Records from 2003 to 2026. Most recent: inspection, 9 January 2026.
Inspection history · 83
9 January 2026
PSC A
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8293752
22 August 2025
In-Service Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8218412
6 January 2025
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8085887
27 December 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8051270
20 September 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8006554
2 August 2024
MTSA/ISPS Verification · Annual Inspection · ACP Annual Oversight
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7897583
6 May 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7907781
28 April 2024
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7903174
25 April 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7901918
24 April 2024
Liferaft Servicing
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7924388
25 January 2024
In-Service Inspection · ACP Additional Oversight – Risk Assessment
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7848860
27 November 2023
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7901912
29 August 2023
Deficiency Check · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7780419
19 July 2023
ACP Annual Oversight · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7747118
8 June 2023
In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7709265
8 June 2023
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7715738
1 May 2023
In-Service Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7679179
7 March 2023
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7647251
3 January 2023
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7615724
23 September 2022
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7565213
24 August 2022
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7542726
27 May 2022
ACP COI Oversight · Re-Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7452877
13 May 2022
ACP Additional Oversight – Risk Assessment
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7457650
16 April 2022
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7432129
16 April 2022
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7595819
11 April 2022
Annual Inspection · Administrative Inspection · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7435488
25 February 2022
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7402250
28 October 2021
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7342203
2 September 2021
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7302420
10 August 2021
Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7282954
12 April 2021
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7173491
24 March 2021
ACP Drydock Oversight
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7161732
25 November 2020
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7102257
20 November 2020
Administrative Inspection · Periodic Inspection · ACP Periodic Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7099227
17 November 2020
In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7102199
9 November 2020
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7097248
2 November 2020
Administrative Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7092399
19 May 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6956184
14 March 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6927613
13 December 2019
ACP Annual Oversight · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6866332
24 October 2019
ACP Additional Oversight – Risk Assessment
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6833046
21 October 2019
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6838427
23 August 2019
Underwater Inspection in lieu of Drydock
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6774937
16 May 2019
MARPOL Annex I Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6686456
21 February 2019
ACP Annual Oversight · ACP Additional Oversight – Risk Assessment · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6610566
14 February 2019
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6625968
29 January 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6617048
8 January 2019
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6608690
19 October 2018
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6564693
19 October 2018
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6567000
18 September 2018
Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6543573
23 August 2018
ACP Additional Oversight – Risk Assessment
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6534076
18 May 2018
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6416262
11 May 2018
Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6412240
11 May 2018
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6414401
1 March 2018
Examination of Repairs · Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6364034
28 February 2018
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6364982
27 February 2018
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6362965
26 February 2018
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6362062
22 February 2018
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6364007
1 February 2018
ACP Additional Oversight – Risk Assessment
Administrative · Commandant (CG-5P-TI) · Activity 6347873
29 December 2017
Re-Inspection · ACP COI Oversight · Administrative Inspection · MTSA/ISPS Verification
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6327708
27 December 2017
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6329553
22 December 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6328019
2 November 2017
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6297646
2 November 2017
Deficiency Check · ACP Additional Oversight – Risk Assessment · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6297884
30 October 2017
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6298020
24 October 2017
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6292013
12 October 2017
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6286715
24 August 2017
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6248880
12 June 2017
Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6188893
6 April 2017
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6121666
24 March 2017
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6096546
27 February 2017
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6095747
23 February 2017
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6093669
16 February 2017
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6090062
3 January 2017
Drydock Exam
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6041162
20 October 2016
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6048918
8 September 2016
ACP Periodic Oversight
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5995877
25 April 2016
Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5862327
21 April 2016
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5863378
17 March 2016
Administrative Inspection · ACP Annual Oversight · Deficiency Check · MTSA/ISPS Verification
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5836368
26 February 2016
Damage Survey · Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5822965
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 9 January 2026
Resolved
The Administration shall satisfy itself that the general structural strength of the hull is sufficient for the draught corresponding to the freeboard assigned. Ships built and maintained in conformity with the requirements of a classification society recognized by the Administration may be considered to possess adequate strength. PSCO observed excessive hull bending stresses as a result of the vessel's loading condition.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 January 2026
Resolution: PSCE observed BDNs and conducted soundings of all tanks.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 9 January 2026
Resolved
After any survey of the ship under Regulations 7,8,9 or 10 of this Chapter has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. PSCO observed missing closure device on steering gear access door.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2026
Resolution: Satisfactory report was provided and included in document's tab
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 9 January 2026
Resolved
In cargo ships lifeboats and liferafts shall be stowed to the satisfaction of the Administration. PSCO observed an improperly configured float free arrangements on all liferafts.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2026
Resolution: Deficiency corrected during the inspection in the presence of the PSCE.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 January 2026
Resolved
In all new and existing ships, fire-extinguishing appliances shall be kept in good order and available for immediate use at all times during the voyage. PSCO observed a missing fire extinguisher in the purifier space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2026
Resolution: PSCE observed fire extinguisher replaced during exam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 January 2026
No resolution recorded
After any survey of the ship under Regulations 7,8,9 or 10 of this Chapter has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. PSCO observed disconnected/damaged hand railing near the vessel's main engine.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 January 2026
No resolution recorded
After any survey of the ship under Regulations 7,8,9 or 10 of this Chapter has been completed, no change shall be made in the structural arrangements, machinery, equipment, etc. covered by the survey, without the sanction of the Administration. PSCO observed exhaust leak from auxiliary generator and No.1 ship service generator.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 9 January 2026
Resolved
Different groups of lifeboats shall be used in turn at successive boat drills...The musters and inspections shall be so arranged that the crew thoroughly understand and are practiced in the duties they have to perform. PSCO observed abandon ship drill in which crew failed to bring required survival equipment.
