Records from 2016 to 2026. Most recent: inspection, 11 April 2026.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 5 March 2026
Resolved
Remote stations required outside the protected space for Fixed CO2 installations. The Nitrogen cylinders in the remote pull box for the bow thruster not connected and hoses IVO the pilot cylinders wasted. System recently serviced and not placed back in an operable condition.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2026
Resolution: Verified system was properly connected.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 5 March 2026
Resolved
Vessels over 200 GT and operating outside the boundary line must be manned with crew that meet STCW. Medical certificate STCW expired for 2 Mates and Security Duties VI/6 and RFPNW II/4 for an AB.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2026
Resolution: Verified crew Medical certificates and endorsements.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 5 March 2026
Resolved
Each cargo vessel must carry a rescue boat approved under approval series 160.156. Rescue boat did not have Coast Guard type approval.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2026
Resolution: Verified Rescue boat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 5 March 2026
Resolved
Where pipes are carried through watertight bulkheads, the integrity of the structure shall be maintained. Hydraulic lines passing through bulkhead adjacent to moon pool room door are not welded to surrounding structure allowing water ingress.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2026
Resolution: Verified bulkhead penetration.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 5 March 2026
Resolved
Watertight bulkhead cable penetrations are required to be watertight. Cable passages above Sat tech door entrance, above galley entrance, and bridge mast cables transits are not watertight and have improper cable installations.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2026
Resolution: Verified penetrations.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 March 2026
Resolved
There must be at least two means of escape from all general areas. Aft steering station STBD WTD is not operable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2026
Resolution: STBD WTD operable.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Shore - Ship
Issued 5 March 2026
Resolved
Vessel Owners must ensure implementation of security measures to control access to vessels. Several doors on board vessel did not have access control locks installed for locking internally.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2026
Resolution: Verified doors were able to be locked for access control.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 5 March 2026
Resolved
Each power ventilation system that is not machinery space ventilation must have a control stop. Ventilation damper controls were not clearly marked or controllable to determine if in on or off position and did not clearly label location serviced.
Changed from a 17c to a 50c on 10MAR2026.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2026
Resolved 30 March 2026
Resolution: Switches were replaced and video evidence was provided to satisfy the requirement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 5 March 2026
Resolved
Vessels shall be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment. (02) bilge suction tests failed during inspection. USCG must witness proper operation of all bilge suctions on board.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2026
Resolution: Verified operation.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 March 2026
Resolved
Oil strainers and other equipment subject to normal oil leakage must be fitted with drip pans or other means to prevent oil draining into the bilge. Port Generator was missing fuel filter drip tray.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2026
Resolution: Drip pans installed.
08 - Alarms › N/A - No Subsystem › Emergency signal
Issued 5 March 2026
Resolved
Visual alarms at a control location that are summarized or grouped by function, system, or item of equipment must be sufficiently specific to allow any necessary action to be taken and have a display at the appropriate control location to identify the specific alarm condition or location. The bilge alarm panel on the bridge has summary alarms that do not specify which bilge alarm and location is alerting high level.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2026
Resolved 30 March 2026
Resolution: Bilge alarms were separated on the bridge to show each space in alarm state individually.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 5 March 2026
Resolved
Remote valve controls must be fitted with nameplates describing the applicable system. Valves located at the bilge and fuel manifolds were missing nameplates.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2026
Resolved 10 March 2026
Resolution: Name plates installed.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 5 March 2026
Resolved
The marine employers established program for random drug testing is through a consortium (DISA). The letter from DISA stating they are a member was dated 2020.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2026
Resolved 10 March 2026
Resolution: Provided updated DISA letter.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 5 March 2026
Resolved
Indication of the rudder angle must be provided both at the pilot house and steering compartment. RAI at the pilot house and steering compartment did match.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2026
Resolved 10 March 2026
Resolution: Verifed angle indicators.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 December 2025
Resolved
At each inspection for certification and at other such times as considered necessary the inspector shall determine that all fire-extinguishing equipment is in suitable condition. The fire main is cracked at the sea strainer and is not serviceable.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Strainer was replaced in kind, and pressure tested at the operational pressure.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 5 December 2025
Resolved
Where pipes are carried through watertight bulkheads, the integrity of the structure shall be maintained. The ballast pipe in the steering gear room leading to the aft peak ballast tank was wasted and leaking. Evaluate piping in the forepeak by means of gauging.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Pipe was replaced in kind and pressure tested.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 5 December 2025
Resolved
Discharges led through the shell from spaces below the freeboard deck shall be fitted with efficient and accessible means for preventing water from passing inboard. An overboard pipe in the forepeak was found wasted and reported to be no longer in use by vessel personnel. Remove, evaluate hull in vicinity of pipe, and submit repair proposal.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Pipe was removed and blanked off. Hull was in satisfactory condition.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 5 December 2025
Resolved
Exposed hatches must be secured and made watertight before leaving protected waters. Back deck hatch fitted
with non-watertight gasket.
