Records from 2006 to 2026. Most recent: inspection, 25 March 2026.
Inspection history · 31
25 March 2026
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8331853
11 April 2025
Plan Review (Other than "T")
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8105338
20 February 2025
Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8034096
14 February 2024
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7865584
17 January 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7851824
27 November 2023
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7828022
17 October 2023
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7809716
22 September 2023
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7796419
24 May 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7695386
6 May 2023
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7696495
10 February 2023
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7635043
10 February 2023
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7726450
21 November 2022
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7594090
11 August 2022
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7531102
24 May 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7457896
21 April 2022
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7435196
20 April 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7434440
1 April 2022
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7447093
21 January 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7378401
7 December 2021
Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7363695
18 September 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7061010
25 August 2020
Type not recorded
No type recorded · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7053943
9 December 2019
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6870764
25 April 2019
In-Service Inspection · Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6669973
1 February 2019
In-Service Inspection · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6618845
10 January 2019
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6604917
29 November 2017
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6300507
21 March 2017
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6095662
12 January 2017
Deficiency Check · Drydock Exam · Plan Review (Other than "T") · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6069787
15 December 2016
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6056353
25 January 2016
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5796297
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 February 2025
Resolved
Crane onboard needs to be in accordance with API.
46 CFR 126.130
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2025
Resolved 9 April 2025
Resolution: Carne was tested by Sothrern Crane and Hydraulics, API and OSHA regs.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 February 2025
Resolved
The master shall provide satisfactory evidence of the servicing of fire-extinguishing equipment, required by paragraph (c) of this section, to the marine inspector. FM 200 needs to be commissioned by local OCMI. Vessel is required to provide documentation.
46 CFR 132.350
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2025
Resolved 21 February 2025
Resolution: Received documentation attesting to the local OCMI oversight on the installation of the FM 200 fire suppression system, sat.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 20 February 2025
Resolved
Each vessel must have on board a radiotelephone capable of transmitting and receiving on the VTS designated frequency in Table 161.12(c) (VTS and VMRS Centers, Call Signs/MMSI, Designated Frequencies, and Monitoring Areas). VHF radios not displaying MMSI numbers.
33 CFR 26.03(f)
Action required: 10 - Deficiency Rectified
Resolved 20 February 2025
Resolution: After multiple attempts, Captain was able to demonstrate that the primary VHF radio displayed the MMSI number.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 January 2024
Resolved
Demonstrate de-watering of engine room with the installed system, including emergency bilge suction
Action required: 705 - Other - as specified
Resolved 25 January 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 January 2024
Resolved
Replace 1P mud tank suction butterfly valve
Action required: 705 - Other - as specified
Resolved 25 January 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 January 2024
Resolved
#3 fuel tank valve is seized, provide new valve and provide paper work to show type & size
Action required: 705 - Other - as specified
Resolved 25 January 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 May 2023
Resolved
It was discovered that he vessel was hauled out at Bayonne Dry-dock & Repair to have a shaft replaced. The local Officer in Charge, Marine Inspection (OCMI)was never notified of the haul-out or of the damaged shaft. The master, owner, operator, or agent of the vessel shall notify the OCMI whenever the vessel is to be dry-docked regardless of the reason for dry-docking, the OCMI, upon notification, will determine whether to assign a marine inspector to examine the underwater hull of the vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2023
Resolved 25 May 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 May 2023
Resolved
The operator replaced the shaft without any notification. No repairs affecting the safety of the vessel shall be made without the knowledge of the Officer in Charge, Marine Inspection (OCMI), when necessary the repairs or alterations must be inspected by a marine inspector. Prior to operation provide to the OCMI the following: (a) What was the cause of the need to replace the tail shaft. (b) The date, time and location when damage to the shaft was discovered.(c) The name of the Master of the vessel when the damage occurred. (d) Due to the reduction in propulsion, provide a CG2692.
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2023
Resolved 25 May 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 21 November 2022
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 27 November 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 21 April 2022
Resolved
Drawings or alterations shall be approved before work is started until deemed unnecessary by the Officer in Charge, Marine Inspection. Vessel has installed 02 PAMs consisting of 01 25ft and 01 42ft on deck. MSC Approval letter dated April 22, 2019 (Letter Serial #C2-1901085) references plan approval for installation of 01 42ft singular PAM. Vessel is not authorized to utilize or occupy the installed 25ft PAM until MSC approval for such installation is granted.
46 CFR 91.45-1 (b)
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 29 April 2022
Resolution: Received approval from MSC.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 February 2022
Resolved
Vessel is outfitted with a FM-200 extinguishing system that was not installed in accordance with Coast Guard Marine Safety Center approval letter E1-2101794. The vessel is not required a fixed fire fighting system. However, when extinguishing systems are installed they must meet the applicable regulations. Complete the following items to obtain Coast Guard approval:
1. Obtain approval for FM-200 system as installed, or install system as approved by Coast Guard Marine Safety Center approval letter E1-2101794.