Action required: 10 - Deficiency Rectified
Resolved 9 January 2026
Resolution: PSCE re-ran satisfactory abandon ship drill
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 January 2026
Resolved
Main and emergency switch boards shall be arranged as to give easy access to back and front...There shall be non-conducting mats or gratings front and rear where necessary. PSCO observed missing non-conductive mat adjacent to main electrical switchboard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2026
Resolution: PSCE observed satisfactory report (added to document's tab).
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 27 December 2024
No resolution recorded
A self contained emergency source of power shall be provided. The electrical power available shall be sufficient to supply all those services that are essential for safety in an emergency. Vessel's EDG suffered catastrophic failure, resulting in complete loss of emergency electrical power.
60 SOLAS (20) II-1
Regulation 43.1.1 / 2
Condition: Invalid
Action required: 705 - Other - as specified
Due 27 February 2025 — due date passed with no resolution recorded
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 2 August 2024
Resolved
The safety-management system shall be maintained in accordance with the provisions of the International Safety Management Code. Every company should develop, implement, and maintain a SMS. The ship's SMS requirements as listed below are not being implemented or maintained:
"S-03-040, Rev. O Vessel USB Devices Usage Procedure.
3.1 Procedure 2- Auditing and Monitoring:
1. Has USB auto-run been disabled on Matson Owned systems?
2. Are blocks or locks intact and applied per plan."
USB terminals observed on computer systems on the ship's bridge without appropriate USB terminal blocks.
74SOLAS2020 IX/5
ISM Code 1.4
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2024
Resolved 29 August 2024
Resolution: Received documentation attesting to the rectification of deficiency.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 2 August 2024
Resolved
The safety-management system shall be maintained in accordance with the provisions of the International Safety Management Code. Every company should develop, implement, and maintain a SMS. The ship's SMS requirements as listed below are not being implemented or maintained:
S-03-040, Rev 0 Master [name withheld]
"5.1 Key Control The vessel's Master shall audit the system after each Master Turnover to ensure key accountability and prevent unauthorized access. The audits shall be logged in the master key logbook using Exhibit C - Master [name withheld]" Master was unable to provide records of Master key Audit or a Master key log iaw. vessel's SMS Master [name withheld]
74SOLAS2020 IX/5
ISM Code 1.4
Action required: 10 - Deficiency Rectified
Due 2 August 2024
Resolved 2 August 2024
Resolution: Master carried out required key audit and made first entry into the required log.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 2 August 2024
Resolved
The purpose of this Chapter is to require the fullest practicable degree of fire protection having regard to the type of ship and the potential fire hazard involved. Dampers for Engine Room supply fans #2 and #3 would not fully closed when operated.