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: The engine room escape trunk was cmopletely replace. All gaskets were verified as watertight type.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 5 December 2025
Resolved
Alterations and repairs to inspected vessels must be done under the direction of the Officer in Charge, Marine Inspection and in accordance with the regulations in this subchapter, to the extent practicable. A soft patch was identified in the engine room under the port shaft. All softpatches shall be removed an cropped and renewed.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Soft patch areas were removed from multiple tanks. See DDE Worklist. Cropped, renewed and pressure tested.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 5 December 2025
Resolved
If during an internal exam deterioration to structural members is observed, OCMI may require vessel to be dry docked. Observed leakage at both rudder post, evaluate and determine cause of leakage.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Rudder posts and journals were run out, machined and corrected. Watertight after hull splash. Conducted e-steering test with no leakage.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 December 2025
Resolved
Electrical equipment should be protected from accumulation of oil. Main switchboard had oil dripping from interior observed by marine inspector. Exterior was freshly cleaned with signs of oil leakage from the inside. Determine source of oil ingress into switchboard and remove all oil residues.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Source of oil ingress is open bottom and large vent fans blowing into the switchboard due to overheating problems. Space ventilation was increased, exhaust blanketing was doubled, and vent fans were added to upper portions of the boards.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 December 2025
Resolved
Watertight bulkhead cable penetrations required to be watertight. Cable penetration above engine room entrance were not watertight.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Penetrations were sealed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 December 2025
Resolved
No repairs or alterations affecting the safety of a vessel shall be made without the knowledge of the Officer in Charge of Marine Inspection. Deck generator installed to supplement power for saturation generator with no plan approval or notification to the [name withheld] saturation generator to service and remove temporary installation or submit plan review.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Sat gen was overhauled and brought back into service. Operationally tested with limited available load.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 December 2025
Resolved
Electrical installations shall be such that services essential for safety will be maintained and safety assured for the crew from electrical hazards. Main switchboard requires opening to conduct routine operations on exposing crew members to electrical shock hazards. Make panel closure safe to ensure opening is not required for operation of gen and while energized.
Condition: Design Flaw
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Changes to the space should prevent overheating, thus prevent the switchboard for being open during normal operations.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 December 2025
Resolved
Switches and circuit breakers, so far as practicable, shall be readily accessible shall be grouped. Throughout the vessel, circuit breakers were obstructed by various vessel equipment stores, parts & dive equipment.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2026
Resolved 2 March 2026
Resolution: Dive equipment was all removed and reorganized. will need continual monitoring to ensure dive equipment doesn't pile up.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 5 December 2025
Resolved
Each separate discharge shall have one automatic nonreturn valve with a positive means of closing it from a position above the freeboard deck. The valves located in the void adjacent to the MSD are missing
the reach rod.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2026
Resolved 2 March 2026
Resolution: MSD reach rod added.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 5 December 2025
Resolved
No person may operate any vessel equipped with installed toilet facilities unless it is equipped with an operable Type II device that has a label on it under 159.16 or that is certified under 159.12 or 159.12a. The Type II MSD onboard is inoperable.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: MSD replaced with two Ahead/behind systems.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 5 December 2025
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. The dryer vent led to a 5-gallon bucket causing a potential fire hazard.
