Records from 2002 to 2021. Most recent: inspection, 13 December 2021.
Inspection history · 66
13 December 2021
MARPOL Annex VI Survey · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7366911
6 December 2021
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7363510
29 November 2021
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7358476
2 September 2021
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7302686
16 August 2021
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7288696
11 August 2021
In-Service Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7283547
26 July 2021
Drydock Extension · Spot Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7268749
13 July 2021
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7255405
6 July 2021
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7247562
8 June 2021
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7237972
27 April 2021
Bulk Solid Transfer Monitor
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7185003
25 March 2021
MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7162806
23 October 2020
Administrative Inspection · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7082854
6 October 2020
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 7072602
5 September 2020
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7111701
5 August 2020
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7024930
21 July 2020
Deficiency Check · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7012296
1 April 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6934095
1 March 2020
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6918889
31 January 2020
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 6900461
1 October 2019
Examination of Repairs · In-Service Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6825825
13 September 2019
Administrative Inspection · Deficiency Check · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6813120
13 August 2019
Administrative Inspection · Deficiency Check · Examination of Repairs · Damage Survey · Plan Review (Other than "T")
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6783918
23 May 2019
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6691295
29 April 2019
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6672419
18 April 2019
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6667487
16 April 2019
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6662424
16 October 2018
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6562621
14 October 2018
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6562372
26 August 2018
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6531597
20 July 2018
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6492182
16 July 2018
Drydock Exam · Administrative Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6506973
4 May 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6405693
30 April 2018
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6403367
7 April 2018
DAPI Audit · MTSA Verification · Ballast Water Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6385608
20 January 2018
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6341351
20 January 2018
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6341503
4 January 2018
In-Service Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6331840
18 November 2017
Examination of Repairs · Deficiency Check · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6309798
2 November 2017
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6301466
26 October 2017
Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6296000
5 July 2017
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6199247
19 May 2017
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6150311
9 March 2017
Administrative Inspection · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6101928
8 March 2017
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6106110
20 February 2017
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6092796
15 February 2017
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6089216
3 February 2017
DAPI Audit · MTSA Verification · COI Inspection · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6082458
5 December 2016
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6052519
14 November 2016
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6040723
24 October 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6028414
20 October 2016
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6027323
19 October 2016
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6025987
19 October 2016
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6025992
19 October 2016
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6026001
6 October 2016
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6017694
27 September 2016
Plan Review (Other than "T") · Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6010503
15 September 2016
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6006676
1 September 2016
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5990573
18 July 2016
In-Service Inspection
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 5973182
29 June 2016
Cargo Tank Internal · Internal Structural Exam · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5923472
8 June 2016
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5907128
26 May 2016
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5887467
25 May 2016
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5907019
20 April 2016
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5858226
22 January 2016
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5801513
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2021
Resolved
Each boiler must be available for examination at the intervals provided in table 61.05-10. Vessel is overdue on boiler inspections. Vessel movement is restricted until the boiler inspections are completed.
If the vessel needs to shift to another location, this office shall be notified and approval must be given prior to any movement.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 2 December 2021
Resolution: Vessel flag has shifted from U.S. to foreign.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 13 July 2021
No resolution recorded
For underwater hull repair completed on July 13, 2021 in Port Everglades, the area of repair must be inspected at next dry dock by a Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 6 July 2021
Resolved
When major alterations or major repairs of tank vessels become necessary the work shall be done under the direction of the Officer in Charge, Marine Inspection,and shall be in accordance with the regulations in effect for new construction insofar as possible. When minor alterations or minor repairs of tank vessels become necessary such work shall be under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect at the time the vessel was contracted for or built, or in accordance with the regulations in effect for new construction insofar as possible. Vessel sustained an approx 2 inch wastage hole in way of the #3 port double bottom ballast tank. Although temporary repairs are made, additional repairs shall be made to the satisfaction of the cognizant OCMI and attending CG Marine Inspectors. Vessel is authorized to transit in accordance with submitted transit plan, to the Sector Miami area to make additional repairs in accordance with submitted repair proposal. Sector Miami shall be notified prior to any repairs being made and/or if any changes in condition occur. 705: Prior to offloading cargo.
Action required: 705 - Other - as specified
Resolved 13 July 2021
Resolution: Received class preliminary report for hull repair. Deficiency cleared, however a new CG835V issued to have hull repair observed by CG Marine Inspector at next dry dock.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 6 July 2021
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant codes and regulations and with any additional requirements which may be established by the company.