2. Make system available to Sector NY Marine Inspector to confirm installation, workmanship and testing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 May 2022
Resolved 18 November 2022
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 21 January 2022
Resolved
Make fire control plan available for final inspection.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 16 February 2022
Resolution: Stamped fire conrtol plan.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 7 December 2021
Resolved
All fire detection and extinguishing systems, all piping controls, valves and alarms must be checked to ascertain that the system is in operating condition. Unable to provide fire detection servicing report. Provide fire detection servicing report prior to movement of vessel.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 7 December 2021
Resolved 7 December 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 December 2021
Resolved
At least two lifebuoys on the vessel must be fitted with a self-activating smoke signal approved under approval series 160.157. Outfit vessel with 02 self-activating smoke signals prior to operating on an oceans route. Vessel will be restricted to coastwise route.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 7 December 2021
Resolved 13 December 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 7 December 2021
Resolved
The deck line shall be marked amidships on each side of the vessel, and its upper edge shall normally pass through the point where the continuation outwards of the upper surface of the freeboard intersects the outer surface of the shell; Deck lines on both sides of the vessels were faded; Remark load lines on both sides of the vessel prior to voyages beyond the boundary line.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 7 December 2021
Resolved 13 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 7 December 2021
Resolved
Lagging/insulation must be installed on the exhaust piping on generator set #2 to prevent personal injury and heat source.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2022
Resolved 13 December 2021
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 7 December 2021
Resolved
As appropriate for the intended voyage, each vessel must carry adequate and up-to-date paper charts of large enough scale to make safe navigation possible; paper charts for the vessel’s operating area were not updated through the most recent NTM and LNTM; correct paper charts prior to engaging on an oceans route
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 December 2021
Resolved 13 December 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 7 December 2021
Resolved
For each watertight door which is in a required subdivision bulkhead, an indicator light must be installed in the pilothouse. The indicator must show whether the door is opened or closed; Watertight door indicators for the CLOSED position were missing on the pilothouse.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2022
Resolved 13 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 December 2021
Resolved
Vessel ground detection system on main distribution panel on bus A&B was showing/detecting a ground, must find source of grounds, take corrective action, submit report explaining each item found, and prove to Coast Guard Marine Inspector no grounds remain in system.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2022
Resolved 13 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 December 2021
Resolved
Electrical equipment must be installed, and maintained to protect crew members and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment and electrical shock. Properly wire and secure portable water pump/head tank. Armor cable on both controls are is frayed and not properly connected that could be an electrical hazard to personnel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2022
Resolved 13 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 December 2021
Resolved
Electrical equipment must be installed and maintained to protect crew members and the vessel from electrical hazards. The bow thruster consta-volt battery charger has wires on both sides that are not properly connected which could cause an electrical hazard to personnel, must connect wire properly to housing.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2022
Resolved 13 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 December 2021
Resolved
Electrical equipment must be installed and maintained to protect crew members and the vessel from electrical hazards. A wire feeding an unknown circuit at the L-1 208/120 volt panel is cut and pulling out of the panel from the underside that could be an electrical hazard to personnel. Must correctly terminate this wire to panel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2022
Resolved 13 December 2021
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 7 December 2021
Resolved
Fire and safety plans shall be kept up-to-date with the general arrangement of firefighting and lifesaving equipment onboard; Fire and safety plans onboard the vessel had excessive pen and ink changes that made it difficult to ascertain the location of all required firefighting and lifesaving equipment onboard; Update fire and safety plans by the conclusion of next scheduled drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 December 2021
Resolved 18 November 2022
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 December 2019
Resolved
Vessel must conduct monthly checks/inspections of portable fire extinguishers.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 December 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 January 2019
Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1 and Part 1, Section 23 of NFPA 302. Welded brackets throughout exhaust system were found to be broken or cracked. Heat shielding was removed from portions of the exhaust pipes.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2019
Resolved 23 January 2019
Resolution: New brackets were fabricated and welded in. Heat shielding was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 10 January 2019
Resolved
Maintenance of system integrity through compliance with the applicable system requirments (IEEE, NEC, IEC, etc.) to which plan review has been approved. Electrical wiring was found to be "dead ended" with unsheathed electrical cables.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2019
Resolved 10 January 2019
Resolution: Exposed wires were capped to eliminate accidental contact and potential ignition source.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 12 January 2017
Resolved
Renew upper gusset in the portside potable water tank on the forward most frame.
Action required: 705 - Other - as specified
Resolved 16 January 2017
Resolution: The gusset was renewed and verified.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 12 January 2017
Resolved
Renew gusset in chain locker on stbd side on center frame
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 16 January 2017
Resolution: Gusset was renewed
Documentation › Certificates/Documents › Stability Letter
Issued 12 January 2017
Resolved
Submit weight change calculations to MSC for review and approval.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 26 January 2017
Resolved 13 March 2017
Resolution: Calculations submitted to the MSC
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 12 January 2017
Resolved
Submit keel cooler installation plans to MSC for reveiw and approval.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 26 January 2017
Resolved 13 March 2017
Resolution: Keel cooler plans were submitted to the MSC for approval.