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Hazardous arrangement was replaced with an appropriate lint trap and screen.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 December 2025
Resolved
Where cables pass through watertight decks a water tight stuffing tube shall be employed. Deck opening for temporary generator wire installation not properly sealed.
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Transit was capped and sealed after the generator was removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 December 2025
Resolved
Where cables are run in groups they shall be supported in metal hangers. Temporary generator cables were supported improperly with plastic and fiber.
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 2 March 2026
Resolution: Cables were removed when the extra generator was removed from the deck.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 2 July 2025
Resolved
Oil piping drains, strainers, and other equipment subject to normal oil leakage must be fitted with drip pans or other means to prevent oil draining into the bilge. Fuel filters (both generators & MDEs) were not fitted with drip pans.
46 CFR 90.20-1 (OLD I)
46 CFR 56.50-60(k)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2025
Resolved 1 August 2025
Resolution: Vessel installed drip pans underneath RACORs.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 2 July 2025
Resolved
Nothing in this subpart shall limit the inspector from making tests/inspections as deemed necessary to assure the seaworthiness of the vessel. On the STDB MDE the port pump on the reduction gear was found to have a slow leak.
46 CFR 91.27-15 (OLD I)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2025
Resolved 1 August 2025
Resolution: Repaired seal and stopped the leak.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 2 July 2025
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery, etc. Port generator did not have guard in place over for rotating parts.
46 CFR 92.25-15 (OLD I)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2025
Resolved 1 August 2025
Resolution: Rotating guards put into place.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 2 July 2025
Resolved
All electric cable installed in conjunction with the smoke detector system shall be either leaded and armored, sheathed and armored, or mineral insulated metal sheathed. Smoke detector within forward thruster space (near MSD) had spliced cable.
46 CFR 90.25-1 (OLD I)
46 CFR 113.70-5 (OLD, OLD J)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2025
Resolved 1 August 2025
Resolution: Juction box installed and reterminated the wire.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 July 2025
Resolved
PSTPs must be in a step-by-step or checkoff format specifying equipment status, the apparatus necessary to perform tests, safety precautions, safety control and alarm set-points, the procedure to follow, and the expected test result. Vessel could not produce PSTPs for testing the overspeed devices on the ship service diesel generators (SSDG). Crew/ third party consulted the SSDG manual and were able to satisfactorily test the overspeed devices. Amend vessel PSTPs to include procedures for testing over speed devices on SSDGs and submit the amended procedures to MSC for approval.
46 CFR 90.20-1 (OLD I)
46 CFR 61.40-10 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2025
Resolved 1 August 2025
Resolution: Amending PSTPs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 July 2025
Resolved
All electrical equipment exposed to the weather or located in spaces where they would be exposed to seas, splashing, or other severe moisture conditions, shall be of the watertight type or protected by means of watertight enclosers… Vessel had multiple electrical outlets that were missing covers on main deck, one in the bow thruster room, and one the in Emergency Generator Room.
46 CFR 111.05-20 (Old-Old J)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2025
Resolved 1 August 2025
Resolution: Installed new covers on all exposed outlets.
09 - Working and Living Conditions › 091 - Living Conditions › Galley, handlingroom (maintenance)
Issued 2 July 2025
Resolved
Nothing in the subpart shall limit the inspector from making tests or inspections deemed necessary assure the safety and seaworthiness of the vessel. Vessel’s kitchen had large crack in the floor in front of the stove and deep fat fryer that is a trip hazard.
46 CFR 91.25-50 (Old-I)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2025
Resolved 1 August 2025
Resolution: Installed a mat over the crack until the floring can be repaired while in drydock.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 July 2025
Resolved
Electrical equipment exposed to the weather or in spaces where it would be exposed to seas, splashing, or other severe moisture conditions, shall be of the watertight type or protected by means of watertight enclosure. Vessel had multiple electrical wires that did not end in a junction or were loose (Emergency Stop Deck Fuel) and were rotten with wires exposed on FWD STBD PVHO.
