself as to the condition of the hull structure. Vessel had two leaks in deck bulk head of the Tool Room and one leak through the deck bulkhead of the forepeak void through the deteriated windlass. Correct to the satisfaction of the USCG marine inspector. 46 CFR 176.25-5(a)(1)(Old T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 6 September 2024
Resolution: Leaks repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 September 2024 Resolved
Water for cooling the exhaust pipe must be obtained from the engine cooling water system or a separate engine driven pump. The center and starboard main engines are being primed via a garden hose attached to a water tank. Correct to the satisfaction of USCG marine inspector. 46 CFR 182.425 (b)(1)(Old T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 30 October 2024
Resolution: Vessel installed new sea valve. Engine cooling systems working properly.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 4 September 2024 Resolved
All vessels with crew members living on board shall be provided with crew accommodations of sufficient size, adequate construction, and with suitable equipment to provide for the protection and accommodation of the crew in a manner practicable for the size, facilities, and service of the vessel. Bolt was missing on the the plate for the strap down of the refrigerator. Correct to the satisfaction of USCG marine inspector. 46 CFR 177.25-1(a)(Old T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 6 September 2024
Resolution: Bolt replaced.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificate for medical care
Issued 7 August 2024 Resolved
No vessel subject to inspection under 46 U.S.C. 3301 will be navigated unless it is under the direction and control of an individual who holds an appropriate license or officer endorsement on his or her MMC. Master was unable to provide medical certificate and submittal documentation. Master to provide documentation prior to operating vessel to the satisfaction of USCG marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2024
Resolved 6 September 2024
Resolution: Medical certificate documentation provided.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 8 June 2023 Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew mem]trers are familiar with their duties during emergencr es that necessitate abandoning ship or the recovery of persons who have fallen overboard. MOB drills need to be conducted to satisfaction of lnspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2023
Resolved 1 August 2023
Resolution: Vessel crew conducted drills.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 June 2023 Resolved
A vessel must be provi ded with a satisfactory arrangement for draining any watertight compartment, other than small buoyancy compartments, under all practicable conditions. Sluice valves are not permitted in watertight bulkheads. Conduct complete test of bilge suction system.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2023
Resolved 1 August 2023
Resolution: Tested all suctions.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 June 2023 Resolved
Each survival craft must be (1) Secured to the vessel by a paln ter with a ffoat-free link permanently attached to the vessel except that a float-free link is not required if the vessel- operates only on water deep as the length of the painter HRU was improperly installed and needs to be installed properly to satisfaction of inspector.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 2 August 2023
Resolved 1 August 2023
Resolution: HRU correctly installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 June 2023 Resolved
Vessel must carry one floating waterlight, unless it is limited to daytime operation, in which case no floating waterlight is required. Each floating waterlight installed after March 11, 1997, on a wessel carrying only one ring buoy, must be attached to the lanyard with a corrosion-resistant clip. The clip must hawe a strength of at least 22.1 ktLograms (50 pounds), and affow the waterlight to be quickly disconnected from the ring life buoy. Floating fight was not properly installed to buoy. Needs to be installed properly to the satisfaction of inspector.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2023
Resolved 1 August 2023
Resolution: Installed Properly.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 12 October 2021 Resolved
No major repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment shall be made without the knowledge and approval of the Officer in Charge, Marine Inspection. Noted a buckled frame on the port side while conducting internal structural exam in the forepeak space. In addition, noted inset on the starboard bow approximately 2 feet wide and 2 inches deep. prepare repair proposal and complete repair to the satisfaction of attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2021
Resolved 9 November 2021
Resolution: Port and starboard bow inserts were satisfactorily welded and attending marine inspector witnessed satisfactory pressure test for each
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 12 October 2021 Resolved
The marine inspector shall examine the bilges to see that there is no accumulation of oil. Noted oily water accumulation in engine room and steering room in the bilge. Clean bilges to satisfaction of marine inspector. 46 CFR 176.25-50(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2021
Resolved 8 November 2021
Resolution: Bilges were cleaned and inspected satisfactory
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 October 2021 Resolved
The marine inspector shall examine and test the following items to the extent necessary to determine that they are in proper operating condition, safe electrical condition, and fit for the service intended. Noted multiple electrical outlets that were in an open ground and hot/neutral rev condition, and daisy chaining multi-outlet connectors. Repair to correct status. 46 CFR 176.25-15(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2021