Vessel SMS "HSE-section 20" pg. 8
Required that any marine casualty or accident or threat to thereof must be reported to USCG immediately.
Vessel SMS "BRM-Section 3" pg7
Require that daily pages are to be completed by the OOW at the end of each watch sea or in port and initiated by the OOW.
The USCG was not immediately notified of the ingress of water into the vessels #3 port double bottom ballast tank due to a hole in the hull. The incident was not logged in the ships official logbook until 4 days after the incident was discovered.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 August 2021
Resolved 16 August 2021
Resolution: Internal audit complete.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 6 July 2021
Resolved
As deliniated in deficiencies 1-2, objective evidence attests to the vessels crew failing to effectivly impletment basic SMS procedures related to reporting damage to the vessel effecting its seaworthiness. The failiure of the implementation of the SMS poses a significant risk to the safety of the crew.
An additional internal verification of the vessels SMS focusing on the above items is required within 90 days in acordance with CVC-WI-003(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 16 August 2021
Resolution: Internal audit completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 April 2021
Resolved
Port boiler superheater safety valve failed to lift in accordance with it's stamped pressure.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 16 April 2021
Resolved 18 April 2021
Resolution: Chief engineer, provided written statement attesting to install and proper testing of Super heater safety valve with ABS surveyor in attendance. ABS also provided report to attest.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 16 April 2021
Resolved
Each survival craft, except for inflatable craft, must be stripped, cleaned, and thoroughly inspected and repaired, as needed, at least once each year. Starboard life boat to be stripped, cleaned and thoroughly inspected by a certified lifeboat company. The following has been noted engine cover is loose, side widows are etched fittings for dewatering are cracked.
Action required: 705 - Other - as specified
Due 31 August 2021
Resolved 13 May 2021
Resolution: See attached service report
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 16 April 2021
Resolved
The ship’s crew has installed new LED Lights on deck in a hazardous zone, submit installation plan info to USCG Marine Safety Center Plans must be submitted for Coast Guard review in accordance with § 110.25–3: Deck wiring or schematic plans of power systems and lighting systems.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2021
Resolved 3 May 2021
Resolution: The Marine Safety Center (MSC) has received the subject e-mail. If you have any questions about this submittal, please reference document ID #2112716
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 16 April 2021
Resolved
Scuttles/Hatchway coamings at positions 1 and 2 the height above the deck coamings fitted with weather-tight hatch covers of steel or other equivalent material fitted with gaskets and clamping devices shall be as specified. Emergency escape from Auxiliary Machinery Space have scuttles which the locking pockets for the dogs are holed. Make pockets watertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2021
Resolved 13 May 2021
Resolution: POC emailed picture of repaired scuttle
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 16 April 2021
Resolved
Immerision suits shall be fitted with light and whistle. Immersion suit in Engine control room found without
operational light.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 16 April 2021
Resolved 16 April 2021
Resolution: Third mate had installed functional water light on the immersion suit before inspection was completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 23 October 2020
Resolved
No repairs, replacements, or alterations, except emergency repairs, shall be made to boilers, pressure vessels, their mountings or internal fittings, safety valves, piping systems, or pressure appliances without prior approval by the Officer in Charge, Marine Inspection. Hole found in port boiler super heater tube. Vessel shall make permanent repairs to or plug the affected boiler tube and conduct pressure testing to the satisfaction of the OCMI. Vessel allowed to proceed to lay berth with appropriate tug escorts until tests can be witnessed by the attending Coast Guard Marine Inspector.
46 CFR 59.01-5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 October 2020
Resolution: Attended vessel w/ class surveyor, observed repair and hydro testing was carried out at 1200 psi with no leaks observed. All satisfactory to attending USCG Marine Inspector.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 1 March 2020
Resolved
Vessel requested to sail with one less Oiler as required on COI. One-time transit approved. See narrative for details.