46 CFR 111.05-20 (Old-Old J)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2025
Resolved 1 August 2025
Resolution: Repaired all electrical componets
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 2 July 2025
Resolved
Main steering gear and rudder stock must be adequate strength for and capable of steering the vessel at maximum ahead service speed. The starboard rudder stock packing was found excessively leaking water into the bilge. The rudder packing was adjusted to minimize leaking. Pull starboard rudder and assess prior to next drydock credit. 705 – Verify at next DD/ISE.
46 CFR 90.20-1 (OLD I)
46 CFR 58.25-10
Action required: 705 - Other - as specified
Due 2 July 2025
Resolved 5 March 2026
Resolution: Rudders pulled during 2026 dry-dock.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 July 2025
Resolved
Where cables are run-in groups they shall be supported in metal hangers. A cable runs in the bow thruster space was held up by line. Crew replaced with metal hanger.
46 CFR 90.25-1 (OLD I)
46 CFR 113.60-25 (OLD, OLD J)
Action required: 10 - Deficiency Rectified
Due 2 July 2025
Resolved 2 July 2025
Resolution: Crew replaced with metal hanger.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 16 January 2025
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs...The survey shall be such as to ensure that the necessary repairs or renewals have been effectively made. Vessel requires a post grounding damage survey.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 February 2025
Resolved 31 January 2025
Resolution: No damage sustained.
01 - Certificates & Documentation › 013 - Documents › Tables of working hours
Issued 4 April 2024
Resolved
Records of daily rest must be maintained onboard the vessel; vessel did not have STCW work-rest logs. To be cleared at next topside.
46 CFR 15.1111(g)
Action required: 705 - Other - as specified
Due 4 April 2025
Resolved 2 July 2025
Resolution: Verified workrest hours being kept.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 4 April 2024
Resolved
Rescue boat release gear must be operationally tested under load of 1.1 times the total mass of the lifeboat at least once every five years or whenever overhauled; vessel had not completed a load test in the past 6 years.
46 CFR 199.190(i)
Action required: 10 - Deficiency Rectified
Resolved 5 April 2024
Resolution: Load test complete.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 4 April 2024
Resolved
All persons employed on board vessels subject to STCW must hold a medical certificate; Chief engineers STCW medical certificate was expired.
46 CFR 15.1103 (h)
Action required: 10 - Deficiency Rectified
Resolved 4 April 2024
Resolution: Submitted for medical.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 April 2024
Resolved
Each panelboard must have a circuit directory that has a description of the load of each circuit; load was not labeled on any distribution panel.
46 CFR 111.40-11
(Subchapter "J" Mid)
Action required: 10 - Deficiency Rectified
Resolved 4 April 2024
Resolution: Labels added.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 4 April 2024
Resolved
The number of persons for which the rescue boat is equipped must be clearly marked, preferably on the bow, in permanent characters; rescue boat did not have the persons marked.
46 CFR 199.176 (a)
Action required: 10 - Deficiency Rectified
Resolved 4 April 2024
Resolution: Rescue boat marked.
05 - Radio Communications › N/A - No Subsystem › Operation of GMDSS equipment
Issued 16 February 2022
Resolved
Radio equipment required must be maintained to provide the availability of the functional requirements and performance standards. GMDSS was inoperable and not appropriately logged.
47 CFR 80.1105(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 June 2022
Resolution: Installed new operational GMDSS.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 February 2022
Resolved
Main steering gear and rudder stock must be adequate strength for and capable of steering the vessel at maximum ahead service speed. Rudder stock excessive leakage of water and moving erratically.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 February 2022
Resolution: Witnessed repaired rudder stock with no more leakage and excessive movement.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 February 2022
Resolved
Portable extinguishers must be inspected and maintained IAW NFPA 10. Portable extinguisher hose located at the welding space was dry rotted.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 February 2022
Resolution: Replaced with a new extinguisher.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 February 2022
Resolved
Emergency power source must meet table 122.05-5(a) and have the capacity to supply all loads that are simultaneously connected to it. Emergency generator did emergency lighting in the engine room.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 February 2022
Resolution: Witnessed E generator operate; satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 16 February 2022
Resolved
Each self-propelled vessel must be provided with a power-driven pump or pumps connected to the bilge main as required by table 56.50-55(a). 02 submersible unapproved bilge pumps were installed.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 February 2022
Resolution: Vessel removed 02 unapproved portable bilge pumps.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 16 February 2022
Resolved
Each Class 1 door on a vessel in ocean service must be designed to withstand a head of water equivalent to the depth from the sill of the door to the margin line. 02 watertight doors were not watertight due to deteriorated gaskets.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 February 2022
Resolution: Installed new gasket to the watertight door.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 16 February 2022
Resolved
All bilge pipes used in machinery spaces shall be steel or other acceptable material. Identified soft patch on the main bilge piping.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 February 2022
Resolution: Vessel removed soft patch on the piping.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 16 February 2022
Resolved
Electrical installations on vessel must ensure maintenance of services necessary for safety under normal and emergency conditions. Identified a hole on the saturation generator crank case.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 8 June 2022
Resolution: Installed new sat generator that is operational.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 February 2022
Resolved
If the annual inspection reveals deficiencies in your vessel's maintenance, you must make any or all repairs or improvements with the time period specified by [name withheld] seal for stbd and port tailshaft was not secured and identified leakage of water.
