Records from 1980 to 2009. Most recent: casualty investigation, 20 November 2009.
Inspection history · 74
17 June 2008
Type not recorded
No type recorded · Activities Europe · Activity 3239359
23 October 2007
Deficiency Check · COI Inspection
Physical examination · Activities Europe · Activity 3080753
1 January 2007
Deficiency Check · Examination of Repairs · In-Service Inspection
Physical examination · Activities Europe · Activity 2852592
18 October 2006
Examination of Repairs · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2803428
10 September 2006
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2809322
17 August 2006
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2747503
7 July 2005
COI Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2415881
11 February 2005
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2290928
18 November 2004
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2243770
3 August 2004
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2155159
6 July 2004
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2061884
25 May 2004
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2044065
1 December 2003
Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1971121
21 July 2003
Periodic Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1848011
19 May 2003
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1845930
6 January 2003
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1726655
11 November 2002
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1710506
8 July 2002
Deficiency Check · Hull Examination · Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1643106
5 October 2001
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 144344
21 September 2001
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1423653
25 August 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1073131
14 August 2001
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1069997
24 April 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 148714
13 July 2000
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1051921
10 July 2000
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1462868
3 April 2000
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1047564
28 February 2000
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1046471
27 January 2000
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 157739
4 June 1999
Hull Examination · Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1433511
5 March 1999
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 782746
21 October 1998
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 802405
14 July 1998
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1431988
21 August 1997
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 786403
24 July 1997
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1406157
4 April 1997
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1091324
30 January 1997
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1101577
14 September 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1359313
12 August 1996
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1087235
26 July 1996
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1377784
5 July 1996
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1088598
2 June 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 177782
6 September 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1442296
7 December 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 67355
19 August 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 165855
28 July 1994
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1424005
29 October 1993
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1144827
23 September 1993
Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1152583
1 September 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 827188
19 August 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 844084
10 September 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 957341
29 July 1992
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1251144
10 April 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1264864
2 March 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 84277
15 January 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 957150
8 August 1991
Hull Examination · Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 946737
10 May 1991
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 910037
9 May 1991
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1236011
9 May 1991
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1237885
3 August 1990
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 906991
13 July 1989
Re-Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1045165
13 August 1988
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1035705
11 August 1988
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1036432
9 August 1988
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1036118
29 January 1988
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1014945
3 August 1987
Re-Inspection · Deficiency Check · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1314089
15 April 1987
Drydock Extension
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1002564
12 August 1986
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1293030
25 August 1985
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 986881
25 April 1985
Credit Drydock
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 992547
27 August 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1282786
25 August 1983
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 964266
17 April 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 970366
31 August 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1274007
6 October 1980
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1276571
Fire Fighting › Fixed Halon Fire Extinguishing System › Control Valve
Issued 23 October 2007
Resolved
Place at least one semi-portable CO2 unit in the engine room until the Halon system is brought back to full capability.
Due 31 January 2008
Resolved 15 March 2008
Construction/Loadline › Structures › Transverse Bulkhead
Issued 23 October 2007
Resolved
Supply proof of the stateroom105 outboard wall being shifted 4” to the Starboard and the draft stops above the storage space reference in paragraph 6 of the Rowan 20 September 2007 letter being completed.
Condition: Improper Installation
Due 31 January 2008
Resolved 15 March 2008
Operations/Management › Vessel Safety Management › Company Responsibilities/Authority
Issued 31 October 2006
Resolved
Obtain USCG approval of all plans depicting retrofits/alterations affecting the hull, machinery, and equipment that occurred at Signal Shipyard, Pascagoula, MS, and those that are ongoing at the time of departure.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 23 October 2007
Resolution: Cleared
Construction/Loadline › Structures › Superstructure
Issued 31 October 2006
Resolved
After all plans are approved for alterations/retrofits, arrange for USCG inspection of systems to include, but not limited to structural fire protection, fire detection, lifesaving arrangements per approved fire & safety plan, GA/PA systems, fixed fire suppression system in egen enclosure, primary & e-power arrangements, electrical installations in hazardous locations, helideck foam system, etc.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 23 October 2007
Resolution: Cleared
Construction/Loadline › Hull › Hull Plating
Issued 31 October 2006
Resolved
For drydock credit, obtain USCG approval for hull structure modifications IWO former thruster tubes. Provide copies of approved plans.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 11 December 2006
Resolution: Via email from [name withheld] of Rowan, received copies of ABS approved drawings and ABS letter dated 11/16/06 for structural modifications.