74 SOLAS II-2/2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2024
Resolved 5 August 2024
Resolution: Accepted as a finding by RO
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 August 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or the persons onboard. MI observed leaks in the engine room in the following locations: OWS, Steam Condenser, #2 fresh water generator, and STBD steering gear pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2024
Resolved 5 August 2024
Resolution: Accepted as a finding by RO.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 6 May 2024
Resolved
On April 18, 2024 during a routine inspection of Ballast tank 3B-DB, HFO was found in 3B-DB. Further inspection of the tank found spidering cracks inside causing leakage. (a) No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Repairs must be made to ballast tank 3B-DB prior to May 27, 2024.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2024
Resolved 8 May 2024
Resolution: Corrected, class report uploaded.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 25 January 2024
Resolved
On U.S. inspected ships, oily water separating equipment and bilge alarms must be approved under 46 CFR 162.050. Content meters for the OWS digital display lights are not functioning as designed. Replace or repair both content meter units.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 12 February 2024
Resolution: Crew repaired and tested digital display for OWS. Test sat.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 25 January 2024
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Found 01 port side life-raft's hydrostatic release on upside down.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 25 January 2024
Resolved 25 January 2024
Resolution: Crew flipped hydrostatic release around, as designed.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 25 January 2024
Resolved
he purpose of this Chapter is to require the fullest practicable degree of fire protection, having regard to the type of ship and the potential fire hazard involved. Number 3 supply fan damper for engine room would not close all the way.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 25 January 2024
Resolved 25 January 2024
Resolution: Dampner was lubricated and retested satisfactory
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 August 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel's #1 ship service generator is inoperable due to a defective gear drive. Complete repair and provide report to satisfaction of Class and Coast Guard.
74 SOLAS (20) I/II
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2023
Resolved 5 September 2023
Resolution: Class report dated 30AUG23 provided detailed observations of damage and subsequent repairs.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 19 July 2023
Resolved
The purpose of this Chapter is to require the fullest practicable degree of fire protection, having regard to the type of ship and the potential fire hazard involved. Port engine room exhaust damper screen has excessive buildup of soot.
74 SOLAS (II-2/2)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2023
Resolved 21 July 2023
Resolution: Accepted by ABS as Finding No. 2507.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 19 July 2023
Resolved
Where penetrations of watertight bulkheads and internal decks are necesary for access, piping, ventilation, electrical cables etc., arrangements are to be made to maintain watertight integrity. Vessel's trash shoot hatch was corroded and unable to properly close.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2023
Resolved 20 July 2023
Resolution: Accepted by ABS as Finding No. 2508.
01 - Certificates & Documentation › 012 - Crew Certificates › Evidence of Basic Training
Issued 19 July 2023
Resolved
Onboard a seagoing vessel to which this subpart applies, no person may assign any person to perform shipboard duties, and no person may perform those duties, unless the person performing them has received— Sufficient familiarization training or instruction... Stocktender from the arriving voyage had no record of familiarization training. 46CFR15.1105(a)(2)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 July 2023
Resolution: Records provided for next embarked stocktended and ships procedures updated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 June 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During transit from berth, vessel experienced inability to increase service speed from dead-slow to slow, resulting in reduction of propulsion. Vessel is required to have repairs approved to the satisfaction of an attending CLASS surveyor prior to movement from anchorage.
74 SOLAS (20) I/II
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 June 2023
Resolution: No:08 lubricator unit was replaced with onboard spare. ABS attended and observed testing of all lubricator units. Recieved satisfactory report from attending Class (ABS) Surveyor.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 1 May 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Reflective tape on the top of port side lifeboat has worn and needs to be replaced. 74 SOLAS (20) I/11.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2023
Resolved 5 May 2023
Resolution: Accepted by ABS as finding 2468.0
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 1 May 2023
Resolved
A fireman’s outfit shall consist of: an electric safety lamp (hand lantern) of an approved type with a minimum burning period of three hours. Fireman’s outfit in the #2 gear locker found with inoperable flashlight (safety lamp/hand lantern). 74 SOLAS II-2/14(a)(iv)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2023
Resolved 5 May 2023
Resolution: Accepted as ABS Finding 2469.0
01 - Certificates & Documentation › 011 - Ships Certificates › Minimum Safe Manning Document
Issued 1 May 2023
Resolved
The manning requirements for a particular vessel are determined by the OCMI after consideration of the applicable laws, the regulations in this part, and all other factors involved, such as: emergency situations, size and type of vessel, installed equipment, proposed routes of operation including frequency of port calls, cargo carried, type of service in which employed, degree of automation, use of labor saving devices, and the organizational structure of the vessel. Vessel has open ABS finding 2448.3 for a malfunctioning engine room alarm repeater on bridge and is awaiting repairs. In the interim, vessel to maintain full engine room watch until alarm panel is repaired to the satisfaction of ABS. 46 CFR 15.501
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 May 2023
Resolved 8 June 2023
