MAURY USCG vessel records
← All vessels

B-14

B-14 is a 1969 tank barge. The Coast Guard has recorded 62 inspections since 1985, most recently in April 2015, along with 81 deficiencies — 11 with no resolution recorded — and 3 casualty investigations between 2004 and 2010.

Records from 1985 to 2015. Most recent: inspection, 6 April 2015.

Built
1969
Last inspected
6 April 2015
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 11 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 6 April 2015
…with no type recorded10
…past their stated due date11
Operational controls None recorded without a removal date
Years with a record 29 calendar years (1985–2015)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
UNITED STATES
Maury page id
psix-51129

Documentation record

Tonnage as PSIX records it791 - Regulatory (Subpart C or D), Gross Ton
791 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

ISLAND MERCHANT Towing Vessel · MISLE 89891 · 3 March 2010 · activity 3690265MR BILL Towing Vessel · MISLE 96531 · 27 July 2005 · activity 2442796MR BILL Towing Vessel · MISLE 96531 · 12 April 2004 · activity 2043126ISLAND MERCHANT Towing Vessel · MISLE 89891 · 6 August 2003 · activity 1903369

Inspection history · 62

6 April 2015 Cargo Tank Internal · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5097377
4 August 2014 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4943422
10 February 2014 Deficiency Check · Internal Structural Exam · Periodic Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4793463
30 March 2012 MTSA Verification · Annual Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4274626
5 November 2010 Examination of Repairs · In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3885617
17 September 2010 Examination of Repairs · In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3853969
9 June 2010 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3762505
7 April 2010 MTSA Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3709419
3 March 2010 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3690265
1 September 2009 Deficiency Check · Examination of Repairs
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3583031
17 April 2009 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3454516
27 March 2009 Re-Inspection · MTSA Verification · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3439805
15 April 2008 Hull Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3177556
28 March 2008 MTSA Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3172902
23 April 2007 Annual Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2911540
6 April 2006 COI Inspection · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2617978
4 January 2006 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2561107
2 August 2005 Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2448879
2 August 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2448901
27 July 2005 Damage Survey
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2442697
27 July 2005 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2442796
16 May 2005 Annual Inspection · MTSA Verification · Cargo Tank Internal
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2359602
16 April 2004 Annual Inspection · Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2049138
13 April 2004 Uninspected Other
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2044337
12 April 2004 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2043126
16 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1991441
11 August 2003 Damage Survey · Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1873833
6 August 2003 Damage Survey
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1870117
6 August 2003 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1903369
20 May 2003 Hull Examination · Annual Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1797821
29 April 2002 Re-Inspection · Cargo Tank Internal
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1612498
6 March 2002 Administrative Inspection · In-Service Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1491499
23 April 2001 COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1450609
24 April 2000 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1439002
16 April 1999 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1384101
25 June 1998 Hull Examination · Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1467549
17 April 1997 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1413144
28 August 1996 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1428672
4 June 1996 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1086333
6 November 1995 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 885990
7 July 1995 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 642764
29 June 1995 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1432921
19 March 1995 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 150918
18 May 1994 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1449695
12 August 1993 Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 848178
14 July 1993 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 116208
11 May 1993 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 829716
4 September 1992 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1249697
1 May 1991 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1243169
9 May 1990 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 912351
10 November 1989 Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1215737
11 July 1989 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1204411
21 April 1989 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 504015
18 April 1989 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1034947
30 November 1988 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 902156
7 October 1988 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1194367
10 May 1988 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1035073
18 June 1987 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1028869
15 April 1987 Drydock Extension
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1003928
15 April 1987 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1021786
19 June 1986 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1303206
27 April 1985 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 979610

