Built
1980
Last inspected
13 February 2026
Controls
None recorded without a removal date
Also recorded as
701 (2003–2005)

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.

Inspection record

Last inspected 13 February 2026
…with no type recorded20
Operational controls None recorded without a removal date
Years with a record 39 calendar years (1985–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
UNITED STATES
Tonnage
2550 - Regulatory (Subpart C or D), Gross Ton 2550 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-51368
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 7

Inspection history · 74

13 February 2026 Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8310380
13 January 2026 Damage Survey · Examination of Repairs
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8297029
24 October 2025 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8258193
22 October 2024 COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8023045
25 September 2024 Internal Structural Exam · Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8009058
8 November 2023 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7822665
2 November 2023 Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7819538
9 June 2023 Bulk Liquid Transfer Monitor
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7710894
23 February 2023 Damage Survey
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7640624
23 February 2023 Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7641676
22 September 2022 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7564704
7 August 2022 Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7527117
23 February 2022 Deficiency Check · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7401577
16 February 2022 Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7409481
7 October 2021 Periodic Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7327721
4 January 2021 Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7119514
24 November 2020 Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7101420
12 February 2020 Examination of Repairs
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6907894
12 November 2019 Deficiency Check · Cargo Tank Internal · COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6831434
15 August 2019 Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6788085
25 October 2018 Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6567448
20 October 2017 Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6290281
21 October 2016 Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6027239
15 October 2015 Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5757937
21 November 2014 Internal Structural Exam · Cargo Tank Internal · Deficiency Check · Hull Examination · COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4930593
20 November 2013 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4751135
2 November 2012 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4466352
11 October 2011 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4160655
16 September 2011 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4149146
15 August 2011 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4116475
1 October 2010 Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3858145
16 February 2010 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3680695
21 August 2009 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3575482
10 July 2009 Damage Survey
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3548814
9 July 2009 Type not recorded
No type recorded · Commandant (CG-CVC) · Activity 3529039
9 July 2009 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3530351
9 December 2008 Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3374779
13 December 2007 Periodic Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2944807
23 November 2007 Damage Survey
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3103058
21 November 2007 Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3104388
21 November 2006 Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2603242
9 November 2005 MTSA Verification · Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2501283
2 January 2005 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2270003
1 November 2004 Cargo Tank Internal · COI Inspection · Hull Examination · Internal Structural Exam · Construction Oversight · Examination of Repairs · MTSA Verification
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1937640
21 October 2004 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2225457
25 September 2003 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1958394
13 January 2000 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 814925
30 December 1999 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 812224
19 January 1999 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1031751
6 January 1998 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 784856
18 February 1997 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1100048
8 January 1996 Hull Examination · COI Inspection · Examination of Repairs
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1434337
29 November 1994 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1385348
10 December 1993 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1466336
22 December 1992 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 827608
22 December 1992 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1441981
18 December 1991 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1268098
3 January 1991 COI Inspection · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1215530
30 April 1990 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 524397
25 April 1990 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 916868
12 October 1989 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 445679
8 March 1989 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 889609
26 September 1988 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 478513
16 March 1988 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1276723
14 January 1988 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 530932
28 October 1987 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1326415
4 September 1987 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 460513
25 June 1987 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 482388
13 March 1987 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1012326
26 November 1986 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 483252
28 July 1986 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 534892
21 March 1986 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 996096
28 February 1986 Re-Inspection · Credit Drydock
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1301472
12 March 1985 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 980472