Resolution: Recieved satisfactory class report outlining components of fire detection/alarm system monitoring/control panels that were replaced. Additionally, satisfactory operational test of all equipment was performed to satisfaction of attending surveyor.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 1 May 2023
Resolved
Where “A” Class divisions are pierced for the passage of...ducts..., arrangements shall be made to ensure that fire resistance is not impaired. Fire damper in OS Locker on bridge has a fire damper access that has been blanked off and cannot be operated. 74 SOLAS II-2/23(a)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2023
Resolved 5 May 2023
Resolution: Accepted as finding by ABS 2471.0
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management Plan (BWMP)
Issued 1 May 2023
Resolved
The master, owner, operator, agent, or person in charge of any vessel equipped with ballast water tanks that operates in the waters of the United States must follow these practices: Maintain a ballast water management (BWM) plan that has been developed specifically for the vessel and that will allow those responsible for the plan's implementation to understand and follow the vessel's BWM strategy and comply with the requirements of this subpart. Vessel did not have correct BWM Plan onboard when called for by Marine Inspector. Vessel had old plan until approved one was found and presented while inspectors were onboard. Rectified on the spot. 33 CFR 151.2050(g)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 1 May 2023
14 - Pollution Prevention › 146 - MARPOL Annex VI › Sulphur oxides
Issued 25 February 2022
Resolved
The Administration of a Party may issue an exemption from specific provisions of this Annex for a ship to conduct trials for the development of ship emission reduction and control technologies. Vessel is currently operating under an exemption from MARPOL Annex VI Reg 14.4 issued by USCG and EPA. However, the vessel has submitted a modification to the exemption and is awaiting final approval. Vessel must obtain updated permit. Please note, vessel may be subject to fines under MARPOL Annex VI for alterations not covered under the existing exemption permit if operating within the waters, other than those under U. S. jurisdiction, of parties signatory to MARPOL Annex VI.
MARPOL 73/78 (2017 ed.)
Annex VI/Reg 3.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2022
Resolved 27 May 2022
Resolution: Verified new exemption permit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 September 2021
Resolved
Main and auxiliary machinery essential for the propulsion and safety of the ship shall be provided with effective means for its operation and control. Vessel's pilot house control for main engine not fully functional, unable to answer an astern bell.
Your vessel is prohibited from transiting any port within the Sector Honolulu COTP zone without the assistance from towing vessel(s) of adequate horsepower and maneuverability. Such towing vessel(s) shall be under the direction and control of an individual holding a Merchant Marine Credential (MMC) authorizing them to engage in assistance towing under the provisions of 46 CFR Part 11.482.
74 SOLAS II-2/31.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 September 2021
Resolution: Due to unavailability of spare parts( ie. Governor)& service technicians It is recommended the Main engine & controls systems, as proposed by owner, be examined &repaired, as found, during upcoming Lay berth repair period of 8-16 Sept 2021, Oakland, CA
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 March 2020
Resolved
Main and auxiliary machinery essential for the propulsion and safety of the ship shall be provided with effective means for its operation and control. Vessel's pilot house control for main engine not fully functional, unable to answer an astern bell.
Your vessel is prohibited from transiting any port within the Sector Honolulu COTP zone without the assistance from towing vessel(s) of adequate horsepower and maneuverability. Such towing vessel(s) shall be under the direction and control of an individual holding a Merchant Marine Credential (MMC) authorizing them to engage in assistance towing under the provisions of 46 CFR Part 11.482.
74 SOLAS II-2/31.1
Action required: 17 - Rectify deficiencies prior to departure
Due 14 March 2020
Resolved 16 March 2020
Resolution: Vessel conducted repairs to satisfaction of ABS in attached survey.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 13 December 2019
Resolved
Means shall be provided for stopping ventilating fans serving machinery and cargo spaces. Ventilation Louvers on Z-15-3 #13 aft set were not seating properly.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 December 2019
Resolution: The crew installed new fasteners and adjusted the louvers to seat properly. Upon completion the louvers were generally examined, operationally tested and considered satisfactory.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 13 December 2019
Resolved
In a ship in which oil fuel is used, the arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. Fuel leaks were found on the No 2 and No 3 MDGs on multiple pumps.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 December 2019
Resolution: The crew installed new high-pressure pipes for the following fuel oil pumps: Generator Engine Number Two pumps two and three; Generator Engine Number Three, pumps one and three. Upon completion, Diesel Generator Engines Two & Three & operationally tested.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 December 2019
Resolved
Where A Class divisions are pierced for the passage of electric cables arrangements shall be made to ensure that the fire resistance is not impaired. MCT in overhead of garage was to be repaired to satisfaction of attending surveyor.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 December 2019
Resolution: See report work order number 4067510
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 13 December 2019
Resolved
In all new and existing ships, fire-extinguishing appliances shall be kept in good order and made available for immediate use at all times during the voyage. CO2 dustcaps at end of distro lines have not been removed & blown through IAW manufacturer's, prove/blow through.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 December 2019
Resolution: See report Work Order 4067510
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 24 October 2019
Resolved
Except as provided in paragraph (3) of this regulation, ventilator openings shall be provided with weather-tight. Vent closure 2-72-2 fresh air supply is not weather-tight, hinges and hardware needs repair or replacement.