46 CFR 91.27-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 February 2022
Resolution: Secured shaft leakage.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 29 January 2021
Resolved
Watertight hatch leading to engine room not easily operable by crew; requires adjustment to ensure crew passage and remain watertight IAW loadline requirements.
Cite: 46CFR 42.15
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 January 2021
Resolved 1 February 2021
Resolution: Watertight door leading to engine room had been adjusted; crew had ground down plates to ensure dogs secured appropriately to ensure watertight integrity and door was more easily operable.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 January 2021
Resolved
Several fuel hoses in the engine room are not of approved type or are leaking. Flexible hoses shall be SAE J 1942 approved type or equivalent. (01) STBD SSDG, (01) Port SSDG, (02) Dive Gen, (2) Bow Thruster.
Cite: 46CFR 56.60-25
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 January 2021
Resolved 1 February 2021
Resolution: Fuel hoses as noted in CG-835 were replaced appropriately.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 29 January 2021
Resolved
Approved automatic fire detection and alarm system must be provided to monitor all machinery spaces. (03) Smoke alarms in the rudder room and (02) heat detectors in above the Port MDE were inoperable when tested; all alarms and detectors must be made operable.
Cite: 46 CFR 62.50-20
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 29 January 2021
Resolved 1 February 2021
Resolution: Completed satisfactory operational test of deficient smoke alarms and heat detectors.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 January 2021
Resolved
Vsl shall maintain a lockout/tagout log IAW OSHA regs. VSL had items locked out and tagged out but not keeping a log for items on the vsl; correct and make log entries as appropriate.
Cite: 29 CFR 1910.147
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2021
Resolved 1 February 2021
Resolution: Vessel Master and Engineer presented satisfactory lockout/tagout log displaying proper entries for OOC gen set in engine room. Breaker tagged out appropriately, and local equipment properly disconnected from start air, fuel, and power.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 29 January 2021
Resolved
Equipment onboard shall be inspected to ensure equipment fully complies with regulations and are IAW vsl plans; rudder packing requires adjusting on both rudders to minimize leaking and ensure integrity of vsl and its equipment.
Cite: 46 CFR 91.20-15
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2021
Resolved 1 February 2021
Resolution: Rudder post packing had been adjusted and greased to ensure excessive leaking was secured.
08 - Alarms › N/A - No Subsystem › Engineers' alarm
Issued 29 January 2021
Resolved
Periodic safety test procedures (PSTP) documents must be in a step-by-step or checkoff list format specifying equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm set-points, the procedure to be followed, and the expected test result. Vessel's PSTPs were not being followed by third-party servicers, and PSTPs themselves have not been updated to reflect equipment currently installed onboard. PTSPs must be reviewed to include all pertinent equipment installed onboard, and any third party servicers must perform equipment tests IAW approved PSTPs.
Cite: 46 CFR 62.40-10 (a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 January 2022
Resolved 27 February 2023
Resolution: PSTP updated and tests performed IAW them.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 January 2021
Resolved
Electrical installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. Shore tie cable connection contacts were insufficiently protected to prevent electrical hazard; vsl must provide protection to ensure shore tie cable contacts do not present hazard.