Resolved 27 October 2021
Resolution: Electrical outlets were rewired and tested satisfactory with a socket tester; all outlets were found in the correct indication.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 12 October 2021 Resolved
On a vessel of more than 65 ft in length, the public address system must be a fixed installation and be audible during normal operating conditions throughout the accomodation spaces and all other spaces normally manned by crew members. No overnight passengers until rectified.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2021
Resolved 8 November 2021
Resolution: Public address system was tested operational
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 October 2021 Resolved
Fuel tank vent pipes must be fitted with removable flame screens. Noted the flame screens for fuel tank vent pipes were clogged. Repair or replace flame screens. Vessel rep informed Marine inspector that the portside fuel ventilation goose-neck piping had sheered off when attempting to replace the flame screen. Provide a repair proposal and repair or replace to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 November 2021
Resolution: Repaired portside fuel tank goose-neck piping and replaced flamescreen
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 12 October 2021 Resolved
Each life float and buoyant apparatus must be secured to the vessel by a painter and a float-free link. Inflatable liferaft installed as a substitute for life float or buoyant apparatus as allowed by 180.10-30(c) was only secured by a hydrostatic release unit. Crew was educated on proper inflatable life raft stowage and painter was attached to vessel on the spot.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 12 October 2021
Resolved 12 October 2021
Resolution: Crew educated, painter attached to bracket on ship.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 12 October 2021 Resolved
All escape hatches and other emergency exits shall be marked on both sides using at least 1-inch letters: "Emergency Exit, Keep Clear." Doors on either side of the accompdation space and overhead hatches in the generator room and engine room require proper labeling. 46 CFR 185.30-15
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2021
Resolved 8 November 2021
Resolution: Emergency exits were labled accordingly
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 12 October 2021 Resolved
A vesel must carry either a first-aid kit approved under 160.041 or a kit with equivalent contents and instructions. First aid kits onboard are missing multiple required items including ammonia inhalants, iodine applicators, tourniquet, and eye dressing. Replace all missing items to make a complete kit as required by 160.041.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2021
Resolved 8 November 2021
Resolution: All required first aid items were verified onboard and within expiration
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 October 2021 Resolved
All vessels over 26 feet in length shall be provided with individual bilge lines and bilge suctions for each watertight compartment. Engine workshop has 2 suction points due to centerline fuel tanks preventing communication from one side of the bilge to the other. Starboard side pickup could not be proven functional. Repair and demonstrate functionality. Lazarette pickup also needs to be tested in presence of USCG. 46 CFR 182.25-5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2021
Resolved 8 November 2021
Resolution: Bilge system tested operational
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 5 November 2020 Resolved
Vessels operated more than 100 NM but not more than 200NM from the nearest land, be equipped with a NAVTEX receiver conforming to the following performing standards. Vessel is restricted to 100NM until radio installation meets marine inspector satisfaction. Vessel is not equipped with NAVTEX printing capability or approved alternative.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2020
Resolved 1 December 2020
Resolution: Vessel installed NAVTEX receiver on vessel and sent confirmation photo.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 26 October 2020 Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Hydrostatic release is missing expiration date. Vessel is limited to carry 25 passengers until def is rectified.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2020
Resolved 20 November 2020
Resolution: Vessel sent photo of hydrostatic release correctly labeled with servicing certificate
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 September 2019 Resolved
Fire fighting equipment and appliances- all vessels shall be provided with a hand operated portable fire pump having a capacity of at least 5 gallons per minute. Vessel could not provide a portable hand fire pump. 46 CFR 181.10-5
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2019
Resolved 18 September 2019
Resolution: Vessel operator provided the pump from the vessels storage warehouse.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 September 2019 Resolved
Other structural condition- Except for engine exhausts each inlet or discharge pipe that penetrates the hull below a line drawn parallel to and at least 6 inches above the deepest subdivision load line must have means to prevent water from entering the vessel if pipe fractures or otherwise fails. Overboard discharge piping for forward shower has no means to secure or prevent the flow of water in. At vessels deepest draft discharge is within 6 inches of waterline. 46 CFR 171.119 (b)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2019
Resolved 28 October 2019
Resolution: Crew installed a valve on the overboard discharge and a check valve to prevent back flooding if the vessel's load causes water ingress.