Refer to ABS class report number HL3749663.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 December 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 24 October 2019
Resolved
All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel or other equivalent material, permanently and strongly attached to the bulkhead, and framed, stiffened and fitted so that the whole structure is of equivalent strength to the unpierced bulkhead and weather-tight when closed. Weather-tight door across from fire damper 2-64-1 needs dogs adjusted. Light is coming through upper corners of door.
Refer to ABS class report number HL3749663.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 December 2019
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 24 October 2019
Resolved
Each liferafts shall be stowed as to permit manual release of one raft or container at a time from their securing arrangements. Liferaft hydrostatic release incorrectly installed on starboard liferaft forward and starboard liferaft aft.
HL3749663
Action required: 10 - Deficiency Rectified
Resolved 24 October 2019
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 24 October 2019
Resolved
Means shall be provided for stopping ventilating fans serving machinery and cargo spaces and for closing all doorways, ventilators, annular spaces around funnels and other openings to such spaces. Ventilation louvers on supply vents #2 and #3 did not fully close.
Refer to ABS class report number HL3749663.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 December 2019
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 October 2019
Resolved
The hull, superstructure, structural bulkheads, decks and deckhouses shall be constructed of steel, except where the administration may sanction the use of other suitable material in special cases, having in mind the risk of fire. Cable penetrations in bulkheads leading to the aft auxiliary electrical equipment room and the penetration near ladder well leading to the 51'-10 1/2" flat were impaired.
Refer to ABS class report number HL3749663.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 December 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 October 2019
Resolved
The following basic principles underlie the regulations in this chapter and are embodied in the regulations as appropriate, having regard to the type of ships and the potential fire hazard involved: restricted use of combustible materials; containment and extinction of any fire in the space of origin. Plastic sight glass tube found on the emergency generator fuel tank.
Refer to ABS class report number HL3749663.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 December 2019
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 21 February 2019
Resolved
The means for securing and maintaining weathertightness shall be to the satisfaction of the Administration. Replace watertight/gas tight gasket on hinge side on ramp door going from 2 to 1 deck in aft garage.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 March 2019
Resolved 15 April 2019
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 21 February 2019
Resolved
Each survival craft shall be stowed so that it is fully equipped as required by the Code, and that batteries not marked with an expiration date be renewed annually. Lifeboat batteries were not marked with an expiration. Vessel must prove acceptable life of the battery and mark accordingly, or renew annually.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 March 2019
Resolution: Batteries labeled IAW manufacture specs. NS5 updated.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 February 2019
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards will be ensured. Electrical panels 2-89-2 & 2-90-2 in STBD tunnel have open breaker slots that need to be covered by blanks.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 March 2019
Resolution: Panel opening blanked off.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 21 February 2019
Resolved
Doors and frames in "B" Class divisions shall have resistance to fire. Doors shall be non-combustible, and openings in doors shall be fitted with non-combustible materials. The BOSN's state room kick-out panel was replaced with plywood.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 March 2019
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 21 February 2019
Resolved
The following basic principles are embodied having regard to the type of ship and potential fire hazards involved: containment and extinction of any fire in the space of origin. The following multiple cable transits need resealed as per type as design approvals.
Emergency gear locker overhead port side.
Emergency gear locker STBD bulkhead.
Upper trailer deck port side overhead.
Upper trailer deck port side deck.
1PB port side overhead.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 March 2019
Resolved 22 March 2019
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 February 2019
Resolved
Port side stores crane wedge block was intproperly installed.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 22 February 2019
Resolution: Wire rope clamp refastened to bitter end.
09 - Working and Living Conditions › 091 - Living Conditions › Ventilation (Accommodation)
Issued 21 February 2019
Resolved
A/C dampers within accomadations were INOP.