Deficiency record · 81

Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 11 February 2014 Resolved
Renew or hydrostatically test CO2 extinguisher onboard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 February 2014
Resolution: Replaced Ext
Deck/Cargo › Cargo Stowage › General
Issued 11 February 2014 Resolved
Provide documentation for testing for all P/V Valves onboard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 February 2014
Resolution: Recieved Cert
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 11 February 2014 Resolved
Renew wasted piping on remote shutdown for cargo pump.
Due 18 February 2014
Resolved 14 February 2014
Resolution: Replaced leaking pipe
Electrical › Electric Supply System (service) › Battery Installation
Issued 11 February 2014 Resolved
Provide documentation that AIS tracking system electrical components are intrinsically safe and explosion proof or move the electrical system outside of 10' away from cargo pipe flange.
Due 18 February 2014
Resolved 14 February 2014
Resolution: Removed equipment/discouneted
Construction/Loadline › Structures › Rake
Issued 11 February 2014 No resolution recorded
Properly repair fracture on #5 longitudinal and diagonal at #1 frame in forward rake.
Action required: 705 - Other - as specified
Due 16 May 2015 — due date passed with no resolution recorded
Construction/Loadline › Structures › Rake
Issued 11 February 2014 No resolution recorded
Properly repair fracture on #7 longitudinal and diagonal at #1 frame in forward rake.
Action required: 705 - Other - as specified
Due 16 May 2015 — due date passed with no resolution recorded
Construction/Loadline › Structures › Rake
Issued 11 February 2014 No resolution recorded
Properly repair fracture on #9 longitudinal and diagonal at #1 frame in forward rake.
Action required: 705 - Other - as specified
Due 16 May 2015 — due date passed with no resolution recorded
Construction/Loadline › Structures › Rake
Issued 11 February 2014 No resolution recorded
Properly repair fractured weld on #8 longitudinal at #1 frame in forward rake.
Action required: 705 - Other - as specified
Due 16 May 2015 — due date passed with no resolution recorded
Construction/Loadline › Hull › Transverse Frame
Issued 11 February 2014 No resolution recorded
Properly repair fractured weld on diagonal at overheard near #5 longitudinal and #3 frames.
Action required: 705 - Other - as specified
Due 11 February 2017 — due date passed with no resolution recorded
Construction/Loadline › Hull › Transverse Frame
Issued 11 February 2014 No resolution recorded
Properly repair fractured weld on #7 longitudinal at frame #6 in #1 STBD void.
Action required: 705 - Other - as specified
Due 11 February 2017 — due date passed with no resolution recorded
Construction/Loadline › Hull › Transverse Frame
Issued 11 February 2014 No resolution recorded
Properly repair fractured weld on #7 longitudinal at frame #7 in #1 STBD void.
Action required: 705 - Other - as specified
Due 11 February 2017 — due date passed with no resolution recorded
Construction/Loadline › Hull › Transverse Frame
Issued 11 February 2014 No resolution recorded
Properly repair fractured weld on #7 longitudinal at frame #14 in #3 STBD void.
Action required: 705 - Other - as specified
Due 11 February 2017 — due date passed with no resolution recorded
Construction/Loadline › Hull › Transverse Frame
Issued 11 February 2014 No resolution recorded
Properly repair fractured weld on frame #14 and overhead in #6 STBD void.
Action required: 705 - Other - as specified
Due 11 February 2017 — due date passed with no resolution recorded
Construction/Loadline › Hull › Transverse Frame
Issued 11 February 2014 No resolution recorded
Properly repair fractured weld on #1 and #7 longitudinal at frame #7 in #1 PORT void.
Action required: 705 - Other - as specified
Due 11 February 2017 — due date passed with no resolution recorded
Construction/Loadline › Hull › Transverse Frame
Issued 11 February 2014 No resolution recorded
Properly repair fractured weld on #1 and #7 longitudinal in #7 PORT void.
