Records from 1982 to 2019. Most recent: inspection, 23 April 2019.
Inspection history · 99
23 April 2019
Administrative Inspection · Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6668825
26 March 2019
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6658148
12 January 2016
COC-MODU Annual
Type not classified · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5799451
6 October 2015
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5736843
11 July 2012
COC-MODU Annual
Type not classified · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4320104
19 January 2012
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4227855
6 December 2011
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4202621
4 May 2009
COC-MODU Renew
Type not classified · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3505068
12 June 2008
COC-MODU Annual
Type not classified · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3234642
2 January 2008
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3123765
8 June 2007
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2968391
15 May 2007
COC-MODU Renew
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2933736
5 May 2006
COC-MODU Annual
Type not classified · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2641336
7 October 2005
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2509865
10 May 2005
COC-MODU Renew
Type not classified · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2353787
2 February 2005
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2301296
8 June 2004
Certificate of Compliance
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2095474
21 August 2003
Annual Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1887468
28 March 2003
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1764295
20 March 2003
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1760200
14 December 2002
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1718981
22 September 2002
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1678655
20 June 2002
Certificate of Compliance
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1633226
15 May 2002
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1616941
27 July 2001
Letter of Compliance (Initial/Renewal)
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1449491
5 October 2000
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 38560
27 September 2000
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1054138
1 September 2000
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 821935
24 July 2000
Letter of Compliance (Initial/Renewal)
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1451589
16 September 1999
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1119921
30 August 1999
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 759595
1 August 1999
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 199364
30 July 1999
Letter of Compliance (Initial/Renewal)
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1446837
29 January 1998
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1108063
26 November 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 775961
6 November 1997
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1448973
22 August 1997
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1121965
25 July 1997
Drydock Extension
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 783122
15 October 1996
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1156366
13 September 1996
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1430277
15 March 1996
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1400357
28 November 1995
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1191579
27 October 1995
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1452082
11 July 1995
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 882665
29 June 1995
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1190720
30 May 1995
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 871902
14 May 1995
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 909407
13 February 1995
Hull Examination · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1454156
18 January 1995
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 864737
22 November 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 89265
25 October 1994
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 864649
16 September 1994
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1423998
12 January 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 850363
11 December 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 113628
5 November 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 843251
28 September 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1409022
24 May 1993
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 837560
29 October 1992
COI Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1428161
22 October 1992
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1262172
12 May 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 956602
10 March 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 676518
5 March 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1317123
28 February 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 107004
28 February 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 124968
13 February 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1414050
28 January 1992
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 958208
5 December 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1254255
29 October 1991
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 938689
18 October 1991
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1251745
8 October 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1247870
15 April 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 902417
7 January 1991
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 917032
11 October 1990
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 901045
6 September 1990
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1241114
12 April 1990
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1230943
15 February 1990
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 926074
30 December 1989
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1237787
12 December 1989
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 920595
19 September 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1195201
8 March 1989
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1040325
8 September 1988
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1042068
6 June 1988
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1196950
5 January 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1007372
8 December 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1002593
21 September 1987
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1008179
1 September 1987
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1315927
13 August 1987
Hull Examination
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1002351
3 August 1987
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1030619
29 May 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1333874
5 March 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1315388
22 December 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1321114
9 September 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1318394
19 July 1985
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1288376
25 April 1985
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 978841
14 December 1984
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1284571
27 September 1984
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 974509
7 September 1984
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1282265
30 August 1982
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1273013
30 August 1982
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1279794
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 12 January 2016
Resolved
Embarkation railing on LB#3 is severely corroded and does not meet scantling in accordance with construction portfolio. Repair or replace to original condition.
Action required: 705 - Other - as specified
Due 12 February 2016
Resolved 18 January 2016
Resolution: Received email from Capt with accompanying pictures stating that the deficiency has been repaired.
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 12 January 2016
Resolved
The pressure balance valve in LB#4 is severly corroted and not operational. Repair/replace to original condition.
Action required: 705 - Other - as specified
Due 12 February 2016
Resolved 18 January 2016
Resolution: Received email from Capt with accompanying pictures stating that the deficiency has been repaired.
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 12 January 2016
Resolved
In accordance with lifeboat operating manual the breathing air bottle operating pressure should be above 19MPa. The #1 bottle in LB#2 is below 19MPa. Ensure breathing air is at least 19MPa in LB#2.
Action required: 705 - Other - as specified
Due 26 January 2016
Resolved 18 January 2016
Resolution: Received email from Capt with accompanying pictures stating that the deficiency has been repaired.
Construction/Loadline › Penetrations › Gasket
Issued 12 January 2016
Resolved
Bulkhead Penetrations for electrical panel in starboard aux pump room is missing blocks for MCT. Repair to original condition.
Action required: 705 - Other - as specified
Due 26 January 2016
Resolved 18 January 2016
Resolution: Received email from Capt with accompanying pictures stating that the deficiency has been repaired.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 16 July 2012
Resolved
Found ventilation shutters on the Emergency Generator radiator not sealing completely. Repair/replace the shutters to have them close completely. Code 0745. Cite 89 MODU Code 9.5.2 & 9.10.1. Action 50c.
Due 16 August 2012
Resolved 20 July 2012
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 16 July 2012
Resolved
Fire shutters in the Galley could not be tested. Prove proper operation of the Galley shutters on the serving line and Scullery. Code 0745. Cite 89 MODU Code 9.1.4. Action 50c.
Due 16 August 2012
Resolved 20 July 2012
Lifesaving › Lifeboat › Fire Protection (water spray system)
Issued 15 May 2007
Resolved
Conduct operational tests of all lifeboats and waterspray systems.
Condition: Unknown
Due 1 June 2007
Resolved 1 June 2007
Resolution: Tested successfully.
