Inspection history · 94
15 July 2026
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8437788
11 June 2026
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8401179
30 April 2026
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8358784
4 February 2026
Damage Survey · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8305877
4 February 2026
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 8312597
18 November 2025
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8270340
9 October 2025
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8250136
9 October 2025
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 8250454
10 September 2025
Damage Survey · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8230791
10 September 2025
Deficiency Check · In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8231211
9 September 2025
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 8231436
2 July 2025
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8174297
23 June 2025
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8165646
10 February 2025
Hull Examination · Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8077365
15 January 2025
In-Service Inspection · COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8064104
26 November 2024
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8040607
24 October 2024
Administrative Inspection · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8024131
10 September 2024
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8000109
3 September 2024
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7994770
24 July 2024
Damage Survey · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7966368
9 July 2024
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7954022
24 June 2024
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7943112
2 May 2024
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7911424
28 March 2024
COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7884904
22 January 2024
Deficiency Check · In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7852827
4 January 2024
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7845448
28 December 2023
Administrative Inspection · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7843133
28 December 2023
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7845018
21 October 2023
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7812243
19 October 2023
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7811760
3 October 2023
Deficiency Check · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7803035
11 July 2023
Administrative Inspection · Deficiency Check · MTSA Verification · In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7739650
29 June 2023
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7726560
13 April 2023
COI Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7665993
19 March 2023
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7653145
16 November 2022
Hull Examination · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7594824
28 September 2022
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7566362
29 June 2022
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7491297
22 June 2022
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7483048
31 March 2022
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7421798
23 February 2022
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7401512
8 December 2021
COI Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7358875
19 October 2021
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7337093
27 September 2021
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7321992
3 June 2021
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7213069
11 May 2021
In-Service Inspection · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7194955
11 May 2021
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7194979
2 March 2021
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7150482
22 January 2021
Deficiency Check · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7129164
22 December 2020
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7115151
16 December 2020
COI Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7111346
17 November 2020
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7097921
12 August 2020
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7030353
18 May 2020
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6949753
27 February 2020
MTSA Verification · COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6887138
13 February 2020
Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6908525
29 October 2019
Internal Structural Exam · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6844693
4 October 2019
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6828473
18 September 2019
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6807726
21 June 2019
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6716980
24 May 2019
Examination of Repairs · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6678594
26 April 2019
Administrative Inspection · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6672481
26 April 2019
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6673396
13 March 2019
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6640919
8 March 2019
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6638619
1 March 2019
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6635078
22 January 2019
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6613336
22 January 2019
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6613682
7 January 2019
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6606809
12 December 2018
COI Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6588543
18 October 2018
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6560168
14 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6511916
17 July 2018
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6481958
2 May 2018
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6403762
2 May 2018
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6540407
16 April 2018
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6392279
31 January 2018
MTSA Verification · COI Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6343155
15 January 2018
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6339817
14 January 2018
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6338605
7 December 2017
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6320437
4 December 2017
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6320395
4 October 2017
Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6269487
14 September 2017
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6266730
23 August 2017
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6248095
24 June 2017
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6187058
31 May 2017
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6170330
8 February 2017
COI Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6084461
3 December 2016
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6052878
9 November 2016
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6048343
27 September 2016
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6014738
17 August 2016
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5980838
7 April 2016
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5872685
6 April 2016
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5854420
26 February 2016
COI Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5822431
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 February 2026
Resolved
The main steering gear and rudder stock must be capable of moving the rudder from 35° on either side to 35° on the other with the vessel at its deepest loadline draft and running at maximum ahead service speed, and from 35° on either side to 30° on the other in not more than 28 seconds under the same conditions. Vessel reported loss of steering from the B-end pilothouse.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 February 2026
Resolved 5 February 2026
Resolution: Cleared. Steering Joystick replaced in "B" end Pilot house.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 4 December 2025
Resolved
Each muster station and embarkation station must be adequately illuminated by lighting with power supplied from the vessel's emergency source of electrical power. The embarkation light for the IBA launching and embarkation area was found inoperable.
