Inspection history · 21
30 October 2025
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8241264
14 October 2025
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8251413
5 August 2024
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7971860
6 November 2023
Inclining Experiment
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7821356
19 July 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7746701
13 June 2023
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7713156
23 June 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7484737
6 December 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7598279
10 August 2021
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7283096
28 September 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7066576
22 September 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7062857
2 March 2020
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6914474
17 June 2019
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6714092
31 May 2019
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6699429
18 April 2019
Type not recorded
No type recorded · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 6669638
10 September 2018
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6536709
2 March 2018
Hull Examination · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6364699
16 January 2018
Administrative Inspection · Deficiency Check
Physical examination · Navigation Center · Activity 6338247
7 July 2017
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6201085
7 July 2016
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5932805
4 February 2016
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5809410
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 30 October 2025
Resolved
Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. This letter sets forth conditions of operation. Vessel is not operating IAW their stability letter issued, October 24, 2025. In the letter it states "No.1 Ballast Tank shall be 60% full with saltwater at all times." It was observed empty. Letter additionally states, all other ballast tanks and fresh water tanks shall be empty, they were approximately 70% full. Prior to carrying passengers.
46 CFR 178.210
46 CFR 170.120
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 November 2025
Resolution: Witnessed vessel in compliance with Stability letter and completed Sea Trial.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 October 2025
Resolved
All unfired pressure vessels must be installed to the satisfaction of the cognizant OCMI. The design, construction, and original testing of such unfired pressure vessels must meet the applicable requirements of subchapter F (Marine Engineering) of this chapter. MI observed 02 pressure vessels on board, provide size, max allowable working pressure for each tank and max allowable gauge reading for relief valve.
46 CFR 182.330
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 November 2025
Resolved 14 November 2025
Resolution: Observed MAWP marked and reviewed test record for hydrotest.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 August 2024
Resolved
Installation of diesel engine exhaust
pipe shall be in accordance with
§ 182.15-20...(a) Exhaust piping shall... be
gastight throughout its length...
Exhaust leaks detected in the engine room with USCG four
gas meter.
46 CFR 182.20-20 (old
T)
46 CFR 182.15-20 (old
T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2024
Resolution: Stbd engine overhaul & identified hole in muffler
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 5 August 2024
Resolved
Except as otherwise provided in this section, rails or
equivalent protection shall be installed near the
periphery of all weather decks accessible to
passengers and crews...
Rails of a sufficient height and/or courses not present
on cargo deck's stbd side, port side, and fantail.
46 CFR 177.35-1(a) (old
T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2024
Resolution: Rail courses in place
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 5 August 2024
Resolved
(c)Sound signal intensity and range of audibility. A
whistle fitted in a vessel shall provide, in the
direction of maximum intensity of the whistle and at a
distance of 1 meter from it, a sound pressure level in
at least one 1 3rd-octave band within the range of
frequencies... 180-2100 Hz (±1%) for a vessel of less
than 20 meters (65FT) in length, of not less than the
appropriate figure given in Table 86.01(c) of this
section...
The ship's whistle was IN-OP at the time of inspection
with a small handheld air horn present in lieu of the
installed system. The hand held horn is not adequate for
prolonged voyages in restricted visibility.
33 CFR 86.01(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 September 2024
Resolution: Ship's whistle functional
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 August 2024
Resolved
All escape hatches and other emergency exits used as
means of escape must be marked on both sides in clearly
legible letters at least 50 millimeters (2 inches) high:
“EMERGENCY EXIT, KEEP CLEAR”, unless such markings are
deemed unnecessary by the cognizant [name withheld] labeling in engine room is inadequately
lit under emergency power and is not in close proximity
to the escape.
46 CFR 185.606
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2024
Resolved 16 September 2024
Resolution: Emergency Exit signage in place
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 5 August 2024
Resolved
(a) The owner, charterer, master, or managing operator
of a vessel carrying overnight passengers shall have a
suitable number of watchmen patrol throughout the vessel
during the nighttime, whether or not the vessel is
underway, to guard against, and give alarm in case of, a
fire, man overboard, or other dangerous situation.(b)
Vessels described by 46 CFR 175.110(d) must submit plans
to the cognizant OCMI, in accordance with 46 CFR
176.700, for the installation and use of monitoring
device to ensure the wakefulness of the watchmen
required in paragraph (a) of this section...