Documentation
Issued 27 July 2001
Resolved
UPDATE OPERATION MANUAL TO INCLUDE MOST CURRENT VERSION OF FIRE CONTROL PLAN.
Condition: Unknown
Due 31 July 2001
Resolved 10 August 2001
Lifesaving
Issued 27 July 2001
Resolved
PROVIDE PROOF OF PROPER OPERATION OF # 3 LIFEBOAT BRAKE. BOAT TO REMAIN IN USEABLE POSITION VIA SAFETY PENDANTS UNTIL BRAKE IS REPAIRED.
Condition: Unknown
Due 31 July 2001
Resolved 31 July 2001
Lifesaving
Issued 27 July 2001
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 23 August 2001
Resolved 31 July 2001
Electrical
Issued 27 July 2001
Resolved
PROVIDE PROOF OF AUTO START/AUTO TRANSFER OF EMERGENCY GENERATOR LOAD/BUSS AT EARLIEST OPPORTUNITY AND MONTHLY THEREAFTER (2 HOURS WITH LOAD).
Condition: Unknown
Due 31 July 2001
Resolved 10 August 2001
Electrical
Issued 27 July 2001
Resolved
PROVIDE PROOF OF ALARMS/SHUTDOWNS ON #1 GENERATOR WHEN BACK IN SERVICE.
Condition: Unknown
Due 23 August 2001
Resolved 31 July 2001
Lifesaving
Issued 27 July 2001
Resolved
PROVE PROPER OPERATION OF SPRINKLER SYSTEM AND FORWARD AND REVERSE FOR #1 AND #3 LIFEBOATS.
Condition: Unknown
Due 23 August 2001
Resolved 31 July 2001
Navigation
Issued 27 July 2001
Resolved
PROVE PROPER OPERATION AND SYNCHRONIZATION OF OBSTRUCTION LIGHTS.
Condition: Unknown
Due 23 August 2001
Resolved 31 July 2001
Lifesaving
Issued 27 July 2001
Resolved
PROVE EXPIRATION DATE OF RING BUOY SMOKE CANISTERS.
Condition: Unknown
Due 31 July 2001
Resolved 10 August 2001
Documentation
Issued 27 July 2001
Resolved
PROVIDE PROOF OF DECK OFFICER LICENSE FOR MICHAEL JOSEPH.
Condition: Unknown
Due 23 August 2001
Resolved 31 July 2001
Documentation
Issued 27 July 2001
Resolved
PROVIDE PROOF OF "APPROVAL" FOR HAZARDOUS LOCATION PLAN.
Condition: Unknown
Due 31 July 2001
Resolved 10 August 2001
Documentation
Issued 27 July 2001
Resolved
UPDATE COAST GUARD WEEKLY LOG TO REFLECT COMPLIANCE WITH 46 CFR 109.213(E)AND 109.213(D).
Condition: Unknown
Due 23 August 2001
Resolved 31 July 2001
Documentation
Issued 27 July 2001
Resolved
PROVIDE "APPROVAL" VICE "REVIEW" OF LIFESAVING PLAN.
Condition: Unknown
Due 23 August 2001
Resolved 21 August 2003
Lifesaving
Issued 27 July 2001
Resolved
REPAIR OR RENEW MAIN AIR VALVE ON # 4 LIFEBOAT.
Condition: Unknown
Due 23 August 2001
Resolved 31 July 2001
Electrical
Issued 27 July 2001
Resolved
PROVE OVERSPEED ALARM ON EMERGENCY GENERATOR.
Condition: Unknown
Due 31 July 2001
Resolved 10 August 2001
Electrical
Issued 27 July 2001
Resolved
REMOVE OR RELOCATE SONARDYNE BOX IN HELO FUEL CLASSIFIED LOCATION TO AN AREA OUTSIDE CLASSIFIED LOCATION.
Condition: Unknown
Due 23 August 2001
Resolved 31 July 2001
Electrical
Issued 27 July 2001
Resolved
PROVIDE PROOF THAT MUD LOGGER BOXES LOCATED ON DRILL FLOOR AND MUD PITS AREINTRINSICALLY SAFE.
Condition: Unknown
Due 23 August 2001
Resolved 31 July 2001
Documentation
Issued 6 November 1997
Resolved
OBTAIN LOAD LINE EXTENSION AND PROVIDE COPY TO [name withheld].
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Electrical
Issued 6 November 1997
Resolved
CONDUCT SATISFACTORY TEST OF THE TOTAL RIG EMERGENCY SHUT DOWN SYSTEM.
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Lifesaving
Issued 6 November 1997
Resolved
CONDUCT FIBERGLASS REPAIRS TO BOTH LIFEBOATS NOTED BY SURVIVAL SYSTEMS INTERNATIONAL, REPORT DATED 24OCT97.
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Lifesaving
Issued 6 November 1997
Resolved
PROVIDE DOCUMENTAION OF LIFERAFT DAVIT FALLS RENEWAL AND REQUIRED WEIGHT TEST TO 110%.
Condition: Unknown
Due 7 November 1997
Resolved 7 November 1997
Unknown
Issued 6 November 1997
Resolved
MAKE AIR RECEIVER IN MACINERY SPACE AVAILABLE FOR INTERNAL EXAM OR HYROSTATICALLY TEST IN ACCORDANCE WITH 46CFR54.
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Lifesaving
Issued 6 November 1997
Resolved
IMPLEMENT POLICY TO LOWER LIFEBOATS AND OPERATE LIFERAFT DAVITS AT EACH DRILL IN ACCORDANCE WITH 46CFR109.213(d).