46 CFR 199.110(c), 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2026
Resolved 6 January 2026
Resolution: Light fixed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2025
Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1 and Chapter 6 of NFPA 302.
Exhaust manifold above the MDE was found with excess
soot due to exhaust leak.
46 CFR 58.10-5(d), 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2026
Resolved 6 January 2026
Resolution: Lagging replaced
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 4 December 2025
Resolved
The position of the rudder, if power-operated, must be shown at the principal steering station.
Rudder angle indicators on both bridges are showing inconsistent readings when approaching the rudder stops.
46 CFR 111.40-5, 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2026
Resolved 15 January 2026
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 4 December 2025
Resolved
Every crew member with emergency duties assigned on the muster list must be familiar with their assigned duties before the voyage begins. Vessels crew was unfamiliar with the fixed fire fighting system controls and local release procedures during fire drill. Additional training shall be completed on fixed fire fighting systems.
46 CFR 199.180(b)(1), 705c
Action required: 705 - Other - as specified
Resolved 15 January 2026
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 4 December 2025
Resolved
Life jackets must be stowed as follows: The life jackets must be readily accessible. The release mechanism for the up river fwd life jacket stowage on deck was stuck closed when release was activated. Corrected on the spot.
46 CFR 199.70(b)(2)(i), 10c
Action required: 10 - Deficiency Rectified
Resolved 4 December 2025
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 4 December 2025
Resolved
The vessel's firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. Vessels emergency fire pump was found to have a leaking seal. Corrected on the spot.
46 CFR 78.17-80(a), 10c
Action required: 10 - Deficiency Rectified
Resolved 4 December 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 October 2025
Resolved
Electric installations on vessels must ensure:(1) Maintenance of services necessary for safety under normal and emergency conditions.
Vessel lost power while underway with passengers due to lack of fuel in the day tank serving the SSDGs. Prior to movement, conduct causal analysis.
46 CFR 111.01-1(a), 60c
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 October 2025
Resolution: Repairs made, received objective evidence, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 September 2025
Resolved
The main steering gear and rudder stock must be of adequate strength for and capable of steering the vessel at maximum ahead service speed. Vessel reported a loss of steering while underway.
//46 CFR 58.25-10(c)(1)//
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 September 2025
Resolution: Witnessed satisfactory operation of the "A" and "B" steering at the dock and underway.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 September 2025
Resolved
All watertight doors in subdivision bulkheads shall be numbered conspicuously on both sides on an etched plate or equivalent in not less than 3/8 inch letters and figures “W. T. D. 1,” “2,” “3,” etc. If a stenciled or similar notice is used, the letters and figures shall be at least 1 inch high. The engine room watertight doors were not marked “W. T. D. 1,” “2,” “3,” on either side.
46 CFR 78.47-37(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2025
Resolved 22 September 2025
Resolution: Received objective evidence that numbering has been added to watertight doors.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 September 2025
Resolved
Class 1 doors fitted in accordance with the requirements in § 170.255 of this chapter must additionally be marked “RECLOSE AFTER USE.” Engine room watertight doors were not marked with “RECLOSE AFTER USE.” on either side.
46 CFR 78.47-37(b
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2025
Resolved 22 September 2025
Resolution: Received objective evidence that signage has been placed on watertight doors.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 10 September 2025
Resolved
Each opening in an exposed weather deck must—Have a means for closing it weathertight. The "A" end watertight hatch to the steering compartment is missing the cotter pin, causing the dogs to fall off and making it unable to be secured weathertight.
46 CFR 171.122(f)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2025
Resolved 22 September 2025
Resolution: Received objective evidence watertight scuttle is repaired.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 23 June 2025
Resolved
In general, at least three re-inspections shall be made on each vessel within one year. These re-inspections will be made at approximately equal intervals between annual inspections.
Due to ongoing regulatory drydock, the vessel has not received the required quarterly re-inspection since the vessel's COI was renewed 10JAN25. Upon attendance to conduct re-inspection, attending MIs found steering system to be inoperable and were unable to complete the inspection.
Complete quarterly re-inspection prior to movement.