Construction/Loadline › Hull › Bracket
Issued 31 October 2006
Resolved
For drydock credit - provide NDT reports for leg to spud can connections on starboard leg. Provide final NDT reports for structural inserts IWO former thruster tubes.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 21 November 2006
Resolution: Received email of 11/21/06 with Southern Inspection Services reports D-01 through D-07.
Construction/Loadline › Penetrations › Valve Flange
Issued 31 October 2006
Resolved
Renew dump valve for #11 preload tank
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 21 November 2006
Resolution: Received email with photographs of new valve and OIM statement attesting to renewal of valve.
Electrical › Electric Supply System (service) › Cable
Issued 17 August 2006
Resolved
Prove drillers console and drillers console strokemeter have audible or visual alarm upon loss of purged air.
Condition: Unknown
Due 17 September 2006
Resolved 10 September 2006
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 17 August 2006
Resolved
Prove proper operation of fog signal.
Condition: Unknown
Due 17 September 2006
Resolved 17 January 2007
Resolution: Tested sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 July 2005
Resolved
Prove alarm on purged drill floor camera and drillers console.
Due 7 August 2005
Resolved 28 July 2005
Engineering › Pressure Vessel › Shell Plate
Issued 6 July 2004
Resolved
Complete internal inspection of all pressure vessels listed on COI.
Due 6 August 2004
Resolved 30 July 2004
Resolution: Rowan Companies contracted Premier Worldwide, Inc to inspect and gauge all Rowan Paris''s pressure vessels. Rowan submitted gauging reports to PATMS. Reports were reviewed and found to be satisfactory.
Construction/Loadline › Hull › Weld
Issued 25 May 2004
Resolved
Complete phase two of SEILOD prior to next movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2004
Resolution: Phase II of SEILOD complete. Magnetic particle and ultrasonic measurement report with ABS report received by PATMS.
Fire Fighting › Fire Main
Issued 10 July 2002
Resolved
Crop and renew fire main at port pressure tank room, where wasted. LEGACY COMPONENT DESC: Condition
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 August 2002
Resolved 9 August 2002
Construction/Loadline › Structures
Issued 10 July 2002
Resolved
At junction of main deck and house bulkhead insert where holed and doubler plated. Minimum 18 inch by 18 inch back to good steel. LEGACY COMPONENT DESC: Superstructure
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 August 2002
Resolved 9 August 2002
Documentation › Certificates/Documents
Issued 10 July 2002
Resolved
Provide annual survey for all cranes from class society.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 August 2002
Resolved 9 August 2002
Deck/Cargo
Issued 10 July 2000
Resolved
CONDUCT ANNUAL CRANE SURVEY BY CLASS SOCIETY AND SUBMIT REPORT TO [name withheld] OF ALL PRESSURE RELIEF VALVES, SUBMIT REPORT TO [name withheld].
Condition: Unknown
Due 10 July 2000
Resolved 10 July 2000
Lifesaving
Issued 10 July 2000
Resolved
RENEW LANYARDS ON LIGHTS TO RINGBUOYS AS NOTED DURING INSPECTION. REPLACE WORN, WASTED OR DISCOLORED RING BUOYS AS NOTED DURING INSP.
Condition: Unknown
Due 25 July 2000
Resolved 25 July 2000
Documentation
Issued 10 July 2000
Resolved
AMEND RIG TRAINING PROCEDURES TO CONFORM WITH 46CFR109.213. INCLUDE EQUIPMENT TEST AND 3RD PARTY INDUSTRIAL PERSONNEL INVOLVEMENT.
Condition: Unknown
Due 12 July 2000
Resolved 12 July 2000
Lifesaving
Issued 10 July 2000
Resolved
PROVIDE 7 PARACHUTE FLARES FOR RIG USE.
Condition: Unknown
Due 25 July 2000
Resolved 25 July 2000
Construction/Loadline
Issued 10 July 2000
Resolved
MAKE REPAIRS TO DRILL WATER TANK #6 BOTTOM PLATING IN WAY OF DOUBLER,_x001C_ REPAIR HOLE BEFORE LEAVING PRESENT LOCATION. SUBMIT REPAIR PROPOSAL TO OCMIMORGAN CITY AND REPAIR TO SATISFACTION OF COAST GUARD OR CLASS SOCITY.