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Lifesaving
Issued 6 November 1997
Resolved
IMPLEMENT POLICY TO INSTRUCT THE CREW AND INDUSTRIAL PERSONNEL IN THE USE OF THE UNIT'S FIRE EXTINGUISHING APPLIANCES, LIFESAVING APPLIANCES AND IN THE SURVIVAL AT SEA, AT THE SAME INTERVALS AS EACH REQUIRED DRILL AND LOG APPROPRIATELY. ref. 46CFR109.213(g).
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Lifesaving
Issued 6 November 1997
Resolved
IMPLEMENT POLICY FOR PERSON IN CHARGE TO ENTER A STATEMENT IN THE LOG_x001C_ STATING ADEQUATE REASONS FOR NOT CONDUCTING THE REQUIRED DRILLS AND TRAINING. ref. 46CFR109.213. (h)(2).
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Lifesaving
Issued 6 November 1997
Resolved
IMPLEMENT POLICY TO CONDUCT AND LOG A DRILL WITHIN 24 HOURS OF EACH CREW CHANGE, INCLUDING INDUSTRIAL PERSONNEL, IF MORE THAN 25% OF THE PERSONS ON BOARD HAVE NOT PARTICIPATED IN AN ABANDONMENT DRILL IN THE PREVIOUS MONTH. ref. 46CFR109.213(c)(2).
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Unknown
Issued 6 November 1997
Resolved
CONDUCT NDE OF ALL DRY BULK TANKS. PROVIDE NDE REPORT TO [name withheld].
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Fire Fighting
Issued 6 November 1997
Resolved
CROP AND RENEW WASTED PIPING IN COLUMNS, AS NECESSARY. CROP AND RENEW FIREMAIN PIPING IN AFT COLUMN. REPAIR PACKING LEAK IN FIRE PUMP IN AFT COLUMN.
Condition: Unknown
Due 6 November 1997
Resolved 6 November 1997
Engineering
Issued 13 September 1996
Resolved
MAKE BULK TANKS 1,3,& 4 READY FOR INTERNAL INSPECTION AT NEXT RIG MOVE.
Condition: Unknown
Due 13 October 1996
Resolved 17 October 1996
Engineering
Issued 13 September 1996
Resolved
MAKE RIG AIR RECEIVERS IN BULK COMPRESSOR ROOM READY FOR INSPECTION AT NEXTRIG MOVE.
Condition: Unknown
Due 13 October 1996
Resolved 17 October 1996
Documentation
Issued 27 October 1995
Resolved
PROVIDE APPROVED HAZARDOUS ZONE AND FIRE SAFETY PLAN AND POST FOR CREW INFORMATION.
Condition: Unknown
Due 27 October 1995
Resolved 27 October 1995
Documentation
Issued 27 October 1995
Resolved
OBTAIN CURRENT COPIES OF 46CFR AND 33CFR PERTAINING TO THIS RIG.
Condition: Unknown
Due 27 October 1995
Resolved 27 October 1995
Lifesaving
Issued 27 October 1995
Resolved
PROVIDE ADEQUATE NUMBER OF FLARES WITH SATISFACTORY MANUFACTURER AND EXPIRATION DATES (MISSING 3 OF 12).
Condition: Unknown
Due 27 October 1995
Resolved 27 October 1995
Accommodation/Occupational Safety
Issued 14 May 1995
Resolved
SUBMIT TO PATMS "U-1A MANFACTURER'S DATA REPORT FOR PRESSURE VESSELS" AND "LETTER OF CERTIFICATION" OF MATERIALS USED IN MANUFACTURING OF PRESS. VSL TO BE IN COMPLIANCE WITH ASME CODE RULES SECTION VIII, DIVISION 1 FOR THE DRILL FLOOR AIR RECEIVER TANK.
Condition: Unknown
Due 14 May 1995
Resolved 14 May 1995
Accommodation/Occupational Safety
Issued 14 May 1995
Resolved
HAVE CG MARINE INSPECTOR EXAMINE FINAL INSTALLATION OF NEWLY INSTALLED AIR RECEIVER TANK ON DRILL FLOOR AND PRESSURIZE TANK TO MAX. OF MAWP TO TEST RELIEF VALVE.
Condition: Unknown
Due 14 May 1995
Resolved 14 May 1995
Unknown
Issued 13 February 1995
Resolved
PROVIDE DATA PLATE FOR SAFETY RELIEF VALVE ON MACHINERY SPACE AIR RECIEVER OR REPLACE VALVE.
Condition: Unknown
Due 23 March 1995
Resolved 7 April 1995
Unknown
Issued 13 February 1995
Resolved
MAKE TESTS AS REQUIRED TO PROVE SHELL PLATE WASTEAGE ON DRILL FLOOR AIR RECIEVER HAS NOT EXCEEDED ALLOWABLE LIMITS AS SET BY MANUFACTURER.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Unknown
Issued 13 February 1995
Resolved
SUBMIT DIVERS REPORT, ABS UNDER WATER SURVEY REPORT AND VIDEO OF SEILOD TO MSO PORT ARTHUR.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Unknown
Issued 13 February 1995
Resolved
MAKE SEACHEST VALVE READY FOR INSPECTION DURING PHASE II OF SELOID.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Unknown
Issued 13 February 1995
Resolved
MAKE READY FOR INSPECTION ALL TANKS EXCEPT FUEL AND POTABLE WATER FOR PHASEII OF SELOID.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Unknown
Issued 16 September 1994
Resolved
MAKE RIG FLOOR AIR RECEIVER(S) AVAILABLE FOR INTERNAL INSPECTION AND POP TEST CORRESPONDING RELIEF VALVES.
Condition: Unknown
Due 16 September 1994
Resolved 16 September 1994
Lifesaving
Issued 16 September 1994
Resolved
CONDUCT FUNCTION TEST OF TOTAL RIG SHUT DOWN DEVICE.