Communications › Radio Communications › EPIRB
Issued 13 October 2017 Resolved
Route restricted to less than 3NM from shore. The EPIRB hydrostatic release unit has expired. Each expired life saving item shall be replaced during the annual inspection. Replace the EPIRB hydrostatic release.
Action required: 705 - Other - as specified
Due 20 October 2017
Resolved 18 October 2017
Resolution: Replaced EPIRB HRU and correctly labelled expiration date on the new unit.
Engineering › Fuel Oil Service System › Valve
Issued 13 October 2017 Resolved
Fuel shutoff valves were labelled improperly. Remote fuel shutoff valves must be labelled with direction of operation. Correctly label shutoff valves.
Action required: 705 - Other - as specified
Due 20 October 2017
Resolved 18 October 2017
Resolution: Switched direction of operation.
Engineering › Bilge Water Management System › Not Operational
Issued 3 September 2015 Resolved
Vessel operators could not prove proper operation of their bilge pumps. Requirement to verify operation of the bilge system prior to carriage of passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2015
Resolved 16 September 2015
Resolution: MIs revisited the vessel and witnessed proper operation of the bilges.
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 September 2015 Resolved
MIs found 3 linear indications and one severely deteriorated weld on the port side in the forward void. Vessel rep was instructed to repair to the satisfaction to the attending MI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 September 2015
Resolved 10 September 2015
Resolution: MIs verified properly renewed welds in the forward void.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 3 September 2015 Resolved
Prove proper operation of the audible and visual alarm of the generator room high level alarm.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 September 2015
Resolved 10 September 2015
Resolution: MIs verified proper operation of the audible alarm on the high level bilge alarm.
Engineering › Compressed Air System (start air) › Valve
Issued 15 November 2010 Resolved
Prove proper operation of the two safety relief valves on the air receivers.
Action required: 705 - Other - as specified
Due 22 November 2010
Resolved 16 November 2010
Resolution: New safety relief valves are installed on the air recievers.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 8 March 2010 Resolved
Both Port and Center shaft are bent 20 thousands off center
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2010
Resolution: New shaft installed and inspected.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 8 March 2010 Resolved
Center propeller missing 5" x 5" piece of metal from 1 blade
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2010
Resolution: New propeller installed
Engineering › Bilge Water Management System › Interface Detector
Issued 9 December 2008 Resolved
Prove proper operation of generator room bilge alarm at operating station.
Action required: 705 - Other - as specified
Resolved 19 December 2008
Engineering › Fuel Oil Service System › Vent Pipe
Issued 9 December 2008 Resolved
Install proper fuel tank vents flame screen.
Action required: 705 - Other - as specified
Resolved 19 December 2008
Construction/Loadline › Penetrations › Gasket
Issued 9 December 2008 Resolved
Renew lazarette soft patch basket and make watertight.
Action required: 705 - Other - as specified
Resolved 19 December 2008
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (electric)
Issued 9 December 2008 Resolved
Mount murphy switch junction box for center engine.
Due 23 December 2008
Resolved 19 December 2008
Construction/Loadline › Penetrations › Pipe Flange
Issued 9 December 2008 Resolved
Install proper metallic bulkhead penetration where sewage pipe passes through the fwd bulkhead in sewage tank room on stbd side.
Due 23 December 2008
Resolved 19 December 2008
Construction/Loadline › Structures › Machinery Space Opening
Issued 9 December 2008 Resolved
Repair escape watertight scuttle broken dog bar in sewage tank space.
Action required: 705 - Other - as specified
Due 9 January 2009
Resolved 6 January 2009
Resolution: Received fax attesting to correction of deficiency.
Deck/Cargo › Marine Portable Tanks › Securing Device
Issued 9 December 2008 Resolved
Remove old potable water hydrostatic tank & secure new tank.
Due 23 December 2008
Resolved 19 December 2008
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 9 December 2008 Resolved
Renew leaking raw water cooling pipe to port engine exhaust.
Condition: Unknown
Due 23 December 2008
Resolved 19 December 2008
Electrical › Electrical Distribution System (service) › Cable
Issued 1 July 2008 Resolved
Wiring not properly secured in both port & strb side voids
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 3 July 2008
Resolution: clamps installed
Electrical › Electrical Distribution System (service) › Bus Bar Connection
Issued 17 December 2007 Resolved
Repair/replace bus bar connection on main switch board distribution panel.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2007
Resolution: Replaced with new bus bar.