Action required: 10 - Deficiency Rectified
Due 6 March 2020
Resolved 4 March 2020
Resolution: Received e-mail attestation of full crew compliment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 1 October 2019
Resolved
No repairs, replacements, or alterations, except emergency repairs, shall be made to boilers, pressure vessels, their mountings or internal fittings, safety valves, piping systems, or pressure appliances without prior approval by the Officer in Charge, Marine Inspection. Boiler has approx. 2 inch crack in 1 tube of the super-heater. Vessel shall make permanent repairs to the boiler tube and conduct pressure testing to the satisfaction of the OCMI. Vessel is allowed to proceed to A-4 Anchorage with appropriate tug escorts as per approved transit plan. 46 CFR 59.01-5
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2019
Resolved 2 October 2019
Resolution: Tube was plugged and hydro test of boiler was completed and witnessed satisfactorily.
14 - Pollution Prevention › 141 - MARPOL Annex I › 15 PPM Alarm arrangements
Issued 1 October 2019
Resolved
Discharge of oil or oily mixtures into the sea from machinery space bilge is prohibited, unless the vessel is equipped with an approved, under 46 CFR 162.050, 15 ppm oil content meter. The vessel's OWS oil content meter was removed and sent ashore for maintenance/repair. Prove proper operation of oil content meter when reinstalled to the satisfaction of attending Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2019
Resolved 7 October 2019
Resolution: Chief Engineer submitted evidence that the OCM was properly installed, calibrated and tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 August 2019
Resolved
essel's Chief Engineer identified numerous wasted generating tubes (12-14) in the starboard boiler and verified by a USCG [name withheld] to the amount of present plugged tubes in the same pass, vessel must provide documentation from the boiler manufacturer attesting that the amount of tubes to be plugged in that row (30+ out of 52) falls within allowable limits.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 August 2019
Resolution: Received documentation from the manufacturer attesting to proper repair.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 August 2019
Resolved
Vessel must submit in writing a repair proposal for the starboard generating tubes to be plugged.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 August 2019
Resolution: Received proper repair proposal and witnesed proper repair and hydrostatic test.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 April 2019
Resolved
In weather locations, on a tankship, electrical equipment must be instrinsically safe, explosion proof, or purged/pressure type. On the open deck, over the cargo area, there are two lighing fixtures(port and starboard side near manifolds) that have shattered covers. As a temp fix the lighting cable has been removed and terminated in an approved junction box. Make permanent repairs to the satisfaction of cognizant OCMI
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2019
Resolved 23 May 2019
Resolution: received objective evidence (photo) of newly installed light.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 April 2019
Resolved
Electrical installations on vessels must ensure protection of crew and other persons from electrical hazards. The upper deck light panel L-104 closure is being held shut with masking tape due to the closing device being inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 April 2019
Resolution: A closing device (latch) was installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 April 2019
Resolved
Electrical installations on vessels must ensure protection of crew and other persons onboard from electrical hazards. The ventilation motor control in the officer's laundry room is missing a bulf and cover.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 April 2019
Resolution: Bulb and cover was installed properly
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 16 April 2019
Resolved
Each survival craft launching and recovery appliance must be approved under 46 CFR 160 ... with a winch approved under 46 CFR 160 Subpart 160.115. The starboard side lifeboat winch data plate is missing an no approval specification could be verified. Provide approvel spec for winch.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2019
Resolved 23 May 2019
Resolution: Received objective evidence (photo) that an appropriate placard was made and attached to winch.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 7 April 2018
Resolved
Fire control plan does not reflect the purpose of which space is used for throughout vessel. Review fire control plan and make changes as needed prior to August 6, 2018.
Action required: 705 - Other - as specified
Due 6 August 2018
Resolved 30 April 2018
Resolution: MI verified the crew rooms previously found being utilized as a storage locker have been cleared and returned to crew state rooms as identified on the current fire plan.
Accommodation/Occupational Safety › Ventilation › General
Issued 7 April 2018
Resolved
Ventilation is starting to accumulate excessive lint/dust causing fire hazard. Clean all vents.
Action required: 705 - Other - as specified
Due 6 August 2018
Resolved 30 April 2018
Resolution: MI verifed the ventaliaton screens to the accomodation spaces have been cleaned and made clear of excessive lint and dust.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 April 2018
Resolved
Correctly end wire in fan room cabin deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 May 2018
Resolved 30 April 2018
Resolution: MI verified the improperly ended wire found in the main house a/c fan motor room has been pulled and removed.