Condition: Unknown
Due 16 September 1994
Resolved 16 September 1994
Lifesaving
Issued 28 September 1993
Resolved
PROPERLY REPAIR CRACKS IN PORT CAPSULE TOP AT FORWARD STBD DOOR AND STBD STBD RETAINING PAD AREA
Condition: Unknown
Due 28 September 1993
Resolved 28 September 1993
Documentation
Issued 28 September 1993
Resolved
PROVIDE ON BOARD USCG APPROVED EMERGENCY EVACUATION PLAN.
Condition: Unknown
Due 28 September 1993
Resolved 28 September 1993
Fire Fighting
Issued 29 October 1992
Resolved
CONDUCT HYDROSTATIC TEST ON ALL FIRE HOSES PRIOR TO BEGINNING DRILLING OPERATIONS.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Engineering
Issued 29 October 1992
Resolved
REARRANGE DIESEL OIL VENT FROM TANK IN CEMENT UNIT ROOM TO VENT OUTSIDE. MUST BE LOCATED OUTSIDE "OPEN AIR" WORKSHOP ADJACENT TO CEMENT UNIT ROOM.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Engineering
Issued 29 October 1992
Resolved
REMOVE HANDLE LOCK LATCH FROM FUEL NOZZEL FOR CEMENT UNIT FUEL FILL LINE-- MAKE DEAD MAN NOZZEL.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Engineering
Issued 29 October 1992
Resolved
RENEW SIGHTGLASS WITH HEAT RESISTANT GLASS IN DAY TANK AND STAND-BY DIESEL TANK.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Electrical
Issued 29 October 1992
Resolved
PROVE PRUGE ALARMS FOR "ROSS HILL CONTROLS SCR SELECTOR" AND "WMCO INSTRUMENTS" PUMP STROKE COUNTER AT DRILLERS CONSOLE PRIOR TO BEGINNING DRILLING OPERATIONS.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Accommodation/Occupational Safety
Issued 29 October 1992
Resolved
PROVE PROPER OPERATION OF ALL DRY BULK TANK RELIEF VALVES (4).
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Unknown
Issued 29 October 1992
Resolved
MAKE INTERCOMM SYSTEM/TELEPHONE OPERATIONAL IN STBD (HELIPORT AS BOW) PUMP ROOM.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Electrical
Issued 29 October 1992
Resolved
PROVE PROPER OPERATION OF EMERGENCY BATTERY POWERED LANTERN IN WORKSHOP BETWEEN GENERATOR ROOM AND STAND-BY GENERATOR ROOM.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Lifesaving
Issued 29 October 1992
Resolved
CONDUCT FIRE AND BOAT DRILL IN PRESENCE OF A COAST GUARD MARINE INSPECTOR PRIOR TO BEGINNING DRILLING OPERATIONS.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Construction/Loadline
Issued 29 October 1992
Resolved
MAKE BALLAST SYSTEM FULLY OPERATIONAL.
Condition: Unknown
Due 9 November 1992
Resolved 9 November 1992
Construction/Loadline
Issued 29 October 1992
Resolved
MAKE LOW SUCTION SEA VALVES IN EACH LEG AVAILABLE FOR COAST GUARD INSPECTION.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Lifesaving
Issued 29 October 1991
Resolved
REPAIR THE FOLLOWING LIMIT SWITCHES: #1 LIFEBOAT - ADJUST AFT SWITCH, REPAIR FORWARD SWITCH; #2 LIFEBOAT - REPAIR AFT SWITCH
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Fire Fighting
Issued 29 October 1991
Resolved
REPLACE FIRE EXTINGUISHERS #57, #58, #61 WITH ONES MEETING HYDRO TEST REQUIREMENTS.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
PROPERLY SUPPORT ALL ELECTRICAL CABLES WITH 5/8" METALLIC BAND STRAPPING ASPER IEEE-45 IN VERTICAL WIRE RUNS IN ALL 3 COLUMNS.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Lifesaving
Issued 29 October 1991
Resolved
OPERATE BOTH LIFEBOATS IN THE WATER.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Construction/Loadline
Issued 29 October 1991
Resolved
IN STBD PUMP ROOM, GAGE OR RENEW DRILL WATER TANK SUCTION PIPE AND #2 BALLAST PUMP DISCHARGE PIPING AT ELBOW.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Construction/Loadline
Issued 29 October 1991
Resolved
REPLACE DEFECTIVE HYDRAULIC HOSES IN STBD PUMP ROOM.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
REPAIR WIRING TO 2 PORTABLE LAMPS.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Accommodation/Occupational Safety
Issued 29 October 1991
Resolved
IN AFT PUMP ROOM, WELD BRACES FOR COMPRESSED AIR PIPING.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Construction/Loadline
Issued 29 October 1991
Resolved
REPAIR INOPERATIVE HAND VALVE IN AFT PUMP ROOM FOR #2 BALLAST DISCHARGE.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
REPAIR OR REMOUNT PUBLIC ADDRESS SPEAKER IN PORT PUMP ROOM.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Construction/Loadline
Issued 29 October 1991
Resolved
REPAIR INOPERATIVE HAND VALVE IN STBD PUMP ROOM FOR CROSS CONNECT BETWEEN DRILL WATER AND #2 BALLAST PUMP PIPING.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Construction/Loadline
Issued 29 October 1991
Resolved
REPAIR HYDRAULIC LEAKS ON HOSES AND FITTINGS IN STBD PUMP ROOM.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Construction/Loadline
Issued 29 October 1991
Resolved
REPAIR HYDRAULICALLY OPERATED VALVE IN AFT PUMP ROOM TO TANK A4 AND DEMONSTRATE OPERATION.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
REPLACE INOPERATIVE LIGHT BULBS IN AFT COLUMN AND PORT COLUMN.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
REPLACE LIGHT FIXTURE TO HEAT LAMP AT AFT LEG WITH MARINE TYPE FITTING.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
IN PORT PUMP ROOM, REPLACE RUSTED ELECTRICAL CONNECTION COVER TO #1 BALAST PUMP.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Fire Fighting
Issued 29 October 1991
Resolved
TEST ALL (4) OXYGEN AND GAS DETECTORS.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Construction/Loadline