Action required: 705 - Other - as specified
Due 11 February 2017 — due date passed with no resolution recorded
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the Bow Void access hatch and associated coaming.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Machinery Space Opening
Issued 30 March 2012 Resolved
Crop and renew the Pump House door and associated frame.
Due 29 April 2013
Resolved 30 March 2012
Construction/Loadline › Hull › Stiffener
Issued 30 March 2012 Resolved
Gouge and reweld the fractured weld in way of FR. 9, sideshell longitudinal in Void #1P.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #1P Void hatch cover.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #2P Void hatch and associated coaming.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Hull › Double Hull
Issued 30 March 2012 Resolved
Descale the #2P Void excess rust.
Condition: Improper/Lack of Maintenance
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #4P Void hatch and associated coaming.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #5P Void hatch and associated coaming.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #6P Void hatch and associated coaming.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Hull › Double Hull
Issued 30 March 2012 Resolved
Descale the #6P Void excess rust.
Condition: Improper/Lack of Maintenance
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Trunk
Issued 30 March 2012 Resolved
Crop and renew the vertical access ladder in the #6P Void.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Hull › Stiffener
Issued 30 March 2012 Resolved
Gouge and reweld the fractured weld in way of FR. 30 sideshell stiffener in #7P Void.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Hull › Double Hull
Issued 30 March 2012 Resolved
Descale the #7P Void excess rust.
Condition: Improper/Lack of Maintenance
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the Stern Void access hatch and associated coaming.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › End Bulkhead
Issued 30 March 2012 Resolved
In the Stern Void, gauge the lower 24 inches of the cargo tank aft bulkhead.
Due 29 April 2013
Resolved 27 June 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #7S Void access hatch and associated coaming.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Hull › Bracket
Issued 30 March 2012 Resolved
Crop and renew the buckled underdeck transverse bracket just forward of FR. 32 in Void #7S.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Hull › Bottom Plating
Issued 30 March 2012 Resolved
In #6S Void, in way of FR. 27-1/2, bottom shell, spot gauge the pitted area. 04/12/2012: Spot Gauge complete. Crop and renew a minimum of 18 in. x 18 in. x O.S. the area in way of the pit. SplashZone epoxy temporary repair is permitted.
Due 29 April 2013
Resolved 27 June 2013
Construction/Loadline › Structures › Transverse Bulkhead
Issued 30 March 2012 Resolved
In Void #6S, gauge the FR. 25 bulkhead in way of the access trunk.
Due 29 April 2013
Resolved 27 June 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #5S Void access hatch and associated coaming.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Hull › Double Hull
Issued 30 March 2012 Resolved
Descale the excess rust in the #5S Void access trunk.
Condition: Improper/Lack of Maintenance
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Trunk
Issued 30 March 2012 Resolved
In the #5S Void crop and renew the vertical access ladder.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #3S Void access hatch and associated coaming.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #2S Void access hatch.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Structures › Manhole
Issued 30 March 2012 Resolved
Crop and renew the #1S Void access hatch.
Due 29 April 2013
Resolved 17 July 2013
Construction/Loadline › Hull › Transverse Frame
Issued 30 March 2012 Resolved
Crop and renew the #1 through #16 transverse cargo dome girders a minimum of 48 inches wide x original scantling in way of the removed cargo piping system.