Communications › Public Address System › Loudspeaker
Issued 17 December 2007 Resolved
Provide public address system in accommodation spaces.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2007
Resolution: Installed loudspeaker.
Construction/Loadline › Penetrations › Valve Flange
Issued 17 December 2007 Resolved
Replace valve flange IWO side shell, due to corrosion.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2007
Resolution: Replaced and welded.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 17 December 2007 Resolved
Drain and clean bilges and make ready for inspection.
Condition: Improper/Lack of Maintenance
Due 7 January 2008
Resolved 7 January 2008
Resolution: Cleaned and inspected. All Sat.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 17 December 2007 Resolved
Repair fractured exhaust piping IWO MDE Exhaust bowls.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2007
Resolution: Repaired - welded fractures.
Construction/Loadline › Penetrations › Pipe Flange
Issued 31 January 2007 Resolved
R/R penetrations into water tight bulkheads in pump room and engine room. 46 CFR 171.114
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 27 February 2007
Resolution: Runs were sealed.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 31 January 2007 Resolved
Provide lifesaving record book. 46 CFR 185.702
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 27 February 2007
Resolution: Provided record book.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 31 January 2007 Resolved
Provide EPIRB renewal certificate prior to 28 Feb 07.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 27 February 2007
Resolution: Provided certificate.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 31 January 2007 Resolved
Replace emegency escape markings for E/R and Gen room. 46 CFR 185.30-15
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 27 February 2007
Resolution: Markings renewed.
Lifesaving › Lifefloat › Painter
Issued 27 January 2005 Resolved
Renew/replace all 3 seapainters for lifefloats.
Condition: Improper/Lack of Maintenance
Due 17 February 2005
Resolved 17 February 2005
Resolution: Seapainters replaced.
Communications › Radio Communications › Emergency Source of Power
Issued 27 January 2005 Resolved
Provide emergency power to one vhf radio on bridge.
Condition: Unknown
Due 17 February 2005
Resolved 17 February 2005
Resolution: Emergency power attached to VHF.
Construction/Loadline › Hull › Hull Plating
Issued 27 January 2005 Resolved
Make vessel available to re-evaluate pitting on interior of side shell on starboard side near ladder leading to passenger compartment. Reevaluation to occur between 1 Apr and 1 May 2005.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2005
Resolved 12 May 2006
Operations/Management › Drills/Instruction
Issued 9 February 2004 Resolved
Conduct drills prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 March 2004
Navigation
Issued 9 February 2004 Resolved
Provide updated charts, whistles for lifejackets, and first aid equipment.
Due 17 March 2004
Resolved 16 March 2004
Fire Fighting › Nozzles
Issued 9 February 2004 Resolved
Prove proper operation of fire nozzle. LEGACY COMPONENT DESC: Condition
Due 20 February 2004
Resolved 16 March 2004
Construction/Loadline › Hull
Issued 24 April 2003 Resolved
Reweld (8) cracked welds in galley void, crop and renew 5th and 6th transverse stiffeners, centerline in bilge, renew longitudinal angle as marked.
Due 28 May 2003
Resolved 7 May 2003
Construction/Loadline › Hull
Issued 24 April 2003 Resolved
Renew PVC piping along side shell in stbd mates room.
Due 28 May 2003
Resolved 7 May 2003
Engineering › Bilge Water Management System
Issued 24 April 2003 Resolved
Renew bilge overboard valve in engine room. LEGACY COMPONENT DESC: Valve
Due 28 May 2003
Resolved 7 May 2003
Accommodation/Occupational Safety › Refrigeration (air conditioning)
Issued 24 April 2003 Resolved
Prove proper operation of a/c cooling systm for the crew and accomodation spaces.
Due 7 June 2003
Resolved 13 May 2003
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 5 March 2002 Resolved
Overspeed on both port and starboard service generators did not operate properly. Vessel rep is to repair overspeed and prove operation prior to departure from port.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2002
Resolution: Overspeeds have been corrected.
Lifesaving
Issued 15 December 1999 Resolved
INSTALL APPROPRIATE WEAK LINK ON 12 MAN LIFE FLOAT. MANNING IS REDUCED TO NO MORE THAN 50 PERSONS WHILE WEAK LINK IS MISSING.