46 CFR 111.01-( a ) (2)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 February 2021
Resolved 1 February 2021
Resolution: Shore tie cable was provided appropriate enclosure to guard against electrical hazard.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 27 October 2020
Resolved
Each vessel, in salt water service, must undergo a drydock and ISE twice in five years, not exceeding three years between any two examinations. Vessel due for DD & ISE on 31 OCT 2020. Vessel completing job offshore, delayed due to severe weather, extension of DD & ISE extened to 7 NOV 2020.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2020
Resolved 23 November 2020
Resolution: VSL completed examination
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 21 November 2018
Resolved
Vessel found with crack in E/R forward bulkhead. Conduct repairs to the satisfaction of attending CGMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 November 2018
Resolution: CG [name withheld] MADE AT SHIPYARD.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 November 2018
Resolved
Electrical installations must ensure maintenance of services necessary for safety under normal conditions. Vessel found with reverse power condition on #2 SSDG.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: CG [name withheld] MADE.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 November 2018
Resolved
E/R distribution panel missing guard. Replace guard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: CG [name withheld].
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 November 2018
Resolved
Miltiple electrical hazards found in control van; extension cords ran for permenant use, spaces heaters presenting fire hazard, daisy chain of surge protectors. Remove all hazards and install additional outlets as necessary.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: CG [name withheld].
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 November 2018
Resolved
All piping systems must be maintained for safe and efficient operation. Port SSDG found with fuel leaking from flow control.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 November 2018
Resolved
Sat dive generator found with non-approved non-metallic hoses. Replace with SAE J 1942 standard hoses.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO SATISFACTION OF ATTENDING CG MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 November 2018
Resolved
Fuel oil return hose on bow thruster engine found severly detoriorated. Replace with SAE J 1942 hoses.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 21 November 2018
Resolved
Each class 1 WTD on a vessel in ocean service must be capable of withstanding a head of water. Aft E/R door and forward E/R door need adjustment to be watertight.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 November 2018
Resolved
Port generator has an exhaust leak in E/R passage near bow thruster prime mover. Repair to origninal condition.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 21 November 2018
Resolved
Six freeing ports on deck were not opening freely. Repair to origninal.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 21 November 2018
Resolved
WTD in passagway FWD did not seal properly. Ensure door is adjusted to attain proper seal.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 21 November 2018
Resolved
Expired medication in first aid kit. Remove and replace expired mediations.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 November 2018
Resolved
Overspeed shutdowns for main diesel engines not operating. Ensure shutdowns are operating as required.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 21 November 2018
Resolved
Toilet leaking at basse in hospital space. Toilet is secured. Repiar to original.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 November 2018
Resolved
Electrical arch coming from frayed cable on rescue boat davit. Electrician on board replaced w/new cable on the spot.
Action required: 10 - Deficiency Rectified
Resolved 21 November 2018
Resolution: CORRECTED ON THE SPOT
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 21 November 2018
Resolved
Stress cracks noted at base of rescue boat davit after load test. Complete non-destructive testing and repair to origninal in accordance with test results.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 21 November 2018
Resolved
Crack found in fiberglass on STBD aft corner of rescue boat. Repair to original.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 21 November 2018
Resolved
Lube oil pressure switches have unapproved hoses installed. Provide approve hoses and replace existing hoses.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 December 2018
Resolution: REPAIRS MADE TO THE SATISFACTION OF ATTENDING CG MI.
Stability › Watertight Integrity › General
Issued 4 January 2018
Resolved
Emergency escape hatch in engine room was not watertight and needs to be adjusted. Provide properly functioning watertight hatch.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 January 2018
Lifesaving › Rescue Boat › Stability
Issued 4 January 2018
Resolved
Vessel rescue boat was missing sidelights and the all around light does not function. In addition, the righting handles on the forward portion of the boat are damaged. Provide sidelights and properly functioning all around light. Provide properly functioning righting handles.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 5 January 2018
Lifesaving › Lifebuoys › Size
Issued 3 January 2018
Resolved
The 02 lifebuoys on the bridge wings were not the approved bridge buoys. Provide 02 bridge buoys.