Issued 29 October 1991
Resolved
IN PORT PUMP ROOM, GAGE PIPING TO DRILL WATER TANK SUCTION.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
PROPERLY SUPPORT ALL ELECTRICAL CABLES WITH 5/8" METALLIC BAND STRAPPING PER IEEE-45 IN ALL 3 PUMP ROOMS.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Lifesaving
Issued 29 October 1991
Resolved
REPLACE FOLLOWING ITEMS IN LIFEBOAT #1 - WRENCH (6"), HEAVING LINE (REMOVE NUT); IN LIFEBOAT #2 - HEAVING LINE, ASPIRIN, EYEWASH.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
REPLACE ALL NON-ARMORED OR [name withheld] I DIVISION I AREAS.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
MOUNT J-BOX TO PUBLIC ADDRESS HORN IN GENERATOR ROOM.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Accommodation/Occupational Safety
Issued 29 October 1991
Resolved
REPAIR DOOR TO SACK STORAGE.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Fire Fighting
Issued 29 October 1991
Resolved
RECHARGE HALON BOTTLE (OUTBOARD) IN ENGINE ROOM.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
PROVIDE SAFETY LEASHES ON ALL LIGHTS ON RIG FLOOR, SHALE SHAKER AREA, AND MUD PITS.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Deck/Cargo
Issued 29 October 1991
Resolved
REPAIR ELECTRICAL WIRING NEXT TO LOWER WIRE SPOOL ON PORT CRANE.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Lifesaving
Issued 29 October 1991
Resolved
INSTALL PROPER LIGHT FOR EMBARKATION DECK AT LIFEBOAT #2.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
REWIRE PLUG TO SECOND OUTLET BY SINK IN MUD LAB.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
TEST EMERGENCY SHUTDOWNS TO VENT CIRCUIT BREAKER (MD-3), AND #2 FUEL PUMP CIRCUIT BREAKER.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
REPAIR CONNECTION TO MUD LAB PUBLIC ADDRESS HORN.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Electrical
Issued 29 October 1991
Resolved
REPAIR EMERGENCY LIGHT IN E/R #26 AND IN SACK ROOM.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Unknown
Issued 6 September 1990
Resolved
PROVIDE ON BOARD VESSEL VALID LOAD LINE CERTIFICATE WITH ENDORSEMENTS.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPAIR SWITCHES ON STARBOARD LIFEBOAT (FACING HELO DECK.)
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
HYDROSTATICALLY TEST NEWLY INSTALLED SECTION OF FIRE MAIN IN BOW COLUMNS (FACING HELO DECK) TO 1 1/4 X DESIGN RELIEF PRESSURE OF FIRE PUMP (BUT NOT LESS THAN 125 PSI.)
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
TEST EMERGENCY GENERATOR UNDER 2 HOUR LOAD TEST IN ACCORDANCE WITH 46 CFR 109.211 AND LOG.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
OPERATE LIFERAFTS IN WATER AND LOG.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
CONDUCT TESTS OF EMEGENCY BATTERIES AND LOG IN ACCORDANCE WITH 46 CFR 109.211.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
SERVICE HALON 1301 SYSTEM IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
RE- MARK GENERATOR ALARM BELL IN SACK ROOM (PAINTED).
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPLACE NON - EXPLOSION PROOF DRIVER WITH EXPLOSION PROOF TYPE CLASS I DIV-ISION I AREA LOCATED ABOVE DE - GASSER.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPLACE WASTED PIPE HANGERS ON PIPING IN OVERHEAD LOWER SHAKER AREA.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPLACE WASTED CONDUIT ACCESS COVERS TO EXPLOSION PROOF SWITCH BOXES FOR BOTH INBOARD SHALE SHAKERS.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REMOVE "SO" CABLE FROM EXPLOSION PROOF SWITCH BOXES TO UPPER SHAKERS. REPLACEMENT MUST BE MI OR ARMORED.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REMOVE "SO" CABLE FROM UPPER SHAKER AREA OVERHEAD. REPLACEMENT SHALL BE TYPE MI OR ARMORED.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPAIR LOSS OF PURGE ALARM TO LOGGING TRAILER. DECREASE TIME DELAY OF ALARM.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REMOVE "SO" CABLE FROM RIG FLOOR STARBOARD SIDE, REPLACE WITH APPROVED SHIPBOARD MARINE CABLE.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
PROVIDE PURGE AND LOSS OF PURGE ALARM FOR DRIL - SENTRY ALARM FOR DRILLER'SCONTROL CABINET BY DRILLER'S STATION RIG FLOOR.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
PROVIDE FOR INSPECTION RIG AIR RECIEVERS AND TEST OF RELIEF VALVES.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
PROVIDE EXPLOSION PROOF ENCLOSURE OR PURGE IN ACCORDANCE WITH NFPA 496 SWACO PUMP STROKE COUNTER, STARBOARD SIDE RIG FLOOR.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REHANG OVERHEAD WIRING STARBOARD SIDE AFT ROG FLOOR, TIES SHALL BE 5/8" DIAMETER (MINIMUM) NON - CORROSIVE BANDS IN ACCORDANCE WITH IEEE - 45.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
PROVIDE VISUAL OR AUDIBLE LOSS OF PURGE ALARM FOR 480V DRILL FLOOR SWITCH BOX LOCATED BEHIND DRAWWORKS ON AFT BULKHEAD (NOTE: IF VISUAL MUST BE LO- CATED AT DRILLER'S CONSOLE.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
PROVIDE DETAILED DRAWINGS OF FIRE MAIN INSTALLATION / REPLACMENT IN BOW COLUMN TO THE ABOVE NOTED OFFICE.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPLACE HYDRAULIC CONTROL LINE FOR VALVE ACTUATOR TO TANK AB IN BOX FOOTING.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPAIR EMERGENCY LIGHT LOCATED IN FOOTING OF BOW LEG.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPAIR EMERGENCY LIGHT LOCATED IN FOOTING OF PORT LEG (FACING HELO DECK.)