Action required: 10 - Deficiency Rectified
Resolved 22 February 2019
Resolution: Manaul actuators reattached and operating.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 21 February 2019
Resolved
Port side dampers on top of garage had 02 louvers that failed to seat.
Action required: 10 - Deficiency Rectified
Resolved 22 February 2019
Resolution: Louvers adjusted and verified for full closure.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 21 February 2019
Resolved
Flashlight INOP in port LB.
Action required: 10 - Deficiency Rectified
Resolved 22 February 2019
Resolution: Replaced
Construction/Loadline › Hull › Hull Plating
Issued 11 May 2018
Resolved
Submit permanent repair proposal for longitudinal fracture located at approximately frame no. 67 on starboard side for approval of next U.S. port currently determined to be Sector Los Angeles/Long Beach.
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Due 11 May 2018
Resolved 18 May 2018
Resolution: repairede with a 24" x 24" insert
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 1 March 2018
Resolved
Until operation and control of the vessels propulsion system are verified by an attending CG marine inspector or class surveyor, the vessel is required to utilize two assist tugs of adequate size and horsepower when entering or departing any port within sector Honolulu's marine inspection zone.
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 1 March 2018
Resolution: Received servicing tech report stating that K-chief 600 system tested and operating properly.
Engineering › Lubricating Oil Storage/Transfer System › Gauge
Issued 10 January 2018
Resolved
Renew missing guards for engine room cylinder lube oil tank sight glass.
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 1 March 2018
Resolution: Cleared by class.
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (hydraulic)
Issued 10 January 2018
Resolved
Renew broken pipe hanger for EDG hydraulic oil start system.
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 26 January 2018
Resolution: Cleared by class.
Engineering › Steam Boiler (auxiliary/waste heat) › Gauge Glass
Issued 10 January 2018
Resolved
Make aux boiler upper drum water level gauge glasses readable.
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 26 January 2018
Resolution: Cleared by class.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 10 January 2018
Resolved
Amend or remove #2 SSDG differential trip Automation Test Procedures to account for inability to perform test as written.
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 1 March 2018
Resolution: Cleared by class.
Communications › Internal Communications System › Sound-powered Telephone
Issued 29 December 2017
Resolved
Make repairs to broken sound powered phone contact maker at the port side bunker station.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 January 2018
Resolution: Cleared by class.
Construction/Loadline › Structures › Superstructure
Issued 29 December 2017
Resolved
Fracture identified at the bulwark outboard of the port bunker station just below the connection to the garage. Make repairs to fracture and inspect for same on the stbd side.
Action required: 705 - Other - as specified
Resolved 9 February 2018
Resolution: Class cleared item.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 29 December 2017
Resolved
Provide mechanical plug for the vent containment on the portside adjacent to container bay 29.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 9 February 2018
Resolution: Class cleared.
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 29 December 2017
Resolved
Provide non conductive matting in front of all switchboards in the 02 deck fwd machinery space.
Action required: 705 - Other - as specified
Resolved 26 January 2018
Resolution: Cleared by class.
Fire Fighting › Fire Hoses › Condition
Issued 29 December 2017
Resolved
Ensure all on board fire stations are connected and ready for use.
Action required: 705 - Other - as specified
Resolved 1 March 2018
Resolution: Cleared by class.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 2 November 2017
Resolved
Provide proper operation of all ventilation louvers for roof deck exhaust vents from vehicle space. 74SOLAS2014 II-2, Reg 20.3.1.4
Action required: 17 - Rectify deficiencies prior to departure
Due 3 November 2017
Resolved 3 November 2017
Resolution: 35 of 36 dampers now are operational. The last will be secured in the closed position until is permanately repiared. See attached ABS report.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 2 November 2017
Resolved
Provide means of securing cargo hatch covers with sufficient number of dogs. Load Line, Reg 16 (4)
Action required: 17 - Rectify deficiencies prior to departure
Due 3 November 2017
Resolved 3 November 2017
Resolution: Vessel uses wedges in addition to dogs. wedges are sufficient enough to hold cargo hatches in place.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 2 November 2017
Resolved
Ensure all dogs for cargo hatches are operational. Load Line, Reg 16 (4)
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Item # 1819 Closed in ABS Report LA3427940.