46 CFR 71.30-1, 701
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 July 2025
Resolution: Completed quarterly inspection.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 29 January 2025
Resolved
Sufficient illumination must be provided by the emergency lighting source under emergency conditions to effect damage control procedures and to provide for safe egress from each space. MI observed 01 emergency light extinguished on the B end, down river side. 46CFR111.75-15(c)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2025
Resolved 8 April 2025
Resolution: Verified repair of emergency light and proper installation during vessel drydock period, wittnessed operation. Inspected Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 29 January 2025
Resolved
Each vessel must carry a lifejacket for each person on board. MI found 10 adult lifejackets missing from A end, upriver side container.
46CFR199.70(b)(1)
Action required: 10 - Deficiency Rectified
Resolved 29 January 2025
Resolution: Vessel crew had spares shoreside and quickly stenciled required markings.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 January 2025
Resolved
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. The crew could not properly demonstrate the loss of power alarms for the #1 or #2 steering gear motors.
46CFR61.40-6(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2025
Resolved 31 January 2025
Resolution: Vessel demonstrated loss of power alarms for the #1 & #2 steering gear motors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 January 2025
Resolved
Each pressure vessel, other than one exempted by this section, must be subjected to a hydrostatic test at a pressure of 1 1/4 times the maximum allowable working pressure twice within any five-year period, except that no more than three years may elapse between any test and its immediate predecessor. Vessel was due to test their Pressure Vessels on 05NOV2024.
46CFR61.10-05 (d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2025
Resolved 18 March 2025
Resolution: Witnessed 1 and 2 air receivers with a MAWP of 275 psi hydro at 343 psi, pressure held in place for 10 mins no failure observations, test Sat. Changed Air receiver inspection dates, test credit for 18MAR25, Next 16NOV27.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 25 July 2024
Resolved
A survey, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter. Vessel loss steering on A end and actively trouble shooting.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 July 2024
Resolution: Vessel replaced Pilot [name withheld] Transfer Switch. Test SAT.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 28 March 2024
Resolved
The installation of all systems of an interior communications nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter J.
Each passenger vessel must have a public address system capable of broadcasting separately or collectively to accommodation spaces and service spaces.
One of two loudspeakers in the salon space was inoperable.
46 CFR 77.05-1(a)
46 CFR 113.50-10(g)
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 April 2024
Resolved 2 May 2024
Resolution: Rectified to the satisfaction of the attending MI
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 March 2024
Resolved
All electrical engineering details and installations shall be designed and installed in accordance with subchapter J (Electrical Engineering) of this chapter.
Each cable installation must meet Sections 6, of IEEE 45.8–2016.
Several cables on the overhead of the A end bridge were not supported with metallic supports.
46 CFR 111.60-5
IEEE 45-2002 25.5
50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2024
Resolved 2 May 2024
Resolution: Rectified to the satisfaction of the attending MI
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 28 March 2024
Resolved
The vessel's firefighting equipment must at all times be ready for use.
Vessel’s main and emergency fire pumps were found to be leaking at the seal.
46 CFR 78.17-80(a)
50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2024
Resolved 2 May 2024
Resolution: Rectified to the satisfaction of the attending MI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 December 2023
Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of subchapter F (Marine Engineering) of this chapter. The vessel representative reported the A side propulsion system did not respond to bridge commands.
46 CFR 70.20-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 January 2024
Resolved 4 January 2024
Resolution: Visually examined air line and coupling installation; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 October 2023
Resolved
The main steering gear must be operable from the pilothouse by mechanical, hydraulic, electrical, or other means acceptable. This gear and its components must give full follow up control of the rudder. Vessel reported inaccurate readings for the rudder angle indicator on the B end.
46CFR58.25-70(b)
Action required: 10 - Deficiency Rectified
Resolved 21 October 2023
Resolution: Resolved via tech report
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 19 October 2023
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Fire boundary door from B-end to main deck was unable to close. Crew corrected on the spot.
46CFR72.03-5
Action required: 10 - Deficiency Rectified
Resolved 19 October 2023
Resolution: MI's witnessed door latch.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 19 October 2023
Resolved
The installation of all lifesaving appliances and arrangements must be in accordance with the requirements of subchapter W. 4 out of 5 HRU's were found to be installed incorrectly. Crew corrected on the spot.