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPAIR LOUDSPEAKER LOCATED IN FOOTING OF PORT LEG (FACING HELO DECK.)
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
VERIFY SETTING OF OVERSPEED TRIP ONEMERGENCY GENERATOR USING DIGITAL TACHO-METER OR OTHER SUITABLE MEANS.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPLACE RIG PHONE IN EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REPAIR OVERSPEED ANNUCIATOR LIGHT AND ROTATING BEACON ON #2 EMD.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
PROVIDE 2 PAIRS OF NON-CONDUCTIVE GLOVES FOR FIREMANS' OUTFITS.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
PROVIDE 7 SPARE AIR BOTTLES FOR FIREMANS' OUTFITS (SURVIVE AIR BREATHING APPARATUS LOCATED IN CONTROL ROOM.)
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
PROVIDE 2 ADDITIONAL SPARE CO2 PORTABLES AND HYDRO THE 2 SPARES CURRENTLY ON BOARD.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
REATTACH LIGHT TO MOUNTING (FOURTH FROM BOTTOM) IN STARBOARD COLUMN (FAC- ING HELO DECK.)
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
PROVIDE TIP FOR FOG APPLICATOR OUTSIDE SACK ROOM/BOW MAIN DECK ACCESS.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 6 September 1990
Resolved
COMPLETE REPAIRS TO FIRE MAIN IN BOW COLUMN (FACING HELO PORT) PRIOR TO 8 SEPTEMBER 1990. IF REPAIRS ARE NOT FINISHED BY 8 SEPTEMBER 1990, A PORTABLE PUMP CAPABLE OF PRODUCING SUFFICIENT FIRE FIGHTING WATER MUST BE PUT ON BOARD TO CHARGE THE MAIN.
Condition: Unknown
Due 6 September 1990
Resolved 6 September 1990
Unknown
Issued 30 December 1989
Resolved
MAKE OPERABLE BILGE PUMP IN BOW COLUMN BENEATH HELO DECK.
Condition: Unknown
Due 30 December 1989
Resolved 30 December 1989
Unknown
Issued 30 December 1989
Resolved
MAKE OPERABLE STBD LIFEBOAT. RAIN WATER PUMP IS CURRENTLY INOPERABLE. PROVIDE LIFEBOAT FOR TESTING IN THE PRESENCE OF AN ATTENDING COAST GUARD MARINE INSPECTOR. NOTIFY [name withheld] WHEN REPAIRS ARE COMPLETED.
Condition: Unknown
Due 30 December 1989
Resolved 30 December 1989
Unknown
Issued 30 December 1989
Resolved
RENEW AS NECESSARY CABLE CLAMPS IN BOW PUMP ROOM (BENEATH HELO DECK). RENEW AS NECESSARY COOLING COWLINGS ON PUMP MOTORS IN BOW PUMP ROOM (BENEATH HELO DECK).
Condition: Unknown
Due 30 December 1989
Resolved 30 December 1989
Unknown
Issued 8 September 1988
Resolved
UPDATE THE FIRE CONTROL PLAN AND SUBMIT FOR APPROVAL.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
OPERATIONALLY TEST THE RIG SHUTDOWN.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
REPLACE B-V HOSE (EX 607 1981) ON THE STARBOARD CONTROL ROOM UNIT.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
TEST THE EMERGENCY GENERATOR LOW LUBE OIL PRESSURE ALARM.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
REPAIR AND TEST THE STARBOARD LEG FUEL OIL REMOTE CUT OUT VALVE.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
LABEL HALON PULL BOXES.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
LABEL PAINT LOCKER CO2 PULL BOX.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
REPAIR AND TEST EMERGENCY LIGHT IN THE SACK ROOM NEAR THE MUD PIT ROOM DOOR. (RELOCATE 5' FROM OPENING).
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
REPAIR 1" HOLE IN MUD PIT ROOM BULKHEAD APPROXIMATELY 5' INBOARD FROM THE WATERTIGHT DOOR.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
PROVIDE RUBBER MAT FOR EMERGENCY SWITCHBOARD.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
TEST RIG AIR DRILL FLOOR, 4 BULK AIR, 2 BULK AIR COMPRESSOR RELIEF VALVES.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
INSTALL PRESSURE GAUGE ON THE AFT LEG FIRE PUMP.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
REPAIR LOOSE AND WORN WIRE FROM DRAW WORKS MOTOR HEATER.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
PROVIDE DOCUMENTATION FOR ABLE SEAMAN, H. A. COLBERT.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
INTERNALLY EXAMINE 4 BULK AIR, 1 RIG AIR, 1 DRILL FLOOR, AND 2 BULK AIR COMPRESSOR SURGE TANKS.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
REPAIR AND TEST PURGE AIR ALARM.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
PROVIDE LOG ENTRY (COPY) OF AN OPERATIONAL TEST OF THE PORT AND STARBOARD LIFE CAPSULE (RELEASE, OPERATE SPRINKLERS).
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
REPLACE MISSING INVENTORY IN THE PORT LIFEBOAT (HEAVING LINE, WHISTLE, KNIFE).