Condition: Unknown
Due 10 July 2000
Resolved 10 July 2000
Construction/Loadline
Issued 4 June 1999
Resolved
REPAIR/REPLACE DUMP VALVES NR7 AND NR9.
Condition: Unknown
Due 20 July 1999
Resolved 20 July 1999
Construction/Loadline
Issued 4 June 1999
Resolved
RECROP/RENEW WASTED LONG. IN NUMBER 4 VOID AT LADDER.
Condition: Unknown
Due 20 July 1999
Resolved 20 July 1999
Construction/Loadline
Issued 4 June 1999
Resolved
CROP AND RENEW UNDER DECK LONGS IN VOIDS 5 AND 8
Condition: Unknown
Due 20 July 1999
Resolved 20 July 1999
Construction/Loadline
Issued 4 June 1999
Resolved
RENEW VARIOUS STUDS FOR VOID SPACE MAN WAYS.
Condition: Unknown
Due 20 July 1999
Resolved 20 July 1999
Construction/Loadline
Issued 4 June 1999
Resolved
IN WAY OF MUD PUMPS IN VOID NR7 AND NR 8 COMPLETE WELDING OF INSERTS.
Condition: Unknown
Due 20 July 1999
Resolved 20 July 1999
Construction/Loadline
Issued 4 June 1999
Resolved
REPLACE BOLTS FOR HIGH PRESSURE MUD LINE BRACKETS IN PREDRILL TANK 10.
Condition: Unknown
Due 20 July 1999
Resolved 20 July 1999
Lifesaving
Issued 4 June 1999
Resolved
PROVIDE MACHINERY GUARD FOR COLD START A/C ON EXPOSED ROTATING PART.
Condition: Unknown
Due 20 July 1999
Resolved 20 July 1999
Accommodation/Occupational Safety
Issued 4 June 1999
Resolved
RECROP/RENEW HANDRAIL ON STBD SIDE UNDER DRILL FLOOR.
Condition: Unknown
Due 20 July 1999
Resolved 20 July 1999
Lifesaving
Issued 14 July 1998
Resolved
SUPPLY PROOF THAT THE LIFERAFT RELEASE GEAR HAS BEEN WEIGHT TESTED.
Condition: Unknown
Due 21 October 1998
Resolved 21 October 1998
Lifesaving
Issued 14 July 1998
Resolved
SUPPLY PROOF THAT THE AIR BOTTLES IN THE STARBOARD LIFEBOAT HAVE BENN HYDROED.
Condition: Unknown
Due 21 October 1998
Resolved 21 October 1998
Fire Fighting
Issued 14 July 1998
Resolved
SUPPLY PROOF THAT THE NITROGEN BOTTLES ON THE FIXED HALON SYSTEM FOR THE PORT AND STARBOARD BUNK TANK ROOMS HAVE BEEN HYDROED.
Condition: Unknown
Due 21 October 1998
Resolved 21 October 1998
Fire Fighting
Issued 21 August 1997
Resolved
CROP AND RENEW ALL WASTED FIREMAIN PIPING ON STBD SIDE LOWER DECK.