Documentation › Manuals/Policy Documentation › Cargo/Ballast System Instruction Manual
Issued 2 November 2017
Resolved
Amend Cargo Securing Manual to include means of securing cargo hatches. Load Line, reg 16 (4)
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 22 February 2018
Resolution: Vessel placed amendments to hatch securing in the Trim and Stability Booklet and verified by Class
Construction/Loadline › Structures › Ventilators
Issued 2 November 2017
Resolved
Repair all vent closures on the weather decks as identified, specifically forward. Load Line, Reg 20
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Item #1819 Closed in ABS Report LA3427940.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 2 November 2017
Resolved
CLEAN BILGES IN ALL ENGINEERING SPACES TO BE FREE OF DEBRIS AND OILY WASTE
SOLAS 74 (14) II-2/ 4.1.1
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: SEE ABS REPORT HL3429483 ITEM 1759
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 2 November 2017
Resolved
PROPERLY SEAL AND PROVIDE LOAD CALCULATIONS FOR ALL MCTS FROM ENGINE ROOM TO CCR
SOLAS 74 (14) II-2/ 9.2.3.3
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 1 March 2018
Resolution: Cleared by CG MI.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 2 November 2017
Resolved
PROVIDE PLAN TO SEAL AND PROVE LOAD CALCULATIONS FOR ALL MCTS THROUGH OUT VESSEL TO BE COMPLETED WITHIN ONE YEAR
SOLAS 74 (14) II-2/ 9.2.3.3
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 26 October 2018
Resolution: ABS HL3574018-B
Engineering › Steam Boiler (auxiliary/waste heat) › Steam Drum
Issued 2 November 2017
Resolved
PROVIDE DOCUMENTATION OF AUX/WASTE HEAT BOILER FIRE/WATERSIDE INSPECTIONS AND HYDROS
ABS 4-4-1/1
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Records of testing provided to Coast Guard.
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Drum Safety
Issued 2 November 2017
Resolved
TEST 04 BOILER STEAM SAFETY VALVES IN PLACE AND ENSURE PROPER BLOW DOWN SETTING 2-4%
ABS 4-4-1/1
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: SEE ABS REPORT HL34299483 ITEM 1762
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 2 November 2017
Resolved
PROVIDE 02 SEWAGE VALVE HANDLES ON MSD DISCHARGE PIPING.
ABS 4-6-2/5.11
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Verified correction during COI Inspection.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 2 November 2017
Resolved
PROVIDE COVERS TO OPEN BREAKERS IN GALLEY POWER PANEL
ABS 4-8-4/7.3
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Verified correction during COI Inspection.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 2 November 2017
Resolved
PROVIDE INDIVIDUAL POWER OULETS TO PORTABLE REFER UNITS USED FOR SHIP'S STORES
ABS 4-8-4/17
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Verified correction during COI Inspection.
Fire Fighting › Fire Pumps › Pressure
Issued 2 November 2017
Resolved
PROVIDE ACCURATE PRESSURE GAGE FOR EMERGENCY FIRE PUMP
ABS 4-7-3/1
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Verified correction during COI Inspection.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 2 November 2017
Resolved
PROVIDE 2" DIRT TRAPS TO C02 BRANCH LINES IN OWS SPACE
SOLAS 74 (14) II-2/ 10.4.1.1
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Verified correction during COI Inspection.
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 2 November 2017
Resolved
PROVIDE PIPING TO ALLOW CCR A/C CONDENSER TO RELIEVE TO ATMOSPHERE
ABS 4-6-4/9.1.2(a)
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Verified correction during COI Inspection.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 2 November 2017
Resolved
PROVIDE VAVLE HANDLE FOR SIGHTGLASS ISOLATION ON PORT MGO SERVICE TANK.
ABS 4-6-2/5.11
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 10 January 2018
Resolution: Verified correction during COI Inspection.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 2 November 2017
Resolved
INDENTIFY OIL LEAKS AND CORRECT ON #2 & #3 DIESEL GENERATORS
SOLAS 74 (14) II-2/ 4.1.1
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 22 December 2017
Engineering › Lubricating Oil Service System › Piping
Issued 2 November 2017
Resolved
PROVIDE CORRECT BOLTING FOR #3 DIESEL GENERATOR OIL EXPANSION BOLTS
ABS 4-6-7/7.3
Action required: 705 - Other - as specified
Due 10 January 2018
Resolved 22 December 2017
Resolution: Class & ABS witnessed repairs.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 2 November 2017
Resolved
REPAIR STEERING CONTROL SYSTEM TO PREVENT STEERING SOLINOIDS FROM REPEATEDLY FAILING; PROVIDE PLAN TO IMPROVE RELIABILTY OF VESSEL'S STEERING SYSTEMS.