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
REPAIR OR REPLACE THE RANGE LIGHTS FOR NAVIGATION R-W-R.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
PROVIDE 12 HANDHELD, ROCKET PROPELLED, RED FLARES.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Unknown
Issued 8 September 1988
Resolved
PROVIDE POLLUTION CONTAINMENT ON THE PORT AND STARBOARD FUEL TRANSFER STATIONS.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Construction/Loadline
Issued 8 December 1987
Resolved
MAKE PORT SIDE HORIZONTAL TRUSS AND LOWER PORTION OF PORT SIDE CENTER VERTICAL COLUMN AVAILABLE FOR INSPECTION AT NEXT RIG MOVE.
Condition: Unknown
Due 8 December 1987
Resolved 8 December 1987
Unknown
Issued 1 September 1987
Resolved
VERIFY INDICATIONS FOUND BY THE EDDY CURRENT TEST BY USING ANOTHER RECOG- NIZED MEANS OF NDE/NDT ON THE PORT CAISSON AND THE STBD CAISSON AT THE CAISSON TO FOOTING WELDMENT/CONNECTION. ONCE CONFIRMED A REPAIR PROPOSAL IS TO BE SUBMITTED PRIOR TO DRILLING AT NEXT WELL FOR COAST GUARD APPROVAL.
Condition: Unknown
Due 1 September 1987
Resolved 1 September 1987
Unknown
Issued 1 September 1987
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 1 September 1987
Resolved 1 September 1987
Construction/Loadline
Issued 13 August 1987
Resolved
COMPLETE THE SPECIAL EXAM IN LIEU OF DRYDOCKING INCLUDING THE NON-DISTRUCTIVE TESTING OF HIGH STRESS AREAS AND THE COLUMN TO FOOT CONNECTION.
Condition: Unknown
Due 13 August 1987
Resolved 13 August 1987
Construction/Loadline
Issued 13 August 1987
Resolved
PAINT THE DRAFT MARKS AND THE LOADLINE IN A CONTRASTING COLOR TO THE HULL.
Condition: Unknown
Due 13 August 1987
Resolved 13 August 1987
Fire Fighting
Issued 9 September 1986
Resolved
PROVIDE 4 LB DRY CHEMICAL FIRE EXTINGUISHER ON FORKLIFR (B-I).
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Engineering
Issued 9 September 1986
Resolved
PROVIDE POP-OFF VALVE WITH HAND RELIEVING DEVICE ON AIR RECEIVER LOCATED IN CONTROL ROOM.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Electrical
Issued 9 September 1986
Resolved
PROPERLY TERMINATE OR REMOVE THE DEAD-END ELECTRICAL CABLES IN THE MUD PUMP ROOM, ALONG THE STARBOARD BULKHEAD, NEAR THE OVERHEAD; ALSO, REMOVE SHORT PIECE OF CUT ELECTRICAL CABLE FROM E45 FITTING ON OVERHEAD AND PROPERLY PLUG FITTING.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Deck/Cargo
Issued 9 September 1986
Resolved
PROVIDE PERSONNEL GUARD ON AIR TUGGER LOCATED ON THE MAIN DECK PORT SIDE FORWARD NEAR PUMP ROOM COLUMN.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Engineering
Issued 9 September 1986
Resolved
PROVE PROPER OPERATION OF THE LOW LUBE OIL ALARMS, ALL EMD'S.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Engineering
Issued 9 September 1986
Resolved
CLEAN AND CONDUCT NDT TESTING ON THE SEVERELY DETERIORATED AREA OF THE PRESSURE VESSEL SUPPLYING AIR TO THE FUEL OIL CONTROL VALVES OR CLEAN SUSPECTED AREA AND HYDROSTATIC TEST TO 150% OF THE MAWP. OR REPLACE THE SAME.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Construction/Loadline
Issued 9 September 1986
Resolved
PROVE PROPER OPERATION OF THE INDICATOR LAMPS FOR TANKS P1 & P5, PORT PUMP ROOM.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Construction/Loadline
Issued 9 September 1986
Resolved
MAKE OPERABLE VALVE 55, STARBOARD PUMP ROOM.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Construction/Loadline
Issued 9 September 1986
Resolved
REPAIR/REPLACE HYDROLIC PRESSURE GAUGE, FOR THE STARBOARD PUMP ROOM (CONTROLROOM).
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Engineering
Issued 9 September 1986
Resolved
PROVE PROPER OPERATION ON THE EMD ALARM LIGHTS, OVERHEAD ROTATING LIGHTS.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Construction/Loadline
Issued 9 September 1986
Resolved
PROVIDE CHECK VALVE TOP FLANGE TO BODY WITH BOLTS OF SUFFICIENT LENGTH TO PROVIDE PROPER HOLDING TORQUE.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Construction/Loadline
Issued 9 September 1986
Resolved
REPACK AS NECESSARY #2 BALLAST PUMP, AFT PUMP ROOM.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Construction/Loadline
Issued 9 September 1986
Resolved
PROVE PROPER OPERATION OF THE INDICATOR LAMPS FOR VALVES A1, FLOODING VALVE, MAIN SEACHEST MAINFOLD AND SEACHEST SUCTION #1 AFT PUMP ROOM.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Construction/Loadline
Issued 9 September 1986
Resolved
PROVE CLEAR FLOW THROUGH HIGH SEACHEST SUCTION, AFT PUMP ROOM.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Electrical
Issued 9 September 1986
Resolved
PROPERLY SUPPORT ELECTRICAL CABLE FROM FAN IN THE SHAKER AREA. SUPPORT CLIPS HAVE WASTED AWAY.