Deficiency record · 35

02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 26 September 2024 Resolved
46 CFR 31.10-21(C) - IF, DURING AN INTERNAL STRUCTURAL EXAMINATION... DAMAGE OR DETERIORATION TO THE HULL PLATING OR STRUCTURAL MEMBERS... IS DISCOVERED, THE OCMI MAY REQUIRE THE VESSEL TO... EFFECT PERMANENT REPAIRS. DURING ISE, THE FOLLOWING WAS FOUND IN NO. 4S VOID: EXISTING VERTICAL SIDE SHELL WELD SEAM JUST BELOW THE UPPER MOST SIDE SHELL LONGITUDINAL AND JUST AFT OF BULKHEAD 18 IS FRACTURED. REPAIR TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 October 2024
Resolved 21 October 2024
Resolution: Repairs were completed and found satisfactory by the attending Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 26 September 2024 Resolved
46 CFR 31.10-21(C) - IF, DURING AN INTERNAL STRUCTURAL EXAMINATION... DAMAGE OR DETERIORATION TO THE HULL PLATING OR STRUCTURAL MEMBERS... IS DISCOVERED, THE OCMI MAY REQUIRE THE VESSEL TO... EFFECT PERMANENT REPAIRS. DURING ISE, THE FOLLOWING WAS FOUND IN NO. 1S VOID: FRAME 5 WEB ATTACHMENT TO THE LOWEST SIDE SHELL LONGITUDINAL FLANGE, AND THE LADDER POCKET WELD ATTACHMENT TO THE 2ND SIDE SHELL LONGITUDINAL FLANGE UP FROM THE BOTTOM ARE FRACTURED. REPAIR TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2024
Resolved 21 October 2024
Resolution: Repairs were completed and found satisfactory by the attending Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 26 September 2024 Resolved
46 CFR 31.10-21(C) - IF, DURING AN INTERNAL STRUCTURAL EXAMINATION... DAMAGE OR 46 CFR 31.10-21(C) - DETERIORATION TO THE HULL PLATING OR STRUCTURAL MEMBERS... IS DISCOVERED, THE OCMI MAY REQUIRE THE VESSEL TO... EFFECT PERMANENT REPAIRS. DURING ISE, THE FOLLOWING WAS FOUND IN NO. 5S VOID: FRAME 28, 29, 31 AND 32 WEB ATTACHMENTS TO THE LOWEST SIDE SHELL LONGITUDINAL FLANGE ARE FRACTURED. REPAIR TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2024
Resolved 21 October 2024
Resolution: Repairs were completed and found satisfactory by the attending Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 26 September 2024 Resolved
46 CFR 31.10-21(C) - IF, DURING AN INTERNAL STRUCTURAL EXAMINATION... DAMAGE OR DETERIORATION TO THE HULL PLATING OR STRUCTURAL MEMBERS... IS 46 CFR 31.10-21(C) - DISCOVERED, THE OCMI MAY REQUIRE THE VESSEL TO... EFFECT PERMANENT REPAIRS. DURING ISE, THE FOLLOWING WAS FOUND IN THE BOW RAKE: SLAG AND MISSING WELDS WERE FOUND ON FRAME 2 WELD ATTACHMENT TO THE PORT TURN OF BILGE, AND FRAME 1 WEB IS BUCKLED AND FRACTURED NEAR THE STARBOARD SIDE SHELL. REPAIR TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2024
Resolved 21 October 2024
Resolution: Repairs were completed and found satisfactory by the attending Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 November 2023 Resolved
Scantlings, material and workmanship...shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized class society. During required annual survey of bow and stern rake it was discovered that port side insert with 2 side shell longitudinal support beams had never been welded. Vessel is to grind and weld. Furthermore, lower side longitudinal support support beam on stbd side had fractured. Also found a crack in the headlog support frame. Vessel is to make proper repairs prior to departure to the satisfaction of the MI. 1. Bow rake port side frame 1-2/3, missing weld on side shell upper angle. Clean up and weld. 2. Bow rake port side frame 1-2/3, missing weld on side shell lower angle. Clean up and weld. 3. Bow rake stbd side frame 2-1/3, crack in side shell angle support. Crop at least 12” in all directions and renew in kind. 4. Bow rake stbd side head log inboard of push knee, crack in steel supports. Crop at least 12” in all directions and renew in kind.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2023
Resolution: All repairs were verified by MI's, all sat.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 November 2023 Resolved
Found the following broken/cracked welds throughout the bow and stern rakes. Company to repair to the satisfaction of the MI. 5. Bow rake port side frame 2, bottom angle attachment to transverse support cracked weld fwd and aft side of transverse. Scarf and re-weld. 6. Bow rake port side frame 1, bottom angle attachment to transverse support cracked weld outboard fwd and aft side of transverse. Scarf and re-weld. 7. Bow rake port side frame 1, bottom angle attachment to transverse support cracked weld inboard fwd and aft side of transverse. Scarf and re-weld. 8. Bow rake port side frame 1, overhead angle attachment to transverse support cracked weld #1. Scarf and re-weld. 9. Bow rake port side frame 1, overhead angle attachment to transverse support cracked weld #2 Scarf and re-weld. 10. Bow rake port side frame 1, overhead angle attachment to transverse support cracked weld #3 Scarf and re-weld. 11. Bow rake port side frame 1, overhead angle attachment to transverse support cracked weld #4. Scarf and re-weld. 12. Bow rake port side frame 2, where lower corner of machinery space meets transverse support, bottom angle needs rewelded. Scarf and re-weld. 13. Stern rake stbd side frame 36, overhead angle attachment to transverse support cracked weld. Scarf and re-weld. 14. Stern rake port side frame 35, overhead angle attachment to transverse support cracked weld. Scarf and re-weld.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 November 2023