ABS 4-3-4/1.3
Action required: 705 - Other - as specified
Due 28 April 2018
Resolved 26 September 2018
Resolution: Repair steering control system to prevent steering solenoids from repeatedly failing; provide plan to improve reliability of vessel's steering systems. ABS approved additional maintenance cycle to quarterly inspections and annual change outs.
Operations/Management › Vessel Activity › Underway
Issued 17 February 2017
Resolved
Vessel is permitted to carry cargo enroute to Los Angeles, CA to perform modifications to the installed Yokogawa steering power control system, in order to correct known design flaw regarding the power control relays for the steering solenoid operated directional control valves. Vessel must notify the Los Angeles OCMI prior to begging the modifications.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 24 February 2017
Resolved 24 February 2017
Resolution: The electromechanical relays for the Port and Starboard side solenoid valves were replaced with higher rated solid state relays. Steering tests were conducted from local control/bridge. Voltage and amerperages at each solenoid checked, satisfactory.
Operations/Management › Vessel Activity › Underway
Issued 17 February 2017
Resolved
Vessel is required to be escorted by two assist tugs of adequate horsepower when entering or departing any U.S port until the above mentioned corrective modifications are made to the Yokogawa steering power control system and the corrections are verified and tests are witnessed by an attending CG marine inspector or attending class surveyor at the discretion of the cognizant OCMI.
Condition: Design Flaw
Action required: 15 - Rectify deficiencies by next port
Due 17 February 2017
Resolved 24 February 2017
Resolution: The electromechanical relays for the Port and Starboard side solenoid valves were replaced with higher rated solid state relays.Voltage & amerperages at each solenoid for the 4 way directional control valves verified, considered satisfactory by Surveyor.
Engineering › Steering Gear System › Solenoid Valve
Issued 17 February 2017
Resolved
While enroute to Los Angeles, CA and operating at max normal cruising speed, record amperage readings at both solenoids for each of he steering system 4-way directional control valves. Readings should be taken while rudder is moving PORT to STBD.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 February 2017
Resolved 7 March 2017
Resolution: Vessel did not take readings enroute to LA, CA as required. Did receive readings from the vessel taken during return trip to Honolulu. All sat.
Engineering › Steering Gear System › Solenoid Valve
Issued 17 February 2017
Resolved
Record voltage at both soleniods for each of the 4-way directional control valves. These voltage readings should be taken simultaneously at both solenoids while the rudder is moved to PORT, moved to STBD and moved to admidships.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 February 2017
Resolved 15 March 2017
Resolution: Received email on 13 March 2017 from port engineer [name withheld] that included the data from electrical and operational tests conducted by Yokogawa tech reps.
Engineering › Steering Gear System › Solenoid Valve
Issued 17 February 2017
Resolved
Provide results of the amperage and voltage readings for the 4-way directional control valve soleniods to the Sector Honolulu office at [email withheld]
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 February 2017
Resolved 7 March 2017
Resolution: Received readings from Port engineer [name withheld] via email
Engineering › Steering Gear System › Solenoid Valve
Issued 17 February 2017
Resolved
Upon arrival in Los Angeles, CA check & record the oil levels for each steering system 4-way directional control valve soleniod which was operated during the transit from Honolulu. Provide the results to the Sector Honolulu inspections office.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 February 2017
Resolved 13 March 2017
Resolution: Received email from vessel port engineer [name withheld], indicating that he and the chief engineer on board have checked the soelnoid oil levels on 10 March 2017 and that each solenoid was found to be filled with oil. Cleared CG-835
Engineering › Steering Gear System › Solenoid Valve
Issued 17 February 2017
Resolved
At completion of steering control system modifications, conduct the following tests prior to departure:
- Demonstrate proper operation of steering control system.
- Verify that voltage at each soleniod for the steering system 4-way directional control valves is at 115 volts AC, no more than +\- 10% as specified by the soleniod manufacturer.
Action required: 705 - Other - as specified
Due 24 February 2017
Resolved 15 March 2017
Resolution: Received full report of tests and corrective actions conducted by Yokogawa technicians. All sat. See activity narrative and Yokogawa report (scanned into activity) for more info.
Engineering › Steering Gear System › Solenoid Valve
Issued 17 February 2017
Resolved
After departing Los Angeles, CA, repeat items #3 and #4 and provide the results to the Sector Honolulu inspections office at [email withheld]
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 February 2017
Resolved 7 March 2017
Resolution: Received email from port engineer [name withheld] indicating that the chief engineer on board has taken and verified current readings were well within the soleniod manufacturer's specifications