Condition: Unknown
Due 9 September 1986
Resolved 9 September 1986
Deck/Cargo
Issued 14 December 1984
Resolved
CONDUCT INTERNAL EXAM OR HYDROSTATICALLY TEST PRESSURE VESSELS AS FOLLOWS: BOTH AIR RECEIVERS IN AIR COMPRESSOR ROOM; ONE(1) AIR RECEIVER UNDER DRILL FLOOR; AND FOUR(4) BULK CHEMICAL TANKS.
Condition: Unknown
Due 14 December 1984
Resolved 14 December 1984
Electrical
Issued 14 December 1984
Resolved
PERFORM REVERSE POWER TEST FOR ALL THREE(3) GENERATORS AT NEXT DRYDOCK BUT NO LATER THAN 28FEB85.
Condition: Unknown
Due 14 December 1984
Resolved 14 December 1984
Construction/Loadline
Issued 14 December 1984
Resolved
MAKE AVAILABLE FOR INSPECTION THE UPPER AND LOWER SEA CHEST VALVES IN THE AFT, PORT AND STARBOARD PUMPROOMS.
Condition: Unknown
Due 14 December 1984
Resolved 14 December 1984
Construction/Loadline
Issued 14 December 1984
Resolved
REINSTALL THE QUICK-ACTING CLOSURE DEVICE ON THE GAS TIGHT DOOR BETWEEN THEMUD PIT ROOM AND SACK STOREROOM AND MAKE THE DOOR SELF-CLOSING.
Condition: Unknown
Due 14 December 1984
Resolved 14 December 1984
Accommodation/Occupational Safety
Issued 14 December 1984
Resolved
INSTALL A SUITABLE CLOSURE IN WAY OF THE HEAD EXHAUST FAN FOR THE LOWER LEVEL OF THE QUARTERS HOUSE.
Condition: Unknown
Due 14 December 1984
Resolved 14 December 1984
Lifesaving
Issued 7 September 1984
Resolved
REPAIR OR REPLACE #2 STARBOARD CAPSULE UPON INSTALLATION, CONDUCT WEIGHT TEST AND INVENTORY OF EQUIPMENT IN PRESENCE OF CG INSPECTOR. UNTIL CAPSULE IS REPLACED OR REPAIRED TO SERVICABLE CONDITION, A STANDBY BOAT SHALL BE PROVIDED.
Condition: Unknown
Due 7 September 1984
Resolved 7 September 1984
Electrical
Issued 7 September 1984
Resolved
PERFORM REVERSE POWER TESTS FOR ALL THREE (3) GENERTORS AT NEXT DRYDOCK BUT NOT LATER THAN 30NOV84.
Condition: Unknown
Due 7 September 1984
Resolved 7 September 1984
Lifesaving
Issued 7 September 1984
Resolved
PROVIDE ADEQUATE COVERAGE FOR GEN. ALARM WARNING SIGNAL IN AREA OUTBOARD OF #3 GENERATOR WITHIN SEVEN (7) DAYS.
Condition: Unknown
Due 7 September 1984
Resolved 7 September 1984
Lifesaving
Issued 7 September 1984
Resolved
CONDUCT ANNUAL SERVICING OF ALL DAVIT LAUNCHED LIFERAFTS(4 TOTAL) AND HYRAULIC RELEASE HOOKS (2) WITHIN THIRTY (30) DAYS.
Condition: Unknown
Due 7 September 1984
Resolved 7 September 1984
Lifesaving
Issued 7 September 1984
Resolved
PROVIDE FOUR (4) ADDITIONAL LIFE PRESERVERS WITH REQUIRED EQUIPMENT AND REPLACE WHISTLES ON FIVE (5) OTHER LIFE PRESEVERS TO MEET 125% OF COMPLEMENT WITHIN TWENTY-FOUR (24) HOURS.
Condition: Unknown
Due 7 September 1984
Resolved 7 September 1984
Lifesaving
Issued 7 September 1984
Resolved
PROCURE TWO (2) SERVICE PROJECTILES AND ONE (1) AUX. LINE (500') AS REQUIR-ED BY 46 CFR 160.031-4 WITHIN FOURTEEN (14) DAYS.
Condition: Unknown
Due 7 September 1984
Resolved 7 September 1984
Fire Fighting
Issued 7 September 1984
Resolved
INSTALL A REMOTE ENCLOSED PULL STATION FOR CO2 EXT. SYSTEM PROTECTING PAINTLOCKER AS REQUIRED BY 46 CFR 108.443 WITHIN FOURTEEN (14) DAYS.
Condition: Unknown
Due 7 September 1984
Resolved 7 September 1984
Fire Fighting
Issued 7 September 1984
Resolved
PROVIDE ORIGINAL CG APPROVAL LETTER DATED 11OCT83 FOR HALON SYSTEM AND PLACE ON BOARD RIG WITHIN TWENTY-ONE (21) DAYS.
Condition: Unknown
Due 7 September 1984
Resolved 7 September 1984
Fire Fighting
Issued 7 September 1984
Resolved
RESERVICE ONE (1) SCBA OXYGEN BOTTLE TO SERVICABLE LIMITS WITHIN TWENTY-ONE(21) DAYS.
Condition: Unknown
Due 7 September 1984
Resolved 7 September 1984
Fire Fighting
Issued 30 August 1982
Resolved
FIRE FIGHTING DETAILS
Condition: Unknown
Due 30 November 1982
Resolved 30 August 1982
Electrical
Issued 30 August 1982
Resolved
GENERAL ELECTRICAL SYSTEMS AND RELATED EQUIPMENT
Condition: Unknown
Due 30 November 1982
Resolved 30 August 1982
Construction/Loadline
Issued 30 August 1982
Resolved
BALLAST AND BILGE SYSTEM
Condition: Unknown
Due 30 November 1982
Resolved 30 August 1982