46CFR77.06-1
Action required: 10 - Deficiency Rectified
Resolved 19 October 2023
Resolution: MI's witnessed crew members correct HRU's
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 October 2023
Resolved
When a vessel must temporarily deviate from the requirements of this part, the vessel owner or operator must notify the cognizant COTP, and either suspend operations or request and receive permission from the COTP to continue operating. MI discovered the Storeroom, a "Restricted Area" as defined in the VSP unlocked.
33CFR104.125
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 November 2023
Resolution: O/O sent in documentation of locked door.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 October 2023
Resolved
The main steering gear must be operable from the pilothouse by mechanical, hydraulic, electrical, or other means acceptable. This gear and its components must give full follow up control of the rudder. Vessel reported a loss of steering in follow up mode due to a sheared coupling in the potentiometer. 46CFR58.25-70(b)
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 October 2023
Resolved 3 October 2023
Resolution: Duty MI witnessed steering test from the A and B end pilot house. Operating both steering pumps in follow up mode. All sat. 01 835 cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 October 2023
Resolved
The main steering gear must be operable from the pilothouse by mechanical, hydraulic, electrical, or other means acceptable. This gear and its components must give full follow up control of the rudder. Vessel reported a loss of steering in follow up mode due to a sheared coupling in the potentiometer. 46CFR58.25-70(b)
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 October 2023
Resolved 6 October 2023
Resolution: Witnessed steering test with new coupling.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 11 July 2023
Resolved
Electrical grade deck coverings meeting MIL-M-15562, non-conducting mats, or non-conducting gratings must be in each working area in front of and behind each switchboard. The deck covering is missing from in front of the EDG switchboard working area.
46CFR111.30-11
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 July 2023
Resolved 12 July 2023
Resolution: Received photograph objective evidence showing deck covering is installed in front of the EDG switchboard.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 13 April 2023
Resolved
The main steering gear and rudder stock must be of adequate strength for and capable of steering the vessel at maximum ahead service speed, which must be demonstrated to the satisfaction of the OCMI. Vessel over-hauled steering system during drydock & was still in operable at time of inspection for certification. Rectify prior to issuing COI. 46 CFR 58.25-10(a)(1)
Action required: 705 - Other - as specified
Due 21 April 2023
Resolved 21 April 2023
Resolution: Tested Satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 13 April 2023
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. All of the inflatable rafts are not in their stowage locations and not connected to hydrostatic releases as required. 46 CFR 199.190(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 April 2023
Resolution: Received objective evidence of life rafts with hydrostatic releases installed.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 13 April 2023
Resolved
Plans for lifesaving and fire control items are to show location and arrangement of the manufacturer's name and identification for all equipment, and all other relevant and necessary information. Vessel safety/fire control plan was not available during the inspection. 46 CFR 71.65-1(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2023
Resolved 29 June 2023
Resolution: Cleared. New Plan examined and stamped.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 April 2023
Resolved
Containers and other similar stowage locations for lifesaving equipment if more than one device is stowed in a location, the number of devices stowed must be indicated. 12 child life jackets were condemned due to cracking or deterioration. The child life jacket stowage location in the saloon is short 12 life jackets of the required 55 indicated on the container. 46 CFR 199.178(a) & (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2023
Resolved 21 April 2023
Resolution: New children's lifejackets brought onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 April 2023
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. The starboard side ring buoy located amidships was cracked through the exterior coating exposing it to water-logging, affecting buoyancy. 46 CFR 199.190(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2023
Resolved 21 April 2023
Resolution: New Bouy installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 April 2023
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. 7 adult life jackets were condemned due to cracking or deterioration. Satisfactory life jackets were replaced in the presence of the CG Marine Inspector. 46 CFR 199.190(a)
Action required: 10 - Deficiency Rectified
Resolved 21 April 2023
Resolution: [name withheld] verified lifejackets were correct onboard.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 28 September 2022
Resolved
Each opening in an exposed weather deck must have a means for closing it weather tight. Vessels hatch for the A-end steering compartment gasket is damaged in several locations.
