Documentation record
Registered dimensions (L × B × D)70.6 ft × 28.0 ft × 10.2 ft
Registered tonnagegross 96 / net 78
ITC dimensions (L × B × D)70.6 ft × 28.0 ft × 10.2 ft
ITC tonnageNot recorded
BuilderLA FORCE SHIPYARD · BAYOU LA BATRE, AL, UNITED STATES · built 2002
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 5 February 2026 · expires 31 March 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it96 - Regulatory (Subpart C or D), Gross Ton
78 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 43 inspections, each with its date, unit and type; 13 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 21 other vessels inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 43
25 March 2024
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7885416
25 March 2024
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7886256
12 September 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7790143
12 September 2023
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7790775
12 July 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7740849
6 March 2023
TPO Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7647927
17 February 2023
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7643876
30 December 2022
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7614524
22 November 2022
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7629634
25 September 2022
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7570600
14 April 2022
Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7438711
8 March 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7407858
7 January 2022
Type not recorded
No type recorded · Station Freeport · USCG Heartland District (CGD-H) · Activity 7377120
29 July 2021
TPO Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7272499
18 November 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7117789
26 July 2019
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6762927
26 July 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6765944
12 February 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6624392
12 February 2019
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6624522
5 September 2018
Administrative Inspection · Initial Certification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6532934
15 July 2018
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6481266
23 May 2018
MTSA Verification · Industry Initiated Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6421797
16 May 2015
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 5128167
16 April 2015
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5104506
24 March 2015
Industry Initiated Exam · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5089769
6 October 2013
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4738324
27 November 2012
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4491024
1 November 2012
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4478677
28 November 2011
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4215513
17 November 2011
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4191094
17 November 2011
Administration
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4204476
4 August 2011
Type not recorded
No type recorded · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 4105852
22 October 2010
Industry Initiated Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3877020
13 October 2010
Marine Casualty Follow Up
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3869873
12 October 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3887740
2 September 2010
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3840852
18 August 2009
Type not recorded
No type recorded · Suspension & Revocation National Center of Expertise · Activity 3706488
22 January 2009
Administration
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3398243
15 November 2008
Administration
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3363463
10 May 2004
Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 2068760
27 April 2004
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2078998
5 December 2002
Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 1716521
9 May 2002
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1627989
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 March 2024
Resolved
Repairs to existing towing vessels must be made in accordance with 46 CFR Part 143. Vessel is undergoing replacement of auxiliary generator; upon completion, provide TPO report attesting to satisfactory installation.
Condition: Invalid
Action required: 705 - Other - as specified
Due 28 March 2024
Resolved 28 March 2024
Resolution: Received technician report and TPO report attesting to satisfactory installation and testing of newly installed auxiliary generator.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 September 2023
Resolved
Rails or equivalent protection must be installed near the periphery of all decks accessible to crew. Equivalent protection may include lifelines, wire rope, chains, and bulwarks that provide strength and support equivalent to fixed rails. Vessel sustained significant damage to the rails and catwalk at the wheelhouse level following an allision. TPO letter of attestation that the vessel can safely navigate to a location to enact repair required prior the movement. TPO report of satisfactory repairs to follow.
46 CFR 144.800(a)
Action required: 60 - Rectify deficiencies prior to movement
Due 12 September 2023
Resolved 4 December 2023
Resolution: Recieved requested leter from TPO. Repairs to the super structure to the satisfaction of the TPO were completed. See documents.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 9 March 2023
Resolved
A fixed fire pump must be capable of: Delivering water simultaneously from the two highest hydrants, or from both branches of the fitting if the highest hydrant has a Siamese fitting, at a pitot-tube pressure of at least 344 kilopascals (kPa) (50 pounds per square inch (psi)), and a flow rate of at least 300 liters per minute (lpm) (80 gallons per minute (gpm)). Upon energizing fire pump, inspector discovered pump only capable of reaching 42 psi. 46 CFR 142.325(a)(1)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 March 2023
Resolution: Fire pump was inspected by TPO and is now operating IAW Subchapter M requirements.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 9 March 2023
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Found that the windings on both generators were excessively coated in oily dust mixture. 46 CFR 143.400
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 March 2023
Resolution: Windings on both generators are clean and operating properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 March 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Indicator light for generator operations was faulty. Renew/repair. 46 CFR 143.205(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2023
Resolved 23 March 2023
Resolution: Indicator light for the generator was replaced and is operating properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 March 2023
Resolved
Gauges must be provided at the machinery location for main engine lubricating oil pressure and main engine RPM. RPM gauge for stbd M/E was indicating 700 RPM when the engine was secure. Renew/repair gauge. MI witnessed Port MDE oil pressure gauge reading 20spi when engine was secured. Calibrate or Replace gauge. 46 CFR 143.230(c)(1)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2023
Resolved 23 March 2023
Resolution: Gauges on both MDEs were replaced and are operating properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 March 2023
Resolved
Gauges must be provided at the machinery location for generator engine RPM. P/S generators did not have a RPM gauge. Install gauge.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2023
Resolved 23 March 2023
Resolution: P/S Generators have operational RPM gauges.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 9 March 2023
Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. Starboard engine room hatch does not properly secure. Properly adjust dogs to ensure engine room hatch is watertight.Second deck dogs must be adjusted in order to be secured properly. Both weather tight engine room doors not sealing properly due to improper gasket and lose securing devices. Ensure all weathertight doors properly seal. 46 CFR 144.320(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2023
Resolved 23 March 2023
Resolution: Both WTDs have been adjusted and gaskets have been replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 March 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The main exhaust has a significant leak causing a build up of soot on the stack. Properly repair exhaust and clean lagging. 46 CFR 143.205(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2023
Resolved 23 March 2023
Resolution: All leaks in the main exhaust have been repaired and new lagging was installed.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 9 March 2023
Resolved
Each device must be free of design defects such as rough or sharp edges that may cause bodily injuries or that would allow toxic substances to escape to the interior of the vessel. MSD has temporary repair patches that must be made permanent. 33 CFR 159.95(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2023
Resolved 23 March 2023
Resolution: Permanent repairs have been made to MSD. A new MSD is on order, but there is a 6-month backlog. This item was placed in the companies CAR system to be followed up on when a new MSD is available.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 March 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Numerous soft patch found on both MDE's cooling/jacket water/expansion tank piping. Verify that piping is not damaged. 46 CFR 143.205(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2023
Resolved 23 March 2023
Resolution: Flex hoses within the MDE piping system were there by design. Any questionable flex hoses were replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 March 2023
Resolved
All bilges and void spaces are kept free from accumulation of combustible and flammable materials and liquids insofar as practicable. Cofferdams by both shaft seals had oil and other liquids inside, clean/remove all liquids from area. 46 CFR 143.205(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2023
Resolved 23 March 2023
Resolution: Cofferdams under both shaft packings were cleaned.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 March 2023
Resolved
The hose must be a lined commercial fire hose 15 meters (50 feet) in length, at least 40 millimeters (1.5 inches) in diameter, and fitted with a nozzle made of corrosion-resistant material capable of providing a solid stream and a spray pattern. Fire hose was damaged nearly to the point of inoperability. Replace fire hose. 46 CFR 142.325(d)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2023
Resolved 23 March 2023
Resolution: New fire hose was installed and was then tested during follow-up survey.