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 20 January 2018
Resolved
Vessel emitted turbine oil, which was used as stern tube lubrication, through the shaft seal into the Penobscott Bay. Vessel is to submit repair plan proposal to Coast guard and Classification Society; once approved, vessel is to affect permanent repairs to affected system prior to departure from port.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2018
Resolution: Vessel replaced stern tube seals while in port at Searsport, Maine. All repairs were made and tested in the presence of Marine Inspector and ABS. No leaks were reported. Deficiency CLeared.
Lifesaving › Launching Appliances › Padeye
Issued 22 November 2017
Resolved
Vessel has altered the original wire rope anchor point on the foundation to the Port lifeboat launching appliance fwd and aft arms from the original design, must recieve authorization from OEM and submitauthorization from the OEM and submit drawings, material list, through the [name withheld] for approval by MSC/CVC.
Due 22 December 2017
Resolved 11 December 2017
Resolution: Reviewed MSC letter C1-1704448, uploaded pdf document named “Supporting Docs for CG-835 Item 2 dated 22NOV17” detailing acceptance of new arrangements.
Lifesaving › Launching Appliances › Padeye
Issued 18 November 2017
Resolved
Vessel made repairs and alterations to the port and stbd life boat launching appliances. Repair and alterations were made without advance notification to the OCMI. Vessel is required to submit plans for approval to ABS and the Marine Safety Center. Repairs must be made with ABS and Coast Guard oversight. Upon completion of repairs proper testing must be conducted. A weight test must be conducted and witnessed by a Coast Guard Marine Inspector. Stbd life/rescue boat will be taken out of service until all above requirements are fulfilled.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 November 2017
Resolved 22 November 2017
Lifesaving › Lifeboat › Hull
Issued 26 October 2017
Resolved
Make repairs to damage of lifeboat and have inspected by manufacturer and CG Marine Inspector. 46 CFR 199.153
Action required: 705 - Other - as specified
Resolved 22 November 2017
Lifesaving › Launching Appliances › Davit
Issued 26 October 2017
Resolved
Make repairs to damaged port side dual point davit. 46 CFR 199.190
Action required: 705 - Other - as specified
Resolved 22 November 2017
Lifesaving › Launching Appliances › Release Mechanism
Issued 26 October 2017
Resolved
Make repairs to port side davit releasing gear. 46 CFR 199.190
Action required: 705 - Other - as specified
Resolved 22 November 2017
Lifesaving › Launching Appliances › Falls
Issued 26 October 2017
Resolved
Make repairs/replace falls as needed. 46 CFR 199.190
Action required: 705 - Other - as specified
Resolved 22 November 2017
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 9 March 2017
Resolved
Vessel had identified a stern tube leak when departing last port. Provide a dive survey with root cause and any corrective action or required repairs.
Action required: 17 - Rectify deficiencies prior to departure
Due 9 March 2017
Resolved 10 March 2017
Resolution: Received dive report confirming no leak from stern tube.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 22 February 2017
Resolved
Port anchor windlass sliding clutch failed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 19 May 2017
Resolution: MI and Class witnessed satisfactory operation of the port anchor windlass sliding clutch.
Fire Fighting › Fire Main › Material
Issued 3 February 2017
Resolved
Discovered a small pin hole leak on the emergency fire main piping, replace the piping to good metal.
Action required: 705 - Other - as specified
Due 17 February 2017
Resolved 17 February 2017
Resolution: Replaced wasted section of piping, tested SAT.
Accommodation/Occupational Safety › Ventilation › General
Issued 3 February 2017
Resolved
The paint locker vent piping is badly corroded and needs to be replaced.
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 17 February 2017
Resolution: Replaced paint locker ventillation piping.
Engineering › Steam System (auxiliary) › Piping
Issued 3 February 2017
Resolved
The butterworth piping arrangement brackets appear to have undue strain (i.e. springs on brackets are fully compressed). Verify that the brackets for this system are installed in acoordance with ANSI B31.1.
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 17 February 2017
Resolution: Re-installed butterworth piping brackets IAW standards
Engineering › Pressure Vessel › Relief Valve
Issued 3 February 2017
Resolved
The relief valve did not work properly on the air reciever for the deck lower air compressor, replace the relief valve.
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 22 February 2017
Resolution: Vessel installed new SRV and MI witneesed pop test.
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 3 February 2017
Resolved
While conducting the PSTP's for the throttle control system, item 2.2, the L/O pressure trip did not work in accordance with the approved PSTP's. Prove proper operation of the test or consider changing the PSTP to correct the test procedure properly.