Due 29 April 2013
Resolved 22 July 2013
Operations/Management › Cargo Transfer/Lightering › Making a Connection
Issued 30 March 2012 Resolved
Crop and renew the cheek plates on the starboard deck manual davit. The davit is not permitted to be used until this item is completed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 April 2013
Resolved 3 July 2013
Resolution: Removed.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 27 March 2009 Resolved
Renew the Void space manhole gaskets for Voids 5S, 6S, 7S, 5P and 6P.
Due 15 April 2009
Resolved 17 April 2009
Resolution: New gaskets installed.
Construction/Loadline › Hull › Stiffener
Issued 27 March 2009 Resolved
Submit to the Cognizant Officer in Charge, Marine Inspection, a written repair proposal for the repair / renewal of the localized wastage of the external cargo tank longitudinals.
Due 27 April 2009
Resolved 17 April 2009
Resolution: Received written repair plan.
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 27 March 2009 Resolved
Remove unused deck piping that is wasted or make properly operable.
Due 27 April 2009
Resolved 17 April 2009
Resolution: Unused piping removed.
Construction/Loadline › Hull › Stiffener
Issued 27 March 2009 Resolved
In the Forepeak, #5 starboard bottom longitudinal, crop and renew the 5 in. x 3-1/2 in. x 5/16 in. angle.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Renewed angle 61-1/2 in. x 5 in. x 3-1/2 in. x 5/16 in.
Construction/Loadline › Structures › Manhole
Issued 27 March 2009 Resolved
In the Void #6 Stbd, renew the manhole ring.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Manhole ring renewed in kind.
Construction/Loadline › Hull › Bracket
Issued 27 March 2009 Resolved
In the Void #6 Stbd, crop and renew the 12 in. x 12 in. x 5/16 in. corner bracket in way of the #2 lower side longitudinal in way of FR. 25.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Renewed bracket in kind.
Construction/Loadline › Structures › Manhole
Issued 27 March 2009 Resolved
In the Void #6 Stbd, crop and renew the vertical access ladder.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Renewed vertical ladder.
Construction/Loadline › Structures › Manhole
Issued 27 March 2009 Resolved
In the Stern Box Void, crop and renew the vertical access ladder.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: vertical ladder renewed.
Construction/Loadline › Hull › Stiffener
Issued 27 March 2009 Resolved
In way of the Cargo Tank weather deck, crop and renew the centerline 4 in. x 2 in. x 3/16 in. x 24 in., in way of the aft end of the external longitudinal.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Renewed external angle.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 27 March 2009 Resolved
In Void #4 Port, crop and renew FR. 16 (BHD), a minimum of 48 in. x 28 in. x original scantling, starting 30 in. above the bottom shell and in way of the side shell.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Bulkhead insert measures 49 in. x 29 in. x 3/8 in. with associated 12 in. x 12 in. x 3/8 in. triangle brackets.
Construction/Loadline › Hull › Stiffener
Issued 27 March 2009 Resolved
In Void #4 Port, crop and renew in way of FR. 16, the #3 side shell stiffener from the bottom, a minimum of 24 in. x 7-1/2 in. x 5 in. x 3/8 in. angle, and the associated 12 in. triangular bracket on both sides of the bulkhead (FR. 16.).
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Renewed in kind.
Construction/Loadline › Structures › Manhole
Issued 27 March 2009 Resolved
In Void #5 Port, gouge and reweld the fractured weld in the manhole ring.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Weld satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 27 March 2009 Resolved
In Void #5 Port, FR. 22, gouge and reweld the upper side longitudinal weld fracture.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Renewed in kind.
Construction/Loadline › Hull › Stiffener
Issued 27 March 2009 Resolved