Overnight accommodation space for 12 people observed
without an approved watch monitoring device.
46 CFR 185.410(a)&(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2024
Resolved 16 September 2024
Resolution: Crew Only.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 5 August 2024
Resolved
On vessels described by 46 CFR 175.110(d) of this
chapter, a passenger safety bill must be posted by the
master in each cabin or stateroom, and in passenger
accommodation spaces.
Overnight accommodation space for 12 people observed
without passenger safety bill posted in all applicable
areas.
46 CFR 185.515(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2024
Resolved 16 September 2024
Resolution: Berthing area's crew only
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 5 August 2024
Resolved
(c)Vessels described by 46 CFR 175.110(c) must have an
interconnected fire detection system in compliance with
§ 181.450 installed in all enclosed areas where
passengers and crew have routine access, including
accommodation spaces and machinery spaces.
The fire detectors onboard, Universal Security
Instruments SS-775, are not interconnected.
46 CFR 181.405(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2024
Resolved 27 January 2025
Resolution: Approved smoke detection installed and tested.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 5 August 2024
Resolved
Each Class 1 door on a vessel in ocean service must be
designed to withstand a head of water equivalent... in
no case less than 10 feet (3.05 meters).
Deteriorated condition of watertight doors on vessel
observed. USCG requires adjustment and/or gasket renewal
and chalk test in presence of inspector.
46 CFR 170.270(b) (old
T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2024
Resolved 16 September 2024
Resolution: Watertight door adjusted
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 5 August 2024
Resolved
(a) Each hatch exposed to the weather must be
watertight...
Deteriorated condition of hatches on vessel fantail.
USCG requires adjustment and/or gasket renewal and chalk
test in presence of inspector.
46 CFR 171.124(a) (old
T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2024
Resolved 16 September 2024
Resolution: Hatch gaskets and knife edge mended
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 5 August 2024
Resolved
(a)A pre-engineered fixed gas fire extinguishing system
must:(1) Be approved by the Commandant;(2) Be capable of
manual actuation from outside the space in addition to
automatic actuation by a heat detector;(3) Automatically
shut down all power ventilation systems and all engines
that draw intake air from within the protected space;
and(4) Be installed in accordance with the
manufacturer's instructions.
Remove both unapproved fire extinguishing balls from
engine room.
46 CFR 181.420(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2024
Resolved 16 September 2024
Resolution: Removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 August 2024
Resolved
Wiring Joints and splices. (1)Wiring Joints and splices
shall be mechanically secure and made in junction
boxes...
Observed unapproved screw-type wire nuts w/o a junction
box cover in galley.
46 183.05-50(b) (old T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2024
Resolved 16 September 2024
Resolution: Approved wire connections now in place.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 August 2024
No resolution recorded
The owner... shall notify the cognizant OCMI...
whenever... alterations affecting the safety of the
vessel, together with the nature of any repairs or
alterations contemplated.
Prior to operations, schedule USCG inspection during
crane installation for verification of MSC's H1-2402935.
46 CFR 176.665(a)
Action required: 705 - Other - as specified
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 July 2023
Resolved
After loading and prior to departure and at all other times necessary to assure the safety of the vessel, the
master shall determine that the vessel complies with all applicable stability requirements in the vessel's trim and stability book, stability letter, Certificate of Inspection, and Load Line Certificate, as the case may be.
As per the stability letter issued to the vessel on October 15th, 1981, the vessel shall only load cargo within the safe operating region of the LOADING DIAGRAM and the center of gravity of the deck cargo shall not exceed 3 feet above the main deck. In addition, the crane installed on board must only be utilized in the capacity highlighted in the request letter issued to this office dated July 18th, 2023 valid for 30 days only.
Action required: 705 - Other - as specified
Resolved 5 August 2024
Resolution: Crane removed vessel operating IAW stability letter. Seperate deficiency written covering the crane install on (when it happens) on 05AUG2024.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 June 2023
Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations.
Starboard main engine has an exhaust leak.
46 CFR 182.05-1 (a)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 27 June 2023
Resolved 23 June 2023
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 13 June 2023
Resolved
All vessels of 26 feet in length and over shall be provided with individual bilge lines and bilge suction for each watertight compartment.