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 17 February 2017
Resolution: Conducted test of L/O pressure trip PSTPS 2.2 with satisfactory results after vessel Chief Engineer replaced associated relay.
Construction/Loadline › Structures › Ventilators
Issued 3 February 2017
Resolved
Repair or replace supply vent closure to aft storeroom.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2017
Resolved 3 February 2017
Resolution: On board maintenance crew replaced the missing/broken bolts and proved functionality.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 3 February 2017
Resolved
Repair inoperable stern tow light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2017
Resolved 3 February 2017
Resolution: Repaired faulting on deck wiring.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 3 February 2017
Resolved
Relocate steam line termination above foam supply line valve IWO forward Cargo Control Room bulkhead.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 13 February 2017
Resolved 3 February 2017
Resolution: Crew rerouted steam line to prevent accidental injury.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 February 2017
Resolved
Replace damaged armored cable leading to explosion proof light forward of Cargo Control Room on the port side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 February 2017
Resolved 17 February 2017
Resolution: Replaced entire run of armored cable all the way up to nearest junction box
Electrical › Electrical Distribution System (service) › Junction Box
Issued 3 February 2017
Resolved
Repair brackets and replace metal cable hangers on electrical junction boxes under cargo manifold.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2017
Resolved 3 February 2017
Resolution: Secured loose wiring and boxes. Developed long term plan to re-engineer to avoid future damage due to vibration.
Fire Fighting › Fire Hydrants › Condition
Issued 3 February 2017
Resolved
Replace leaking fire main hydrant valve at forward most port side hydrant.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2017
Resolved 3 February 2017
Resolution: Crew replaced valve in kind.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 3 February 2017
Resolved
Replace missing front panel on starboard ECDIS.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 February 2017
Resolved 17 February 2017
Resolution: Replaced missing panel on STBD ECDIS
Lifesaving › Lifeboat › Hatches
Issued 3 February 2017
Resolved
Properly repair/replace malfunctioning forward hatch on port side lifeboat.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 22 February 2017
Resolution: Vessel installed new hatch.
Lifesaving › Lifeboat › Hatches
Issued 3 February 2017
Resolved
repair leaking starboard side, aft hatch on portside lifeboat.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 17 February 2017
Resolution: Replaced gasket on STBD side aft hatch of port side life boat, tested sat.
Navigation › Collision/Grounding Avoidance › Radar
Issued 5 December 2016
Resolved
Vessel shall provide technician service report attensting to fully operational radar required by 33CFR164.37(a).
Action required: 17 - Rectify deficiencies prior to departure
Due 6 December 2016
Resolved 6 December 2016
Resolution: Received technician report attesting to installation and commisioning of new radar.
Navigation › Collision/Grounding Avoidance › Automatic Radar Plotting Aid (ARPA)
Issued 19 October 2016
Resolved
Make permanent repairs to the s band marine radar system before departing Searsport, ME.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 14 November 2016
Resolution: Obtained tech report showing def corrected
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 27 September 2016
Resolved
Vessel has installed a new ODME, prior to use USCG MI needs to witness the following: 1 Hydro test of all newly installed piping associated with changing over of slop tanks, 2 Provide welders certificates, 3 Demonstrate that crew who operate the new ODM can properly operate it, 4 Demonstrate that the information can be safely retrieved. See attached CG835, activity narrative and uploaded document
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 30 November 2016
Resolution: Vessel cleared all items...see case narrative for details.
Fire Fighting › Fire Main › Valves
Issued 29 August 2016
Resolved
#2 block valve on fire main was inoperable in the open position. Blocks #2, #3 and #4 on the foam main were inoperable in the open position. repair or renew block valves.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 September 2016
Resolution: MIs verified the #2 fireman block valve and the #2,#3, and #4 foam line block valves have replace with new item. Indicators provided.
Construction/Loadline › Structures › Door
Issued 28 August 2016
Resolved
Aft 2nd deck weathertight accomodations door. Lower panel on door frame had severe wastage. Crew caulkled with fire resistant material and weleded a steel plate over. Door frame will be replaced when back in the USA. Extended 30 days. See narrative.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 6 October 2016
Resolution: Verified permanant repairs were made to 2nd deck aft accomodation access weathertight door. Cleared item #1 on 835 issued 28AUG2016.