Resolved 8 November 2023
Resolution: All cracked welds were repaired and verified by MI's, all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 November 2023 Resolved
Found a wire hanging loose and running without being supported. 15. Stern rake port side, wire run in need of clamps. Either install double wire clamps or weld extra clamps. 46 CFR 31.35-1 46 CFR 111.60-5 IEEE 45.8-2016 Section 6.8
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 November 2023
Resolved 8 November 2023
Resolution: Verified new wire hanger installation. New clamps are for 2 cables and provide proper support. All sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 23 February 2023 Resolved
All tank vessels, the construction or conversion of which is started on or after July 1, 1951, shall conform to the requirements in this subpart in construction of hulls. T/B NEW DAWN sustained damage to aft port quarter during allision. Vessel is not permitted to carry cargo until damage assessment and repairs are conducted. Vessel is permitted to transit back to Vancouver with no cargo onboard. Repairs must be completed to the satisfaction of the attending Marine Inspector prior to returning to service.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 March 2023
Resolved 27 February 2023
Resolution: Repairs were completed and witnessed by MI. All sat/
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 24 February 2022 Resolved
When Minor repairs of tank vessels become necessary such work shall be under the direction of the OCMI. Received verbal report that a fracture was discovered through the hull of the fore peak tank of the vessel 17FEB2022. Company made temporary repairs without notification to the OCMI. Vessel is to make proper permanent repairs to the satisfaction of OCMI prior to cargo operations.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 February 2022
Resolved 11 March 2022
Resolution: Completed final weld inspection and air test of final repairs. ALL Sat.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 12 November 2019 Resolved
Provide repair proposal for #5 Starboard Void: Broken welds in overhead deck stiffener FWD and AFT of frame 28.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2019
Resolved 2 December 2019
Resolution: Re-welded and witnessed by CG on Dec 2, 2019
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 12 November 2019 Resolved
Provide repair proposal for #1 starboard void: Noted seven fractured Bottom longs between frames four and five as well as four fractured bottom long welds at frame four and one broken weld in the overhead deck stiffener.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2019
Resolved 2 December 2019
Resolution: Re-welded and witnessed by CG on Dec 2, 2019.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 12 November 2019 Resolved
Provide a repair proposal for the number one port void: Noted three fractured bottom long welds at frame number four.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2019
Resolved 2 December 2019
Resolution: Re-welded and witnessed by CG on Dec 2, 2019
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 12 November 2019 Resolved
Provide a repair proposal for the stern rake: The corner joint weld on the starboard side shell and main deck was affected by undercut.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2019
Resolved 2 December 2019
Resolution: Re-welded and witnessed by CG on Dec 2, 2019
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 12 November 2019 Resolved
Provide a repair proposal for the number two cargo tank: one missed weld identified on the tank top outboard longitudinal stiffener connection to the aft bulkhead.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 16 December 2019
Resolved 2 December 2019
Resolution: Re-welded and witnessed by CG on Dec 2, 2019.
Construction/Loadline › Hull › Hull Plating
Issued 18 November 2014 Resolved
Crop and renew the 04 sections of bilge roll (03 sections along vessel port side and 01 section along the vessel starboard side) that were identified by the gauging report to show significant signs of degradation in excess of 25%. [Approx. size of inserts: 48" by 55", 48" by 36", 48" by 60" and 12"by 24".]
Action required: 705 - Other - as specified
Resolved 21 November 2014
Resolution: Attending MI verified satisfactory repairs to the 04 section identified.
Construction/Loadline › Hull › Side Shell
Issued 3 November 2014 Resolved
Crop and renew the steel along the port side of the forward rake (est. size of the insert is 4' by 4').