Lazarette was unable to be pumped out at the time of inspection.
46 CFR 182.25-5 (a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 June 2023
Resolved 23 June 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 13 June 2023
Resolved
A hatch exposed to the weather must be watertight.
Three lazarette hatches require new gaskets.
46 CFR 179.360
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 23 June 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 June 2023
Resolved
All life ring life buoys shall be marked with the vessel’s name.
Vessel’s ring buoys were not marked with vessel’s name.
46 CFR 185.30-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 23 June 2023
11 - Life Saving Appliances › N/A - No Subsystem › Evaluation, testing and approval
Issued 13 June 2023
Resolved
The master of the vessel shall ensure that the EPIRB is tested monthly.
No monthly EPRIB tests have been carried out.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 23 June 2023
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 13 June 2023
Resolved
MI observed the hydrostatic release unit on the port side IBA was improperly installed. Proper installment must be completed before operating on an oceans or coastwise route.
46CFR180.10-5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 June 2023
Resolved 23 June 2023
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 13 June 2023
Resolved
All vessels with crew members living on board shall be provided with crew accommodations of sufficient size, adequate construction, and with suitable equipment to provide for the protection and accommodation of the
crew in a manner practicable for the size, facilities, and service of the vessel.
Accommodation space by the galley area didn't have a smoke detector and was missing the light cover and the smoke detector in the accommodation space on the bridge was expired.
46CFR177.25-1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 23 June 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 June 2023
Resolved
As per the stability letter issued to the vessel on October 15th, 1981, the vessel shall only load cargo within the safe operating region of the LOADING DIAGRAM and the center of gravity of the deck cargo shall not exceed 3 feet above the main deck. In addition, the installed crane on board must not be utilized until proper stability calculations are performed in accordance with 46 CFR 173 by a naval architect.
Action required: 705 - Other - as specified
Resolved 19 July 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 2 March 2020
Resolved
Vessel was due for DD/ISE by February 29, 2020. DD/ISE did not happen until March 2. 46 CFR 176.600 701C
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2020
Resolved 2 March 2020
Resolution: DD ISE completed.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 2 March 2020
Resolved
Transverse L-Beam in Lazarette next to port watertight hatch is severly corroded and needs to be cropped and renewed. 46 CFR 177.100 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2020
Resolved 3 March 2020
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 17 June 2019
Resolved
EPIRB monthly test is not being consistently recorded in the ship's log. Record test monthly in log book.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 June 2019
Resolved 17 June 2019
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 17 June 2019
Resolved
LSA equipment maintenance and record keeping are not consistently entered in ship's log. Record maintenance of the ship's life saving equipment in logbook.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 June 2019
Resolved 17 June 2019
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 17 June 2019
Resolved
The engine room escape hatch did not open from the engine room and was only able to be opened from the outside deck. The handle was seized and requires maintenance for escape from the engine room. Lubricate all moving parts, exercise profusely and test.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 2 July 2019
Resolution: scuttle was taken apart, cleaned, lubricated and re-installed. Operation checked by attending marine inspector.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 17 June 2019
Resolved
The remote fuel shut off valve did not indicate the position of the valve in the engine room. Install signage that indicates position of the valve as open or closed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 2 July 2019
Resolution: vessel representative wrote on engine room bkhd with paint indicating the operation and position of the fuel cut off valve.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 17 June 2019
Resolved
The signage for immersion suits and PFDs in the accommodation space were incorrect. Install proper signage with corresponding labels and number of units on each stowage location.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 2 July 2019
Resolution: vessel representative moved the PFDs and immersion suits to their proper stowage locations.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 17 June 2019
Resolved
While conducting man overboard drill, the master and the deckhand did not have sufficient communications (hand held radios or other means to communicate clearly). Provide crew with hand held radios or similar devices to improve communications during emergencies and drills.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 2 July 2019
Resolution: vessel representative provided the vessel with 4 hand held radios and charging docks to stay with the vessel at all times.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 10 September 2018
Resolved
The master shall conduct sufficient drills. Vessel must provide means for deckhand to communicate with master without losing sight of man overboard during drill.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 October 2018
Resolved 1 October 2018
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 March 2018
Resolved
Vessel is past due for drydock inspection and is restricted from carrying passengers until credit drydock is completed by CG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 March 2018
Resolution: Credit drydock granted.