Condition: Unknown
Due 4 September 1997
Resolved 4 September 1997
Electrical
Issued 24 July 1997
Resolved
CONDUCT SEMI-ANNUAL EMERGENCY BATTERY LOAD TEST (2 HOUR) IN ACCORDANCE WITH46CFR109.211.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Lifesaving
Issued 24 July 1997
Resolved
REDUCE TOTAL NUMBER OF PERSONS ALLOWED ON BOARD RIG FROM 78 TO 76 UNTIL ALLPRIMARY LIFE SAVING EQUIPMENT IS PLACED BACK ON BOARD.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Unknown
Issued 24 July 1997
Resolved
CROP AND RENEW WASTED DECK FRAMING ABOVE SHAKERS.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Unknown
Issued 24 July 1997
Resolved
MAKE MUD PIT DOORS SELF CLOSING AND GAS TIGHT.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Unknown
Issued 24 July 1997
Resolved
REVISE POLICY TO COMPLY WITH THE APPLICABLE PORTIONS OF THE REVISIONS TO 46CFR107-109. REFERENCE FEDERAL REGISTER VOL. 61, NO 98, DATED MAY 20, 1996.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Fire Fighting
Issued 24 July 1997
Resolved
PROVIDE 2 OPERATIONAL O2, LEL METERS ON BOARD.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Unknown
Issued 24 July 1997
Resolved
MAKE ENGINE ROOM PRESSURE VESSELS (2) AVAILABLE FOR INTERNAL EXAM BY ATTENDING CG INSPECTOR OR ABS SURVEYOR. TEST SAFETY RELIEF VALVES OF THE SAME.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Unknown
Issued 24 July 1997
Resolved
INSTALL 100 PSI SAFETY RELIEF VALVE ON HOT WATER HEATER.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Engineering
Issued 24 July 1997
Resolved
REPAIR HIGH WATER TEMPERATURE SHUT OFF ON #4 MAIN GENERATOR.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Electrical
Issued 24 July 1997
Resolved
CONDUCT AND LOG MONTHLY EMERGENCY GENERATOR LOAD TEST (2 HOUR) IN ACCORDANCE WITH 46CFR109.211.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Unknown
Issued 24 July 1997
Resolved
CONDUCT SATISFACTORY TEST OF EMERGENCY TOTAL RIG SHUT DOWN.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Lifesaving
Issued 30 January 1997
Resolved
REPLACE LIFERAFT DAVIT FALLS AND CONDUCT WEIGHT TEST IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 30 January 1997
Resolved 30 January 1997
Construction/Loadline
Issued 14 September 1996
Resolved
Crop and renew master mud pit dump valve spool piece._x001C_
Condition: Unknown
Due 14 September 1996
Resolved 14 September 1996
Documentation
Issued 14 September 1996
Resolved
Provide copy of NDT and ABS report of leg to can inspection.
Condition: Unknown
Due 17 January 1997
Resolved 17 January 1997
Accommodation/Occupational Safety
Issued 14 September 1996
Resolved
Repair/replace air receiver under drill floor.
Condition: Unknown
Due 14 September 1996
Resolved 14 September 1996
Construction/Loadline
Issued 14 September 1996
Resolved
Crop and renew wasted under deck stiffners in drill water tank 1A.
Condition: Unknown
Due 14 September 1996
Resolved 14 September 1996
Construction/Loadline
Issued 14 September 1996
Resolved
Repair/replace wasted reach rods in drill water 1A that serve bilge and dump valves.
Condition: Unknown
Due 14 September 1996
Resolved 14 September 1996
Construction/Loadline
Issued 26 July 1996
Resolved
OPEN AND CERTIFY SAFE FOR WORKERS, AND DRAIN ANY WATER, FROM THE FOLLOWING TANKS/VOIDS: 1) PRELOAD TANKS 1A AND 1B. 2) VOIDS 7 AND 8._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 July 1996
Resolved 26 July 1996
Accommodation/Occupational Safety
Issued 26 July 1996
Resolved
INTERNAL EXAMINATION OF ALL PRESSURE VESSELS AND TEST OF PRESSURE RELIEF VALVES TO BE COMPLETED AT RIG MOVE.
Condition: Unknown
Due 26 July 1996
Resolved 26 July 1996
Lifesaving
Issued 26 July 1996
Resolved
PROVIDE 2 ADDITIONAL 25 PERSON LIFERAFTS IN SERVICE DATE. MAX PERSONS ALLOWED ON RIG SHALL BE 64 UNTIL LIFERAFTS ARE INSTALLED.
Condition: Unknown
Due 14 August 1996
Resolved 14 August 1996
Construction/Loadline
Issued 26 July 1996
Resolved
CONDUCT PHASE II SEILODD IN ACCORDANCE WITH APPROVED PROCEDURES DURING NEXTRIG MOVE.
Condition: Unknown
Due 26 July 1996
Resolved 26 July 1996
Lifesaving
Issued 26 July 1996
Resolved
DEMONSTRATE EMERGENCY DRILLING OPERATIONS SHUTDOWN PROCEDURE AT TIME OF RIGMOVE.
Condition: Unknown
Due 26 July 1996
Resolved 26 July 1996
Construction/Loadline
Issued 26 July 1996
Resolved
OPEN MASTER MUD PIT DUMP VALVE FOR INSPECTION.