Fire Fighting › Fire Main › Valves
Issued 28 August 2016
Resolved
Some fire and foam main valve block indicators are unreadable. Valve blocks should clearly inidicate open or close position. Reapir or renew indicators.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 September 2016
Resolved 1 September 2016
Resolution: Deficient fire main and foam line block valves has been replace. All test satisfactory.
Lifesaving › Launching Appliances › Winch Brake
Issued 28 August 2016
Resolved
Prove proper operation of port lifeboat winch brake. Brake lever does not automatically lower in the stop position when released.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 August 2016
Resolution: Crew cleaned up break lever and componenents. brake now operates as intended
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 28 August 2016
Resolved
Wasted top elbow on main deck rail next to stores crane. repair or renew.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 September 2016
Resolved 1 September 2016
Resolution: Deteriorated section of hand rail located ivo stores crane has been cropped and renewed. All sat.
Lifesaving › Launching Appliances › Release Mechanism
Issued 28 August 2016
Resolved
Upon testing of newly installed hydrostaic release hooks on port lifeboat, hydrostatic release not functioning as designed. Prove proper operationo of hydrostatic sfety release on hooks.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2016
Resolution: Technician from manufacture arrived and replaced tension cable attached to safety release and diaphram. Old rension cable had a slight crease. Recevied report of repair and verification of proper operation from manufacturer. Schatt harding.
Deck/Cargo › Cargo Stowage › General
Issued 28 August 2016
Resolved
Cargo tanks 4C, 5C, 7P and 7S were changed from an existing zinc coating to a Carboline 9570 epoxy coating, therefore changing the cargoes the tank can carry. Current CAA does not reflect new coatings on those tanks. Vessel needs to apply to MSC to recevie an updated CAA and P & A manual prior to utilizing tanks for new cargo not specifically listed for those tanks.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 1 September 2016
Resolution: Rcvd approved CAA serial # C1-1603210. Also rcvd approval for revised P A manual.
Documentation › Manuals/Policy Documentation › Training Manual (lifesaving)
Issued 28 August 2016
Resolved
Update lifesaving training manual to reflect new procedures for new lifeboat hook release system and ensure crew is provided training on new hook release procedures.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2016
Resolution: Captain updated training manual or provided training to all crew members onboard prior to sailing.
Lifesaving › Lifeboat › Carriage Requirement
Issued 28 August 2016
Resolved
Lifeboats were removed from vessel for refurb. All required lifesaving equipment was removed and stored. Ensure all required lifesaving equipment is provided back to lifeboat upon reinstall of port and stbd lifeboat.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2016
Resolution: Captain attested in a signed letter that all required equipment was reinstalled in both lifeboats. Letter scanned into activity.
Engineering › Steam Boiler (propulsion) › Piping
Issued 18 July 2016
Resolved
Provide Radiography Report for the newly welded saturated steam line on the starboard boiler. Include technicians credentials.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 9 August 2016
Resolution: Received report
Engineering › Steam Boiler (propulsion) › Steam Drum
Issued 18 July 2016
Resolved
Provide thickness gauging report for the port steam drum IWO relieved pit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 9 August 2016
Resolution: Received report.
Engineering › Steam Boiler (propulsion) › Steam Drum
Issued 18 July 2016
Resolved
Provide statement from boiler manufacturer that the boiler is still safe to operate with the existing abnormality and that the design MAWP has not been affected.
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 9 August 2016
Resolution: Received statement from B&W.
Engineering › Steam Boiler (propulsion) › Steam Drum
Issued 18 July 2016
Resolved
Request that a Magnetic Particle/Radiography test be completed in way of the abnormality in the starboard steam drum with results forwarded to the Cognizant OCMI.
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 17 August 2016
Resolution: Received Technicians Level II Credentials for the report that was received on the 9th.
Engineering › Steam Boiler (propulsion) › Steam Drum
Issued 18 July 2016
Resolved
Request calculations are preformed to ascertain that the design MAWP of the starboard boiler is not affected with the abnormality in the steam drum.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 9 August 2016
Resolution: Received B&W report.
Engineering › Steam Boiler (propulsion) › Steam Drum
Issued 18 July 2016
Resolved
Complete a 1 1/2 MAWP hydro of the starboard boiler to prove the strength of the boiler.
Condition: Improper/Lack of Maintenance
Due 31 August 2016
Resolved 24 July 2016
Resolution: Witnessed satisfactory hydro (1575 PSI).