Condition: Invalid
Action required: 705 - Other - as specified
Due 5 February 2018
Resolved 5 January 2018
Stability › Watertight Integrity › General
Issued 3 January 2018
Resolved
Numerous watertight doors throughout the vessel did not function properly. Provide properly functioning watertight doors throughout vessel.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 January 2018
Fire Fighting › Fire Hoses › Condition
Issued 3 January 2018
Resolved
Found 01 wasted fire hose. Provide adequate fire house.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 January 2018
Fire Fighting › Portable CO2 Fire Extinguisher › Discharge Hose/Tube
Issued 3 January 2018
Resolved
Portable extinguisher in engine room found with wasted hose. Provide functioning extinguisher.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 January 2018
Fire Fighting › Structural Fire Protection - General › Cooking Area
Issued 3 January 2018
Resolved
Fire door to galley did not close automatically. Provide properly functioning fire door and replace gasket.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 January 2018
Electrical › Electrical Distribution System (service) › Junction Box
Issued 3 January 2018
Resolved
Numerous power strips were found throughout the vessel. Remove all powerstips.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 8 January 2018
Electrical › Electric Generation Source (service) › Power Requirement
Issued 3 January 2018
Resolved
Outlet next to sink in Chief Engineer stateroom was not a GFCI protected outlet. Provide GFCI protected outlet.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 January 2018
Resolved 8 January 2018
Lifesaving › Line-Throwing Appliances › Lines
Issued 3 January 2018
Resolved
Vessel was missing 1500ft auxilliary line. Provide auxilliary line.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 February 2018
Resolved 5 January 2018
Fire Fighting › Portable CO2 Fire Extinguisher › Discharge Hose/Tube
Issued 3 January 2018
Resolved
The CO2 extinguisher for the paint locker had a wasted hose. Provide functional CO2 extinguisher for paint locker.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 January 2018
Electrical › Electric Generation Source (service) › Number of Sources
Issued 16 December 2016
Resolved
Vessel's STBD SSDG is inoperable. Confirm proper operation prior to movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 December 2016
Resolution: Repairs were made to STBD SSDG. Generator was op-tested in presence of CG MI.
Engineering › Fuel Oil Service System › Piping
Issued 16 December 2016
Resolved
Numerous leaks on fuel oil transfer system manifold. Repair leaking connections and fittings prior to movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2016
Resolution: Vessel made proper repairs.
Engineering › Diesel Engine (propulsion-reduction gear) › Pump, High Pressure (fuel injection)
Issued 16 December 2016
Resolved
Numerous leaks on strainers for diesel fuel on bow thruster engine. Repair leaking connecctions and fitting prior to movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 December 2016
Resolution: Proper repairs were made to correct fuel leak from fuel strainers. Proper operation of fuel service system witnesed by CG MI.
Engineering › Diesel Engine (propulsion-reduction gear) › Pump, High Pressure (fuel injection)
Issued 16 December 2016
Resolved
Multiple fuel leaks on STBD SSDG. Correct leaks prior to movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2016
Resolution: Vessel made proper repairs.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 16 December 2016
Resolved
Lack of houskeeping practices in engine room present a fire hazard. Oil soaked rags, oil in bilges, switch board space used for storage. Correct prior to movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2016
Resolution: Vessel took appropriate actions to clean engineering spaces and remove fire hazards.
Lifesaving › Lifebuoys › Serviceable
Issued 16 December 2016
Resolved
Multiple lifebuoys found not in servicable condition. Repair or replace prior to movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2016
Resolution: Vessel purchased new ring lifebuoys.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 16 December 2016
Resolved
Portable extinguisher found severly deteriorated and in unservicable condition. Replace prior to movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2016
Resolution: Vessel purchased 02 new fire extinguishers.
Documentation › Markings/Placards › Warning Signs
Issued 16 December 2016
Resolved
Vessel had no warning signs for CO2 storage space. Provide satisfactory warning signs.
Due 23 December 2016
Resolved 21 December 2016
Resolution: Vessel placed appropriate warning signs in the CO2 storage room.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 16 December 2016
Resolved
03 outlet boxes found throughout the accomodation areas missing face plates. Replace face plates.