Condition: Unknown
Due 26 July 1996
Resolved 26 July 1996
Accommodation/Occupational Safety
Issued 26 July 1996
Resolved
REPAIR LEAK IN S/W LINE WHERE PIPE PENETRATES BULKHEAD IN HEAVY EQUIP. ROOM.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
Construction/Loadline
Issued 26 July 1996
Resolved
PRELOAD TANK 10: 1) RENEW WASTED HATCH COVER COAMING; 2) CLEAN DEBRIS OUT OF LOW (BILGE SUCTION) END OF TANK 3) ARREST CORROSION PER ENCLOSED DRAWING._x001C_ _x001C_
Condition: Unknown
Due 14 August 1996
Resolved 14 August 1996
Construction/Loadline
Issued 26 July 1996
Resolved
PRELOAD TANK 12: 1) REPLACE MISSING SECTION OF HATCH GASKET; 2) REWORK STUCK CHECK VALVE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 August 1996
Resolved 14 August 1996
Electrical
Issued 26 July 1996
Resolved
INSTALL STRAPS (METAL, 2 FT. INTERVALS) ON LOOSE WIRE RUNS IN SHAKER HOUSE.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
Construction/Loadline
Issued 26 July 1996
Resolved
FREE UP AND LUBRICATE ALL PRE-LOAD DUMP CHECK VALVES AND REPLACE THE CHECK VALVES THAT CANNOT BE FREED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 July 1996
Resolved 26 July 1996
Lifesaving
Issued 26 July 1996
Resolved
CONDUCT AND LOG FOLLOWING MAINTENANCE: 1) E-GEN MONTHLY LOAD AND WEEKLY TESTS. 2) E-BATT 2 HR. LOAD TEST. 3) WEEKLY BOAT LOWERED AND ENG. RUN. 4) QTRLY WINCH INSP. 5) QTRLY OPERATE L/B IN WATER.
Condition: Unknown
Due 26 July 1996
Resolved 26 July 1996
Lifesaving
Issued 28 July 1994
Resolved
REPAIR GENERAL ALARM LIGHTS IN MUD PUMP ROOM AND MUD PIT ROOM.
Condition: Unknown
Due 12 August 1994
Resolved 15 August 1994
Construction/Loadline
Issued 28 July 1994
Resolved
MAKE MUD PIT DOORS SELF CLOSING AND GAS TIGHT.
Condition: Unknown
Due 12 August 1994
Resolved 15 August 1994
Lifesaving
Issued 28 July 1994
Resolved
PERFORM HYDROTEST OF BREATHING AIR BOTTLES FOR SCBA'S ACCOMPANYING FIREMANSOUTFITS.
Condition: Unknown
Due 12 August 1994
Resolved 15 August 1994
Electrical
Issued 28 July 1994
Resolved
INSTALL EXPLOSION PROOF EMERGENCY LIGHT IN MUD PIT ROOM AND BATTERY OPERATED EMERGENCY LIGHTS IN HOSPITAL SPACE, CORRIDOR OUTSIDE MESS #2, AND CHANGE ROOM.
Condition: Unknown
Due 12 August 1994
Resolved 15 August 1994
Electrical
Issued 23 September 1993
Resolved
CHECK "EXIT" LIGHTS TO INSURE THAT TEY ARE ON THE EMERGENCY DISTRIBUTION PANEL.
Condition: Unknown
Due 7 October 1993
Resolved 29 October 1993
Deck/Cargo
Issued 23 September 1993
Resolved
PROVIDE HYDRO TEST DATA FOR DIESEL FUEL TRANSFER HOSE.
Condition: Unknown
Due 7 October 1993
Resolved 29 October 1993
Electrical
Issued 23 September 1993
Resolved
REMOVE WIRE NUTS ON EMERGENCY LIGHT OVER FIRE PUMP AND PROVIDE APPROVED TYPE PLUG CONNECTOR.
Condition: Unknown
Due 7 October 1993
Resolved 29 October 1993
Lifesaving
Issued 23 September 1993
Resolved
REPAIR HOLE IN STERN OF LIFE BOAT #2.
Condition: Unknown
Due 7 October 1993
Resolved 29 October 1993
Lifesaving
Issued 23 September 1993
Resolved
INSTALL EYE WASH STATION ON DRILL FLOOR.
