Records from 2000 to 2026. Most recent: inspection, 20 May 2026.
Inspection history · 46
20 May 2026
Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8325004
9 May 2025
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8123926
4 April 2025
Drydock Exam · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8106137
4 June 2024
Annual Inspection · Deficiency Check · Cargo Tank Internal
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7927482
5 March 2024
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7874510
25 April 2023
Periodic Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7675069
20 July 2022
Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7509826
5 August 2021
Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7277307
30 July 2020
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7018170
13 May 2020
Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6952558
6 December 2019
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6868571
16 April 2019
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6667371
24 April 2018
Annual Inspection · Cargo Tank Internal · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6383931
25 April 2017
Periodic Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6123818
7 April 2016
Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5848977
24 September 2015
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5727776
4 March 2015
Internal Structural Exam · Drydock Exam · MTSA Verification · COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5078860
10 June 2014
Annual Inspection · Cargo Tank Internal
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4857705
17 July 2013
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4656296
28 June 2012
Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4359328
17 August 2011
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 4144882
11 August 2011
Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 4096256
23 September 2010
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3855643
12 July 2010
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3794350
19 June 2010
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3772467
2 June 2010
Hull Examination · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3740625
7 August 2009
Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3564054
8 July 2009
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3547858
29 June 2009
Cargo Tank Internal · Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3518624
19 June 2008
MTSA Verification · Annual Inspection · Internal Structural Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3240968
23 January 2008
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3134985
9 October 2007
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3076108
18 July 2007
Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 2999749
17 August 2006
Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 2772089
14 July 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2426495
20 June 2005
Cargo Tank Internal · Hull Examination · COI Inspection · Internal Structural Exam
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2396140
24 November 2004
MTSA Verification · Periodic Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2249553
10 November 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2238922
25 August 2004
Cargo Tank Internal
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2180937
4 May 2004
Internal Structural Exam
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2058774
29 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1997391
10 November 2003
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1945007
26 November 2002
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1710992
11 September 2001
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1439257
7 June 2001
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 96516
30 August 2000
Initial Construction-Excluding Oversight · Hull Examination · Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1437776
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 4 June 2024
Resolved
Nothing in this subpart limits the marine inspector from conducting such tests or inspections he or she deems necessary to be assured of the vessel's seaworthiness. A majority of void hatch dog attachments were found Seized. Prove proper operation.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 24 June 2024
Resolution: Maintenance on the dogs were conducted by the crew. Accepted objective evidence.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 4 June 2024
Resolved
Each tank vessel must meet the applicable requirements in subchapter S of this chapter. Closure for aft tank gauging was missing pin. Forward port vent closure hinge bolts were seized. Install pin for gauging closure and prove operation of vent hinge bolts.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 24 June 2024
Resolution: The pin for open gauging hatch was installed. Accepted objective evidence.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 4 June 2024
Resolved
The frequency of the tests and inspections required by this section must be:(3) For vessels, annually or as part of the biennial and mid-period inspections. Provide annual testing/calibration report for pump discharge
gauges.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 24 June 2024
Resolution: Pump gauges calibrated. Accepted objective evidence
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 June 2024
Resolved
When installed, the metallic armor or sheath must meet the installation requirements of Section 6 of IEEE 45.8-2016 (incorporated by reference; see § 110.10-1 of this subchapter). Sheathing on cable for secondary pumps was wasted. Renew in kind.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2024
Resolved 24 June 2024
Resolution: The sheathing for secondary pump power cable was renewed. Accepted objective evidence.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 25 April 2023
Resolved
A pressure gage shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls. Vessel does not have any pressure gages installed at the cargo pump or header. Vsl must provide gages iaw this part. 46 CFR 32.50-6
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 March 2024
Resolved 5 March 2024
Resolution: Pressure gauge installed for each pump.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 25 April 2023
Resolved
Barges carrying grades D and E cargo must provide gooseneck venting with flame screens. Flame screens on cargo tank deck seal vents are wasted. Vessel must provide serviceable 30x30 flame screens. 46 CFR 32.55-25(c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 March 2024
Resolution: Flame screens renewed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 April 2023
Resolved
Connections and terminations to all conductors must retain the original electrical, mechanical an fire retardant properties as the original cable. Barge has three dead end wire in the cargo pump control board. Vessel must remove the dead end wires or provide a junction box which provides the same safety properties as the cabling. 46 CFR 111.60-17
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 March 2024
Resolution: Dead ended wire in console removed and stuffing tube capped
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 16 April 2019
Resolved
Nav light working electrical conduit wasted at the end.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2019
Resolved 23 April 2019
Resolution: Conduit sealed.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 16 April 2019
Resolved
Multiple hatches with dogs frozen, hareware expanded from corrosion. Replaced as marked and discussed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2019
Resolved 23 April 2019
Resolution: New hatches and dogs installed and free.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 April 2019
Resolved
wing void #3 STBD vent wasted.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2019
Resolved 23 April 2019
Resolution: New vent installed
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 24 April 2018
Resolved
TWO CARGO PUMPS MISSING DUE TO LEAKING SEALS AND REBUILD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2018
Resolved 30 May 2018
Resolution: Cargo pumps replaced and installed all testing sat prior to placing in to service.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 24 April 2018
Resolved
Conduct grinding and welding as per submitted approved plans in cargo hold 1 and 2.
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2018
Resolved 30 May 2018
Resolution: Ground and rewelded all welds as ID'd by marine inspector. All SAT. 90% of vertical welds in cargo tank 1 and 2 repaired and two over head tank top welded in tank 2.
Construction/Loadline › Structures › Scuttle
Issued 24 April 2018
Resolved
replace void #2 and #3 hatches due to wasted knife edge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2018
Resolved 22 May 2018
Resolution: Two new hatches installed and labeled properly.