Action required: 705 - Other - as specified
Resolved 14 November 2014
Resolution: Attending CG MI verified satisfactory completion of insert and conducted a satisfactory final fit-up inspection of insert with the tank pressed up to 1.5 psi.
Construction/Loadline › Hull › Side Shell
Issued 27 October 2014 Resolved
Crop and renew the steel along the starboard side of the aft rake along the bilge knuckle (est. size of insert is 4' by 6').
Action required: 705 - Other - as specified
Resolved 31 October 2014
Resolution: Attending CG MI verified satisfactory completion of insert and conducted a satisfactory final fit-up inspection of insert with the tank pressed up to 1.5 psi.
Construction/Loadline › Hull › Bottom Plating
Issued 27 October 2014 Resolved
Crop and renew the steel along the bottom shell and bilge knuckle on the starboard side of the forward rake. (est. size of insert in 5' by 8').
Action required: 705 - Other - as specified
Resolved 14 November 2014
Resolution: Attending CG MI verified satisfactory completion of insert and conducted a satisfactory final fit-up inspection of insert with the tank pressed up to 1.5 psi.
Construction/Loadline
Issued 8 January 1996 Resolved
Make permanent repairs to bow rake transverse collision bulkhead as marked and detailed in CG worklist dtd 05 Jan 96._x001C_
Condition: Unknown
Due 12 February 1996
Resolved 12 February 1996
Documentation
Issued 8 January 1996 Resolved
Provide current Certificate of Documentation_x001C_
Condition: Unknown
Due 8 July 1996
Resolved 12 February 1996
Construction/Loadline
Issued 8 January 1996 Resolved
V/weld in stbd rub rail, and framing of bow and stern rake, #1 P&S, #2 P&S,#3 P&S, and #4 P&S, as marked and detailed in CG worklist dtd 05 Jan 96. _x001C_
Condition: Unknown
Due 8 January 1996
Resolved 12 February 1996
Construction/Loadline
Issued 8 January 1996 Resolved
Make permanent repairs to 15 feet of chine at the turn of the bilge of tank#2S and detailed in CG worklist dtd 05 Jan 96._x001C_
Condition: Unknown
Due 8 January 1996
Resolved 12 February 1996
Construction/Loadline
Issued 8 January 1996 Resolved
Make permanent repairs to 3 feet of chine at the turn of the bilge of tank #3S as marked and detailed in CG worklist dtd 05 Jan 96._x001C_
Condition: Unknown
Due 8 January 1996
Resolved 12 February 1996
Navigation
Issued 8 January 1996 Resolved
Prove proper operation of navigation lights_x001C_
Condition: Unknown
Due 8 January 1996
Resolved 12 February 1996
Construction/Loadline
Issued 8 January 1996 Resolved
Make permanent repairs to tank #1S as marked and detailed in CG worklist dtd 05 Jan 96._x001C_
Condition: Unknown
Due 8 January 1996
Resolved 12 February 1996
Deck/Cargo
Issued 8 January 1996 Resolved
Permanently install piping blanks in cargo line._x001C_
Condition: Unknown
Due 8 January 1996
Resolved 12 February 1996
Deck/Cargo
Issued 13 March 1987 Resolved
SET RELIEF VALVE FOR THE HYDRAULIC STARTING ACCUMULATOR SYSTEM BELOW THE MAXIMUM ALLOWABLE WORKING PRESSURE OF THE SYSTEM (3000 PSI)
Condition: Unknown
Due 13 March 1987
Resolved 13 March 1987
Deck/Cargo
Issued 28 February 1986 Resolved
TEST CARGO PIPING TO 1.5 TIMES MAXIMUM ALLOWABLE WORKING PRESSURE.
Condition: Unknown
Due 28 February 1986
Resolved 28 February 1986
Deck/Cargo
Issued 28 February 1986 Resolved
RESET RELIEF DEVICE FOR HYDRAULIC ACCUMULATORS TO WITHIN THEIR MAXIMUM ALLOWABLE WORKING PRESSURE.
Condition: Unknown
Due 28 February 1986
Resolved 28 February 1986
Navigation
Issued 12 March 1985 Resolved
PROVIDE NEW SWITCH FOR PORT RUNNING LIGHT
Condition: Unknown
Due 12 March 1985
Resolved 12 March 1985
Documentation
Issued 12 March 1985 Resolved
AMEND OIL TRANSFER PROCEDURES TO INCLUDE THAT FIRE EXTINGUISHER BOX SHOULD BE OPENED DURING OIL TRANSFERS AND OPERATION OF MACHINERY AND THAT TANKERMAN WILL PROVIDE PORTABLE RED LIGHT DURING CARGO OPERATIONS AT NIGHT.
Condition: Unknown
Due 12 March 1985
Resolved 12 March 1985
Electrical
Issued 12 March 1985 Resolved
PROVIDE COVER FOR SHORE CONNECTION
Condition: Unknown
Due 12 March 1985
Resolved 12 March 1985
Construction/Loadline
Issued 12 March 1985 Resolved
SUBJECT NO. 1 STARBOARD CARGO TANK TO A HEAD PRESSURE TO PROVE SOUNDNESS OFBULKHEAD UPON FILLING OF TANK NOTIFY MSO OFFICE FOR INSPECTION.
Condition: Unknown
Due 12 March 1985
Resolved 12 March 1985
Deck/Cargo
Issued 12 March 1985 Resolved
TEST RELIEF VALVE AND CARGO PIPING AND CALIBRATE PRESSURE GAUGE IN ACCORDANCE WITH 33 CFR 156.170(C)(2)(3)(4).
Condition: Unknown
Due 12 March 1985
Resolved 12 March 1985
Construction/Loadline
Issued 12 March 1985 Resolved
RENEW STARBOARD BRACKET AT TURN OF BILGE IN FORWARD RAKE, SECOND BRACKET FROM BULKHEAD.
Condition: Unknown
Due 12 March 1985
Resolved 12 March 1985

Source. US Coast Guard records through 23 August 2026, retrieved 5 September 2026. Vessels the Coast Guard classes as Barge or Towing Vessel. Coverage and known gaps.

Maury does not score, rate, or grade vessels. What Maury does not do · Glossary · Correct a record.