Condition: Unknown
Due 7 October 1993
Resolved 29 October 1993
Electrical
Issued 23 September 1993
Resolved
PROVIDE ELECTRICAL MAT OR WOODEN GRATING IN FRONT OF EMERGENCY SWITCH BOARD.
Condition: Unknown
Due 7 October 1993
Resolved 29 October 1993
Lifesaving
Issued 23 September 1993
Resolved
REPLACE SUN DAMAGED LINE ON AT LEAST 02 RING LIFE BOUYS LOCATED ON OPPOSIT SIDES OF VESSEL.
Condition: Unknown
Due 7 October 1993
Resolved 29 October 1993
Lifesaving
Issued 23 September 1993
Resolved
REPAIR INTERIOR LIGHT ON #1 LIFEBOAT.
Condition: Unknown
Due 7 October 1993
Resolved 29 October 1993
Lifesaving
Issued 23 September 1993
Resolved
PROVIDE COVERS FOR BUNK LIGHTS.
Condition: Unknown
Due 7 October 1993
Resolved 29 October 1993
Fire Fighting
Issued 29 July 1992
Resolved
TEST TIME DELAY ON HALON SYSTEM. NOT TESTED DURING HILLER OFFSHORE INSPECTION DUE TO DRILLING OPS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Lifesaving
Issued 29 July 1992
Resolved
REPLACE SHACKLE BETWEEN B.F.GOODRICH "NO-LOAD" HOOK AND FALL FOR DAVIT LAUNCHED LIFERAFT STATIONS P/S WITH PROPERLY RATED SHACKLE.(i.e. 1 1/2 TON SHACKLE REPLACED WITH 2 1/2 TON SHACKLE)
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Lifesaving
Issued 29 July 1992
Resolved
SERVICE TWO (2) DAVIT LAUNCHED LIFERAFTS (ONE ON EACH SIDE). VESSELS TOTAL PERSONS ALLOWED REDUCED TO 64 UNTIL ALL LIFERAFTS SERVICED AND INSTALLED ONBOARD._x001C_ _x001C_
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Electrical
Issued 29 July 1992
Resolved
MAKE THRU DECK CABLEWAY BOX AT SHALE SHAKER EXPLOSION PROOF OR MOVE OUTSIDECLASS I DIV I AREA AS SHOWN ON HAZARDOUS LOCATION PLAN._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Lifesaving
Issued 29 July 1992
Resolved
PROVIDE CERTIFICATE FOR SURVIVAL CAPSULES CABLES OR RENEW CABLES AND WEIGHTTEST.
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Accommodation/Occupational Safety
Issued 29 July 1992
Resolved
INSTALL ASME APPROVED RELIEF VALVES ON AIR RECEIVERS IN ENGINEROOM, DRILL FLOOR AIR RECEIVER, AND POTABLE AND SANITARY WATER TANKS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Lifesaving
Issued 29 July 1992
Resolved
MAKE REPAIRS TO AND PROVE PROPER OPERATION OF SPRINKLER SYSTEM ON #1 SURVIVAL BOAT._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Unknown
Issued 29 July 1992
Resolved
INSTALL PRESSURE GUAGE ON INLET TO DRLLER'S CONSOLE AIR PURGE SYSTEM. SYSTEM TO HAVE NOT MORE THAN 3 PSI INTO CONSOLE AND OTHER SYSTEM FED BY AIRPURGE._x001C_ _x001C_
Condition: Unknown
Due 29 July 1992
Resolved 29 July 1992
Lifesaving
Issued 8 August 1991
Resolved
MAKE AIR RECEIVER UNDER DRILL FLOOR AVAILABLE FOR INSPECTION BY A MARINE INSPECTOR UPON COMPLETION OF PRESENT DRILLING OPERATION. THIS DEFICIENCY SHALL BE CLEARED PRIOR TO DEPARTING [name withheld], TEXAS INSPECITON ZONE.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Accommodation/Occupational Safety
Issued 3 August 1990
Resolved
MAKE THE DRILL FLOOR AIR RECEIVER AND RELIEF VALVE AVAILABLE FOR INTERNAL INSPECTION AND TESTS TO THE COGNIZANT OCMI.