Deck/Cargo › Vapor Control Systems › Flame Screens
Issued 10 June 2014
Resolved
Renew cargo tank flame screens IWO fore/aft ullage openings
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Vapor Control Systems › Flame Screens
Issued 10 June 2014
Resolved
Renew cargo tank flame screens (small) IWO cargo tank top(s) (vent)
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Cargo Stowage › General
Issued 10 June 2014
Resolved
Properly secure (tighten) blank flange IWO aft cargo tank top
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 10 June 2014
Resolved
Properly secure (tighten) cargo pipeline bracket IWO centerline/aft 3/4 length of barge
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 10 June 2014
Resolved
Properly secure deck grating IWO STBD outboard and aft cargo pumps
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Gaskets
Issued 10 June 2014
Resolved
Renew gasket IWO fwd cargo tank ullage opening (gap in the gasket)
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 10 June 2014
Resolved
Grind/weld localized pitting IWO cargo tank (both fore and aft tanks: as marked)
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 10 June 2014
Resolved
Grind/weld overflow piping IWO ullage openings (fore and aft of cargo tanks)
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 10 June 2014
Resolved
Grind/weld corner joints IWO fwd/aft cargo tanks due to heaving etching
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Communications › Visual Communication › Red Warning Signal
Issued 10 June 2014
Resolved
Repair/replace cargo transfer light (led) IWO main power panel (STBD main deck)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 10 June 2014
Resolved
Crop/renew wasted piping IWO cargo tank top (cargo pipeline containment drain piping)
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Holds/Tanks › Hatch
Issued 10 June 2014
Resolved
Crop/renew wasted hinge (hatch) IWO #1 STBD void.
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 10 June 2014
Resolved
Crop/renew wasted hatch cover IWO bow void (STBD)
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Deck/Cargo › Holds/Tanks › Hatch
Issued 10 June 2014
Resolved
Renew hatch dog ears and hatch ring IWO: Port #6 and 7, STBD #4 and 6
Action required: 705 - Other - as specified
Due 10 July 2014
Resolved 25 June 2014
Electrical › Electrical Distribution System (service) › Conductor
Issued 11 August 2011
Resolved
Secure electrical cable IWO FWD tank level indicator
Action required: 705 - Other - as specified
Due 22 August 2011
Resolved 11 August 2011
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 11 August 2011
Resolved
Test cargo pup shutdowns in the presence of the attending marine inspector.
Action required: 705 - Other - as specified
Due 11 September 2011
Resolved 28 June 2012
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 29 June 2009
Resolved
Gouge and weld etched vertical welds IWO FWD and AFT cargo tank corners (FWD & AFT). The etching/washing was discovered at the toe of the welds 1/32" and runs the entire length of the weld. Perform NDT upon completion to the satisfaction of the attending marine inspector. The cause of this phenomenon is unknown and seems specific to the acid cargoes carried.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2010
Resolved 2 June 2010
Resolution: This was closely examined and does not seem to affect the integrity of the weld, however this should be carefully examined at each internal structural exam and drydock.
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 29 June 2009
Resolved
Correct/repair indicated ground IWO 240v ground detection panel ("A" phase).
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 August 2009
Resolved 7 August 2009
Resolution: Resolved. Found in panel board.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 29 June 2009
Resolved
Modify cargo manifold containment sliding covers as to allow effective containment during transfer operations. Modify as indicated above or remove entire containment cover during all transfer operations.
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 August 2009
Resolved 7 August 2009
Resolution: Corrected.
Construction/Loadline › Hull › Hull Plating
Issued 19 June 2008
Resolved
Crop and renew bent #4 web gusset in the bilge knuckle on port side of the bow rake.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 20 June 2008
Construction/Loadline › Hull › Longitudinal Frame
Issued 19 June 2008
Resolved
Crop and renew bent frame in port side stern box frame #1 between stern longs 1 and 4.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 20 June 2008
Construction/Loadline › Hull › Weld
Issued 19 June 2008
Resolved
Gouge and weld fractured welds on port side #2 frame between 2 and 3 stern longs
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 20 June 2008
Construction/Loadline › Hull › Weld
Issued 19 June 2008
Resolved
Gouge and weld fractured welds on stbd side #1 frame between 2 and 3 stern longs
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 20 June 2008
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 19 June 2008
Resolved
Paint inside of navigation lights shields flat black
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 20 June 2008
Electrical › Lighting (service) › Outlet Box
Issued 24 November 2004
Resolved
REPLACE FWD NAVIGATION [name withheld].
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 November 2004
Resolution: JUNCTION BOX REPLACED.
Deck/Cargo › Cargo Stowage › General
Issued 24 November 2004
Resolved
REPLACE FLAME SCREENS FOR ALL ULLAGE OPENINGS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 November 2004
Resolution: SCREENS REPLACED.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 24 November 2004
Resolved
PROPERLY POSITION STBD NAVIGATION LT.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2004
Resolution: [name withheld] ON SCREEN.
Deck/Cargo › Cargo Stowage › General
Issued 24 November 2004
Resolved
REPLACE CARGO PIPE DISCHARGE PRESSURE GUAGE.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 November 2004
Resolution: NEW GUAGE INSTALLED.
Deck/Cargo › Holds/Tanks › Ullage
Issued 24 November 2004
Resolved
REPLACE ERL VIEWING PORT COVERS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 November 2004
Resolution: COVERS INSTALLED OVER GLASS VIEWING PORT.
Deck/Cargo › Holds/Tanks
Issued 26 November 2002
Resolved
REPLACE TORN OR MISSING 30 X 30 FLAME SCREENS FOR NUMBER 1 AND 2 CARGO TANKS. LEGACY COMPONENT DESC: Flame Arrester
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 November 2002