Condition: Unknown
Due 15 December 1999
Resolved 15 December 1999
Lifesaving
Issued 15 December 1999 Resolved
REPLACE/RENEW GRABLINE ON BOTH 25 MAN LIFE FLOATS.
Condition: Unknown
Due 15 December 1999
Resolved 15 December 1999
Construction/Loadline
Issued 15 December 1999 Resolved
INSTALL BILIGE ALARMS IN GENERATOR ROOM, MACHINERY SPACE, ENGINE ROOM AND ACCOMANDATION BILGE SPACE AS PER 46 CFR 182.530
Condition: Unknown
Due 15 December 1999
Resolved 15 December 1999
Electrical
Issued 17 December 1998 Resolved
RENEW OIL PRESSURE GAUGE ON STBD SHIP SERVICE DIESEL GENERATOR.
Condition: Unknown
Due 17 December 1998
Resolved 21 December 1998
Accommodation/Occupational Safety
Issued 17 December 1998 Resolved
PROVIDE RELIEF VALVE FOR HOT WATER HEATER LESS THAN 100 PSI.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Lifesaving
Issued 17 December 1998 Resolved
RENEW MISSING GREASE SCREEN IN GALLEY EXHAUST HOOD
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Electrical
Issued 17 December 1998 Resolved
REPAIR THRU BULKHEAD PACKING WIRING IN PUMP ROOM TO ENGINE ROOM ELECTRICAL WIRING
Condition: Unknown
Due 17 December 1998
Resolved 21 December 1998
Electrical
Issued 17 December 1998 Resolved
INSTALL BLANK IN GALLEY BREAKER PANEL IN WAY OF OPEN HOLE INSIDE ACCESS DOOR.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Engineering
Issued 17 December 1998 Resolved
INSTALL REMOTE STOPS FOR MAIN ENGINES IN WHEEL HOUSE IAW 46 CFR 175.10-29 OR 46 CFR 184.620.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Fire Fighting
Issued 17 December 1998 Resolved
PERFORM ANNUAL INSPECTION/SERVICING ON ALL PORTABLE EXTINGUISHERS.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Construction/Loadline
Issued 17 December 1998 Resolved
EVALUATE CORRISION DAMAGE INSIDE OF PORT MAIN PROPULSION ENGINE EXHAUST PIPE AND SUBMIT REPAIR PROPOSAL TO USCG.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Lifesaving
Issued 17 December 1998 Resolved
RE-ATTACH CLOTHES DRYER EXHAUST HOSE TO CLOTHES DRYER
Condition: Unknown
Due 17 December 1998
Resolved 21 December 1998
Lifesaving
Issued 17 December 1998 Resolved
RENEW LENS IN LIFE FLOAT LIGHT ON BOTTOM 25 MAN LIFE FLOAT.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Construction/Loadline
Issued 17 December 1998 Resolved
INSTALL OVERBOARD CUTOFF VALVES IN WAY OF THRU HULL FITTINGS FOR SINK (CREWS)
Condition: Unknown
Due 17 December 1998
Resolved 21 December 1998
Documentation
Issued 17 December 1998 Resolved
RENEW SAFETY RADIO TELEPHONE CERTIFICATE AND PROVIDE COPY OF SAME TO USCG,_x001C_PRESENT CERTIFICATE EXPIRED DECEMBER 1996.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Construction/Loadline
Issued 17 December 1998 Resolved
PROVIDE ACCESS TO LOWER FORE PEAK FOR INSPECTION PURPOSE.
Condition: Unknown
Due 17 December 1998
Resolved 21 December 1998
Lifesaving
Issued 17 December 1998 Resolved
BATTERY RENEWAL DATE EXPIRED DECEMBER 1996. PROVIDE AND INSTALL NEW BATTERY.
Condition: Unknown
Due 30 December 1998
Resolved 17 December 1998
Engineering
Issued 17 December 1998 Resolved
REPAIR OIL LEAK AT STBD MAIN PROPULSION ENGINE TURBOCHARGER.
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Electrical
Issued 17 December 1998 Resolved
MOUNT LOOSE ELECTRICAL RECEPTACLE IN CREWS HEAD (FORWARD STBD)
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Construction/Loadline
Issued 17 December 1998 Resolved
REPAIR CENTER & PORT STRUTS, RENEW STBD DAMAGED STBD AHFT BEARING.