Condition: Unknown
Due 3 August 1990
Resolved 3 August 1990
Electrical
Issued 3 August 1990
Resolved
PROVIDE A TIME DELAY MECHANISM FOR THE POWER CUT-ON SWITCH IN THE PURGED COFFEE MAKER BOX THAT ALLOWS THE BOX TO BE PURGED WITH FOUR COMPLETE CHANGEOF PURGE AIR BEFORE THE POWER TO THE COFFEE MAKER IS TURNED ON. (NFPA 4-96)
Condition: Unknown
Due 3 August 1990
Resolved 3 August 1990
Lifesaving
Issued 9 August 1988
Resolved
PROVIDE ONE BOATHOOK FOR THE PORT 28 MAN LIFEBOAT.
Condition: Unknown
Due 9 August 1988
Resolved 9 August 1988
Lifesaving
Issued 9 August 1988
Resolved
PROVIDE TABLE OF LIFESAVING SIGNALS FOR #1 AND #2 LIFEBOAT.
Condition: Unknown
Due 9 August 1988
Resolved 9 August 1988
Fire Fighting
Issued 9 August 1988
Resolved
REPLACE EX607 HOSE ON 150 LB B-V SEMIPORTABLE EXTINGUISHER LOCATED ON HELO DECK WITH AN APPROVED HOSE.
Condition: Unknown
Due 9 August 1988
Resolved 9 August 1988
Construction/Loadline
Issued 25 August 1985
Resolved
PERFORM ANNUAL HYDROSTATIC TEST OF FUEL OIL TRANSFER HOSE AS PER 33CFR156. 170 (F)(2).
Condition: Unknown
Due 25 August 1985
Resolved 25 August 1985
Lifesaving
Issued 25 August 1985
Resolved
PROVIDE A CLEAT @ EACH LIFERAFT STATION TO THE RAFT OFF.
Condition: Unknown
Due 25 August 1985
Resolved 25 August 1985
Construction/Loadline
Issued 25 August 1985
Resolved
PROVIDE LETTER OF DESIGNATION OF PERSON IN CHARGE OF THE UNIT AS PER 46CFR 109.107.
Condition: Unknown
Due 25 August 1985
Resolved 25 August 1985
Construction/Loadline
Issued 25 August 1985
Resolved
ESTABLISH AND MANTAIN A LOG BOOK AS PER 46CFR 109.431 (B).
Condition: Unknown
Due 25 August 1985
Resolved 25 August 1985
Fire Fighting
Issued 25 August 1985
Resolved
SUBMIT DATA PERTINENT TO NEW INSTALLATION OF AFFF FIXED FIRE FIGHTING SYSTEM FOR MUD PIT TO USCG (MMT) FOR REVIEW.
Condition: Unknown
Due 25 August 1985
Resolved 25 August 1985
Electrical
Issued 25 August 1985
Resolved
SECURE NEWLY INSTALLED CABLES LEADING FROM MAIN SWITCHBOARD AND BREAKER PANEL TO EXISTING RACEWAYS AND SECURE NEWLY INSTALLED CONTROL CABLES LEADING OVER TOP GENERATORS IN RACEWAYS IN ACCORDANCE WITH 46CFR 111.60-5 (A) (1,E)IEEE-45.
Condition: Unknown
Due 25 August 1985
Resolved 25 August 1985
Electrical
Issued 25 August 1985
Resolved
PROVIDE ONE EMERGENCY LIGHT IN PORT PASSAGEWAY ON 3RD DECK LEVEL ACCOMODATION SPACES.
Condition: Unknown
Due 25 August 1985
Resolved 25 August 1985
Electrical
Issued 25 August 1985
Resolved
PROVIDE LOW LUBE OIL TRIP ON EMERGENCY DIESEL AS PER 46CFR 112.50-1(H).
Condition: Unknown
Due 25 August 1985
Resolved 25 August 1985
Construction/Loadline
Issued 25 August 1985
Resolved
SUBMIT DATA PERTIMENT TO INSTALLATION OF NEW DERRAK AND TOP DRIVE UNIT TO USCG(MMT8) TO DETERMINE IF THE STABILITY LETTER AND OPERATIONS MANUAL REQUIRE AMENDMENT.
Condition: Unknown
Due 25 August 1985
Resolved 25 August 1985