46CFR171.122
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2022
Resolved 27 March 2023
Resolution: Observed new gasket and hose tested.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 June 2022
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the OCMI. Vessel self-reported that they were replacing a circuit breaker panel in the EDG compartment with a newly fabricated panel. The panel provides overcurrent protection to the rescue boat davit. Submit plans for new panel to Marine Safety Center for review and approval before work can begin. (46 CFR 71.55-1(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 July 2022
Resolved 13 April 2023
Resolution: Recieved plan approval from MSC for EDG breaker panel.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 29 June 2022
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Vessel's rescue boat davit powered winch is inoperable. After further discovery, winch motor may not be originally approved winch for the rescue boat. Demonstrate USCG approval for the currently installed rescue boat davit winch. (46 CFR 199.190(a))
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 July 2022
Resolved 28 September 2022
Resolution: Locally approved motor.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 22 June 2022
Resolved
Vessel has cracked welds on the steering quadrant safety tab in the A-end steering compartment.
46CFR58.25-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 2 March 2023
Resolution: Secondary saftey plates on the rudder post quadrant has been rewelded.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 22 June 2022
Resolved
Each opening in an exposed weather deck must have a means for closing it weather tight. Vessels hatch for the B-end steering compartment is missing its gasket.
46CFR171.122
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 27 March 2023
Resolution: Observed new gastket and hose tested.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 June 2022
Resolved
Fixture globes shall be protected by guards. Vessel has missing bulbs in the A-end and B-end steering compartments and a broken cover in the B-end steering compartment.
46CFR111.75-20(a)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 28 September 2022
Resolution: O/O replaced bulbs and cover.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 31 March 2022
Resolved
Doors shall have a latch with a minimum throw of 3/4 inch which can be operated from either side of the door. Found fire door latch for the second deck entrance on both A and B ends unable to latch and secure fire boundary.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2022
Resolved 14 April 2022
Resolution: Doors repair to the satisfaction of the CGMI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 March 2022
Resolved
No alterations affecting the safety of the vessel with regard to machinery or equipment shall be made without the knowledge of the OCMI. Vessel installed heating tape on sweetwater box discharge piping and affixed extension cord for power on vessel's A and B ends. Remove extension cord and install permanent cable to provide power to heater. Complete at next drydock.
Action required: 705 - Other - as specified
Resolved 2 March 2023
Resolution: Permanent wire has been ran in both A and B ends to an outlet providing power to the heating strips.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 8 December 2021
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Vessel's rescue boat davit powered winch is inoperable. 46 CFR 199.190(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 September 2022
Resolution: Locally approved motor winch.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 December 2021
Resolved
Each hand portable fire extinguisher shall be marked with a number and the location where stowed shall be marked with a corresponding number at least 1/2 inch high. Vessel's portable extinguishers and locations were not properly labeled. 46 CFR 78.47-30(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 February 2022
Resolution: Portable extinguishers were numbered correctly.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 December 2021
Resolved
Each entrance to a space protected by carbon dioxide systems must be conspicuously marked as follows: "CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. WHEN ALARM OPERATES, DO NOT ENTER UNTIL VENTILATED. LOCK OUT SYSTEM WHEN SERVICING." Engine room entrance is missing CO2 warning sign. 46 CFR 78.47-11(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 February 2022
Resolution: Spaces protected by fixed CO2 fire extinguishing systems were marked as required.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 December 2021
Resolved
Each lifejacket container must be marked in block capital letters and numbers with the quantity, identity, and size of the equipment stowed inside the container. Vessels B-side lifejacket container markings for quantity of children's lifejackets was missing. 46 CFR 199.70 (d)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 February 2022
Resolution: PFD stowage lockers were correctly marked.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 27 September 2021
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and available for immediate use. Ring lifebuoys have worn retro reflective material.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 October 2021
Resolution: Vessel renewed retro reflective material on life ring buoys.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 May 2021
Resolved
46CFR58.25-70(b): The main steering gear must be operable from the pilothouse by mechanical, hydraulic, electrical, or other means acceptable to the commanding officer, marine safety center. This gear and its components must give full followup control of the rudder. Vessels steering system was not operational from #1, #2 hydraulic pump and non followup control.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2021
Resolution: Steering system is operating as required.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 16 December 2020
Resolved
Each vessel must carry enough lifejackets for each person on board vessel. Vessel is mising 1 lifejacket and 13 were found unservicable. Vessels passenger count is reduced by 14, maximum passenger count is 335. Maximum persons allowed is 341.