In Void #5 Port, crop and renew the #4 side shell longitudinal from the bottom shell a minimum of 36 inches and the associated triangular bracket to original scantlings.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Renewed in kind.
Construction/Loadline › Hull › Stiffener
Issued 27 March 2009 Resolved
In Void #6 Port, FR. 25, crop and renew the #3 from the bottom side shell longitudinal, 36 in. x 5 in. x 3 in. x 1/4 in. angle and the associated 12 in. x 12 in. x 1/4 in. triangular corner bracket.
Action required: 705 - Other - as specified
Due 30 April 2013
Resolved 1 October 2009
Resolution: Renewed in kind.
Construction/Loadline › Hull › Side Shell
Issued 27 March 2009 Resolved
In way of FR. 19 through 20, starboard side of the cargo deck, crop and renew to original scanting, a minimum of 84 in. long x 48 in. high x original scantling.
Action required: 705 - Other - as specified
Resolved 1 October 2009
Resolution: Cargo deck insert measures 14 ft. 6 in. x 4 ft. 6 in. x 3/8 in.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 April 2007 Resolved
In the Forward Rake, crop and renew the #1 P & S off centerline diagonal to original scantling, in way of FR. 2 and 3. (Diagonals are deflected 3-1/2 inches. No welds are broken.)
Condition: Unknown
Due 31 May 2008
Resolved 28 March 2008
Construction/Loadline › Structures › Manhole
Issued 23 April 2007 Resolved
Renew the Forward Rake manhole cover.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 March 2008
Construction/Loadline › Hull › Stiffener
Issued 23 April 2007 Resolved
In Void #1 P - gouge and reweld the side long fracture in way of #4 side frame, #4 side long from the deck.
Due 31 May 2008
Resolved 28 March 2008
Construction/Loadline › Hull › Stiffener
Issued 23 April 2007 Resolved
In Void #5 - gouge and reweld the side long fracture in way of #4 side frame, bottom side long.
Due 31 May 2008
Resolved 28 March 2008
Construction/Loadline › Hull › Stiffener
Issued 23 April 2007 Resolved
In Void #6 P - gouge and reweld the side long fracture in way of #1 side frame, bottom side long.
Due 31 May 2008
Resolved 28 March 2008
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 23 April 2007 Resolved
In Void #2 P - Remove the 1 inch piping that is loose and not connected.
Condition: Unknown
Due 31 May 2008
Resolved 28 March 2008
Construction/Loadline › Hull › Bottom Plating
Issued 2 August 2005 Resolved
Starboad void #1, insert hull platting in way of bottom longitudinal #6 and swash bulkhead #2. Provide gauging report of bottom plate 24" to either side of swash bulkhead 2 to centerline.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 November 2005
Resolved 4 January 2006
Construction/Loadline › Hull › Double Hull
Issued 27 July 2005 Resolved
Internal exam of void tanks to check structural integrity after vsl grounded. To be conducted by cognizant OCMI prior to next cargo onload.
Action required: 705 - Other - as specified
Due 28 July 2005
Resolved 2 August 2005
Resolution: Inspected void and temp repairs.
Construction/Loadline › Hull
Issued 13 April 2004 Resolved
Upon completion of cargo operations vessel is to proceed to Green Cove Springs, Fl. to be gas freed and internals examined for damage prior to next cargo loaded. Completion to be done to the satisfaction of the cognizant [name withheld]: Bottom Plating
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 16 April 2004
Resolution: ISE conducted with no damage noted.
Construction/Loadline › Hull
Issued 6 August 2003 Resolved
VESSEL TO PROCEED TO BEAUFORT, SC FOR CARGO DISCHARGE WHILE CONDUCTING WATERTIGTNESS CHECKS EVERY HALF HOUR AND CONTACTING MSO SAVANNAH COMMS CENTER EVERY HOUR DURING TRANSIT. VESSEL IS THEN TO PROCEED TO GREEN COVE SPRINGS, FL FOR SURVEY FOR DAMAGES. VESSEL IS NOT CONDUCT ANY FURTHER CARGO OPS. LEGACY COMPONENT DESC: Bottom Plating
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 August 2003
Resolved 11 August 2003
Resolution: COMPLETED DAMGE SURVEY. CLEARED REQUIREMENT.
Construction/Loadline › Hull › Longitudinal Frame
Issued 20 May 2003 Resolved
Crop and renew the first, second, and third bottom longitudinals from the sideshell from bulkhead number twenty-five to bulkhead number twenty-eight, 18' X 5" by 3" X 3/8" (angle each).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2003