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Construction/Loadline
Issued 17 December 1998 Resolved
REPAIR CRACK AT LONGITUDINAL STIFFNER AFT SIDE OF PORT MAIN PROPULSION ENGINE EXHAUST THRU HULL, AFT SIDE.
Condition: Unknown
Due 17 December 1998
Resolved 17 December 1998
Engineering
Issued 17 December 1998 Resolved
RENEW BADLY CHAFFED OIL FLEXIBLE OIL HOSES FROM REDUCTION GEAR TO REDUCTIONGEAR OIL COOLER (TWO TOTAL)
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Engineering
Issued 17 December 1998 Resolved
RENEW FLEXIBLE LUBE OIL SUPPLY HOSE ON INBOARD TURBOCHARGER
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Engineering
Issued 17 December 1998 Resolved
RENEW FLEXIBLE HYDRAULIC OIL HOSE FROM REDUCTION GEAR SELECTOR VALVE TO OILCOOLER. _x001C_ _x001C_ X
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Engineering
Issued 17 December 1998 Resolved
RENEW FLEXIBLE LUBE OIL SUPPLY HOSES TO BOTH TURBOCHARGERS ON CENTER MAIN PROPULSION ENGINE.
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Engineering
Issued 17 December 1998 Resolved
RENEW FLEXIBLE OIL HOSE(S) ON PORT MAIN PROPULSION ENGINE REDUCTION GEAR OIL COOLER (TWO TOTAL)
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Engineering
Issued 17 December 1998 Resolved
RENEW SUPPLY AND DISCHARGE HOSES ON HYDRAULIC POWER PACK (PUMP)
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Engineering
Issued 17 December 1998 Resolved
RENEW SUPPLY OIL HOSES ON INBOARD AND OUTBOARD TUROBCHARGERS PORT MAIN PROPULSION ENGINE.
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Navigation
Issued 17 December 1998 Resolved
REPAIR HYDRAULIC OIL LEAK ON HYDRAULIC POWER PACK AT REGULATING VALVE ADJUSTMENT NUT.
Condition: Unknown
Due 21 December 1998
Resolved 21 December 1998
Construction/Loadline
Issued 31 October 1997 Resolved
SUBMIT A WRITTEN REPAIR PROPOSAL TO THE COAST GUARD FOR REPAIRS TO FIRE DAMAGE OF VESSEL. ADVISE THE COAST GUARD OF ALL VESSEL MOVEMENTS PRIOR TO MOVEMENTS.
Condition: Unknown
Due 31 October 1997
Resolved 31 October 1997
Navigation
Issued 23 December 1996 Resolved
Place bushing in deadman for ram on steering gear.
Condition: Unknown
Due 23 December 1996
Resolved 23 December 1996
Fire Fighting
Issued 23 December 1996 Resolved
Repair engine vent hatch cover latches on deck.
Condition: Unknown
Due 23 December 1996
Resolved 23 December 1996
Construction/Loadline
Issued 23 December 1996 Resolved
Replace window seals throughout vessel where needed.
Condition: Unknown
Due 23 December 1996
Resolved 23 December 1996
Construction/Loadline
Issued 29 December 1995 Resolved
REPAIR/REPLACE HATCH COVER TO FOREPEAK AND MAKE READY FOR INSPECTION.
Condition: Unknown
Due 29 December 1995
Resolved 29 December 1995
Engineering
Issued 14 May 1991 Resolved
PROVIDE MAIN ENGINE STARTS AND STOPS IN WHEELHOUSE AS REQUIRED BY 46 CFR SUBCHAPTER "T"
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991
Unknown
Issued 10 January 1985 Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO THE VESSEL [name withheld]603076
Condition: Unknown
Due 10 January 1985
Resolved 10 January 1985
Construction/Loadline
Issued 10 January 1985 Resolved
REPAIR, REPLACE DAMAGED DECK HATCHES FOR MACHINERY COMPARTMENT.
Condition: Unknown
Due 10 January 1985
Resolved 10 January 1985

Casualty record · 4

26 October 2010Routine · role: Involved in a Marine Casualty · activity 3878111
12 July 2011Routine · role: Involved in a Marine Casualty · activity 4089341
19 June 2013Routine · role: Involved in a Marine Casualty · activity 4632264
1 August 2018Routine · role: Transiting Vicinity of Primary Subject · activity 6498322
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

AET SHELBY (2010–2013). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.