Action required: 705 - Other - as specified
Due 16 December 2020
Resolved 22 December 2020
Resolution: Vessel had 14 new adult lifejackets and restenciled the locker in the solon with 53.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 16 December 2020
Resolved
There shall be at least 2 means of excape from all areas where the crew may be employed. A and B end escape hatches were not able to be opened by hand.
Action required: 10 - Deficiency Rectified
Due 16 December 2020
Resolved 16 December 2020
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 May 2019
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment shall be made without the knowledge of the Officer in Charge, Marine Inspection. The vessel sustained damage to the b-end upriver bow. Complete repairs to the bow in accordance with the approved repair proposal submitted on 1 May 2019 to the satisfaction of the attending Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 May 2019
Resolution: Steel repaired with USCG MI attendance throughout progression of repair & USCG witnessed final test of the repair via pressing up of the space to 1.5 psig.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 27 April 2019
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment shall be made without the knowledge of the Officer in Charge, Marine Inspection. The vessel sustained damage to the b-end upriver bow. Provide a repair proposal for the damage to the bow to the satisfaction of the attending Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 May 2019
Resolution: Received and approved a permanent repair proposal for the damage sustained to the vessel's b-end upriver bow.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 January 2019
Resolved
Fuel supply piping to engines shall be of seamless steel. Friday night, January 18, vessel experienced a pinhole leak (3-4 drops per 5 minutes) in the fuel pump supply line. It was discovered that the fuel pump supply line to the filter housing has a crack at the weld. Repair the pinhole leak to the satisfaction of the attending Coast Guard Marine Inspector by testing to maximum allowable working pressure. (46CFR56.50-75)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 January 2019
Resolution: Fuel pump supply line repaired by certified welder.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 14 August 2018
Resolved
The vessel is currently Not broadcasting (1) IMO Number
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 September 2018
Resolved 25 September 2018
Resolution: Owner reported AIS discrepancies corrected. Used NAVCEN to verify accuracy of vessel's AIS broadcast.
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (hydraulic)
Issued 2 May 2018
Resolved
It has been reported that the vessels main propulsion clutch is not functional. Determine the cause of failure, Repair the clutch in accordance with the original equipment manufacturers (OEM) specifications, and prove the proper operation of the vessel's main propulsion clutch to the satisfaction of the attending Marine Inspector prior to carrying passengers.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2018
Resolved 8 May 2018
Resolution: Vessel has removed clutch that is no longer used that was to be attached to an auxiliary come home engine that is no longer on board and spool piece installed.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 31 January 2018
Resolved
Two (02) fire screen doors do not operate as designed and will not close. Adjust fire screen doors and demonstrate operation to the attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2018
Resolved 9 February 2018
Resolution: Witnessed operation of 02 fire screen doors, all sat.
Engineering › Fuel Oil Service System › Valve, Control
Issued 31 January 2018
Resolved
B-end emergency fuel shut off is not labeled. Label emergency fuel shutoff to the satisfaction of the attending CG MI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 February 2018
Resolved 9 February 2018
Resolution: Inspected labeling of emergency fuel shutoff valve, all sat.