Resolution: Vsl representative properly cropped and renewed first, second, and third bottom longitudinals from the sideshell from bulkhead number twenty-five to bulkhead number twenty-eight, 18'' X 5" by 3" X 3/8" (angle each).
Construction/Loadline › Hull › Longitudinal Frame
Issued 20 May 2003 Resolved
Crop and renew the fourth and fifth bottom longitudinals from the sideshell from bulkhead number twenty-five to bulkhead aft, 48" X 5" by 3" X 3/8" (angle each). Crop and renew 6" of the 4" flat bar in way of 6" X 4" by 3/8" each.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2003
Resolution: Vsl representative properly cropped and renewed fourth and fifth bottom longitudinals from the sideshell from bulkhead number twenty-five to bulkhead aft, 48" X 5" by 3" X 3/8" and renewed 6" of the 4" flat bar in way of 6" X 4" by 3/8"
Construction/Loadline › Penetrations
Issued 20 May 2003 Resolved
Replace or properly repair sight glass of number three cargo tank gauging dome, 3" X 1/4" plate.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2003
Resolution: Vsl representative replaced sight glass of number three cargo tank gauging dome, 3" X 1/4" plate.
Construction/Loadline › Hull › Longitudinal Frame
Issued 20 May 2003 Resolved
Crop and renew frames number twenty-six and twenty-seven between the second and third bottom longitudinals from the sideshell. From the bottom hull up 18" X 24" by 3/8" each.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2003
Resolution: Vsl representative properly cropped and renewed frames number twenty-six and twenty-seven between the second and third bottom longitudinals from the sideshell; from the bottom hull up 18" X 24" by 3/8" each.
Documentation
Issued 29 June 1995 Resolved
PROVIDE PROOF OF APPROVED PLANS FOR INSTALLATION OF CARGO TANK HIGH LEVEL/ OVERFILL ALARM SYSTEM TO ATTENDING MARINE INSPECTOR NLT 31JUL95.
Condition: Unknown
Due 29 June 1995
Resolved 29 June 1995
Documentation
Issued 29 June 1995 Resolved
PROVIDE PROOF OF APPROVED SHIPBOARD OIL POLLUTION EMERGENCY PLAN (SOPEP) TOATTENDING MARINE INSPECTOR NLT 31JUL95.
Condition: Unknown
Due 29 June 1995
Resolved 29 June 1995
Documentation
Issued 18 April 1989 Resolved
PRIOR TO CARRIAGE OF ANY BULK CHEMICAL CARGO OTHER THAN CAUSTIC SODA SOLUTION, CG APPROVAL, CERTIFICATE AMENDMENT, AND VERFICATION EXAMINATION TO ENSURE COMPLIANCE WITH 46 CFR SUBCH 'O' FOR THAT CARGO IS REQUIRED.
Condition: Unknown
Due 18 April 1989
Resolved 18 April 1989
Construction/Loadline
Issued 18 April 1989 Resolved
VEE AND REWELD CRACKED WELDS OF SECOND FROM BOTTOM GUSSET, BETWEEN SIDESHELL AND LOG PLATE AT STBD SIDE OF AFT RAKE.
Condition: Unknown
Due 18 April 1989
Resolved 18 April 1989
Deck/Cargo
Issued 18 April 1989 Resolved
MAKE BARGE AVAILABLE FOR COAST GUARD INSPECTION OF CARGO TANK EXTERNALS.
Condition: Unknown
Due 18 April 1989
Resolved 18 April 1989
Deck/Cargo
Issued 18 April 1989 Resolved
RENEW WASTED AND HOLED CARGO HOSE BOOM DIAGONAL SUPPORTS.
Condition: Unknown
Due 18 April 1989
Resolved 18 April 1989
Deck/Cargo
Issued 10 May 1988 Resolved
INSTALL AND PROVE OPERATIONAL, CARGO OVERFLOW AND HIGH LEVEL ALARMS AS REQUIRED BY 46 CFR 153.408, 153.409, FOR THE CARRIAGE OF PHENOL. VESSEL IS NOT TO CARRY PHENOL UNTIL THIS REQUIREMENT IS COMPLETE.
Condition: Unknown
Due 10 May 1988
Resolved 10 May 1988
Deck/Cargo
Issued 15 April 1987 Resolved
CONDUCT SATISFACTORY HYDROSTATIC TEST OF MAIN CARGO PIPING AT 225 PSI.
Condition: Unknown
Due 15 April 1987
Resolved 15 April 1987
Deck/Cargo
Issued 15 April 1987 Resolved
MAKE ALL PRESSURE/VACUUM VALVES OPEN FOR INSPECTION.
Condition: Unknown
Due 15 April 1987
Resolved 15 April 1987

Casualty record · 3

12 April 2004Routine · role: Involved in a Marine Casualty · activity 2043126
27 July 2005Routine · role: Involved in a Marine Casualty · activity 2442796
3 March 2010Routine · role: Involved in a Marine Casualty · activity 3690265
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.