Due 23 December 2016
Resolved 21 December 2016
Resolution: Vessel installed covers on outlet boxes.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 16 December 2016
Resolved
Exhaust leaks discovered on jet pump prime mover. Fix exhaust leaks and repair damaged lagging/insulation.
Due 23 December 2016
Resolved 21 December 2016
Resolution: Vessel fixed exhause leaks and repaired lagging.
Accommodation/Occupational Safety › Other Accommodation Spaces › Laundry
Issued 16 December 2016
Resolved
Provide satisfactory means for capturing lint in port side laundry room.
Due 23 December 2016
Resolved 21 December 2016
Resolution: Vessel installed lint trap.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 December 2016
Resolved
Dead end wiring discovered in compressor room. Remove dead end wiring.
Due 23 December 2016
Resolved 21 December 2016
Resolution: Vessel removed dead end wires.
Engineering › Fuel Oil Service System › Filter
Issued 16 December 2016
Resolved
All racor fuel filters on board were fitted with acrylic bowls. Replace with metal bowls.
Due 30 December 2016
Resolved 22 December 2016
Resolution: All acrylic fuel system components were replaced with metallic components.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 13 April 2016
Resolved
Identified an exhaust leak on the Jet pump engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2016
Resolved 14 April 2016
Resolution: Gaskets replaced.
Construction/Loadline › Hull › Bottom Plating
Issued 8 April 2016
Resolved
C/R wasted section of bottom plating IWO temp repair. Notify Local OCMI of dry-dock location and dry-dock plan. Hull condition needs to be reevaluated, UT shots TBD by the USCG marine inspector and Vessel representative. Possible Marine Surveyor required.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2016
Resolved 14 April 2016
Resolution: Verified insert and welds satisfactory.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 8 April 2016
Resolved
Switchboard has 04 cutouts approximately 1.5 in. 02 forward and 02 aft, place covers/ louvers over cutouts.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2016
Resolved 14 April 2016
Resolution: Holes covered with louvers.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 8 April 2016
Resolved
Correct-Missing/Loose exhaust lagging on the dive saturation generator exhaust.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2016
Resolved 14 April 2016
Resolution: Insulation attached satisfactory.
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (air motor)
Issued 8 April 2016
Resolved
STBD MDE missing teeth repair/replace and prove satisfactory operation to attending USCG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2016
Resolved 14 April 2016
Resolution: Flywheel replaced.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 8 April 2016
Resolved
Vessel crew identified multiple unservicable fire extinguishers and service due. Provide service certificate to attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2016
Resolved 14 April 2016
Resolution: Verified fire extingushers were serviced.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 8 April 2016
Resolved
Identified a fuel oil vent bell was badly damaged, checked other vents and found multiple missing flame screens.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2016
Resolved 14 April 2016
Resolution: Bell welded and missing flame screens installed.
Lifesaving › Rescue Boat › Hull (rigid)
Issued 4 February 2016
Resolved
2 inch inset in frp hull on stbd hull. Submit repair proposal IAW OEM.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 4 July 2016
Resolved 14 April 2016
Resolution: Rescue Boat sent to SCHAT harding in New Iberia for repairs. Rescue boat back on vessel with satisfactory repairs.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 4 February 2016
Resolved
Secondary steering rudder angle indicator inop. Prior in secondary steering station use.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 5 February 2016
Resolution: Indicator replaced. Verified accuracy with pilot house.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 4 February 2016
Resolved
Crane load cell inop. Prior to use of crane.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 5 February 2016
Resolution: Miscommunication with Capt. only screen was replaced not load cell computer. Verified overload alarms in place and safety cut outs.
Engineering › Engine Controls (Electric/Electronic) › Actuator
Issued 4 February 2016
Resolved
PSTP needs to set and proven by Chief Engineer witnessed by attending MI
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 4 March 2016
Resolved 14 April 2016
Resolution: CG-835 signed off.
Lifesaving › Lifebuoys › Approval
Issued 4 February 2016
Resolved
Missing plud.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 February 2016
Resolved 5 February 2016
Resolution: New life ring installed