Engineering › Steering Gear System › Linkage
Issued 15 January 2018
Resolved
Vessel reported steering casualty 14Jan2018 at appx 1805. Upon inspection it was found that the main steering (B End) hydraulic linear actuator sheered from the clevis and disconnected from the rudder.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 January 2018
Resolution: Attended vessel and conducted steering test while underway. Steering test all sat. Vessel reps replaced the clevis and reattached the stweering ram to the rudder.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 23 August 2017
Resolved
The A end and B end pilot house rudder angle indicators are not indicating the correct position of the rudder up to a 5 to 7 degree difference. Repair the rudder angle indicators so that the correct position of the rudders are shown. Repairs shall be to the satisfaction of the attending Marine Inspector. 46 CFR 113.40
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 October 2017
Resolved 22 November 2017
Resolution: Witnessed operational test of steering gear to include rudder angle indicators; all sat.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 23 August 2017
Resolved
The B end fire screen door to the accommodation space does not completely latch and close. Repair the B end fire screen door so that is latched and closes completely. Repairs shall be to the satisfaction of the attending Marine Inspector. 46 CFR 72.05-25
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 September 2017
Resolved 14 September 2017
Resolution: Qualified Marine inspector witnessed proper closing of B end fire door.
Electrical › Electric Generation Source (emergency) › Generator
Issued 23 August 2017
Resolved
The emergency diesel generator starting batteries are not secure. Secure the batteries to prevent movement to the satisfaction of the attending Marine Inspector. 46 CFR 111.15-6
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 September 2017
Resolved 14 September 2017
Resolution: Qualified Marine inspector witnessed the satisfactory securing of the EDG batteries.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 23 August 2017
Resolved
The engine room emergency escape trunk light is not operational. Repair the engine room emergency escape trunk light to the satisfaction ofthe attending Marine Inspector. 46 CFR 112.15 (d)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 September 2017
Resolved 14 September 2017
Resolution: Qualified marine inspector witnessed proper lighting for the ENG RM escape trunk.
Electrical › Electric Generation Source (emergency) › Switch
Issued 24 June 2017
Resolved
Repair emergency shutdown alarm fault and ensure functionality of EDG.
Condition: Improper/Lack of Maintenance
Due 26 June 2017
Resolved 26 June 2017
Resolution: Vessel provided tech report (attached) showing faulty wiring. Repaired and tested functionality, all sat.
Engineering › Bilge Water Management System › Pump
Issued 8 February 2017
Resolved
Power bilge pump must have the capacity to develop suction... Vessel unable to take suction w/ bilge pump. Repair to the satisfaction of attending MI.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 February 2017
Resolution: Vessel maintenance crew replaced bilge pump packing. MI witnessed operational test of bilge pump/ system; all sat.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 17 August 2016
Resolved
Vessel is required to have a means of stopping the fuel oil transfer pump from the storage tank to the day tank outside the machinery space. Vessel shall provide a means to stop the pump within 30 days.
Action required: 705 - Other - as specified
Due 19 September 2016
Resolved 27 September 2016
Resolution: Conducted test of fuel shut-down switch , all sat.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 7 June 2016
Resolved
Vessel installed new fuel service day tank without prior plan approval. Tank, tank alarms, and tank cut-out switches have been tested, all sat. Vessel shall provide proper plan approval documentation.
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 1 August 2016
Resolution: Received approval letter from MSC E1-1602552 aprovinf the installed fuel transfer systema nd day tank.
Electrical › Electric Generation Source (emergency) › Generator
Issued 7 June 2016
Resolved
Vessle was unable to demonstrate proper alarms for the high pressure fuel line leak detection. Vessel shall demonstrate alarm to the satisfaction of the attending amrine inspector.
Action required: 705 - Other - as specified
Due 8 July 2016
Resolved 8 June 2016
Resolution: Vessel provided documentation from servicing company that alarm was properly installed and tested in accordance with PSTPs.
Fire Fighting › Fire Hoses › Condition
Issued 2 March 2016
Resolved
Two 50ft. fire hoses failed a hydrostatic test and were replaced with 50 ft. fire hoses that are not UL approved. Replace two 50ft. fire hoses with UL approved hoses to the satisfaction of an attending marine inspector.
Action required: 705 - Other - as specified
Due 2 April 2016
Resolved 6 April 2016
Construction/Loadline › Structures › Door
Issued 2 March 2016
Resolved
Emergency escape hatch from engine control room was inoperable (excessively difficult) from interior. Develop means to open hatch with ease.
Action required: 705 - Other - as specified
Due 2 April 2016
Resolved 6 April 2016