Records from 2003 to 2025. Most recent: inspection, 20 October 2025.
Inspection history · 25
20 October 2025
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8250066
21 October 2024
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8022115
7 May 2024
In-Service Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7908171
21 August 2023
Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7768454
20 July 2022
Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7511851
24 August 2021
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7275143
16 September 2020
Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7050088
2 July 2019
Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6721140
16 August 2018
COI Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6513970
7 September 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6256126
12 October 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6017459
30 September 2015
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5732697
26 August 2014
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4959429
16 November 2010
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3889033
4 February 2010
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3675580
28 October 2008
COI Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3349614
15 November 2007
Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3095273
14 September 2006
Simplified Stability Test · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2778434
18 August 2006
Administrative Inspection · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2752516
21 March 2006
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2604520
23 November 2004
Deficiency Check
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2247060
25 October 2004
COI Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2227519
2 October 2004
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2212334
8 March 2004
Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2020794
29 April 2003
Construction Oversight · Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1782639
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 October 2025
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fited in the fuel supply lines. The shutoff valve at the tank must be manually operable from outside the compartment. Inspector observed inoperable fuel shutoff valve.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 November 2025
Resolved 4 November 2025
Resolution: Received video of installed stainless steel rod connected to value handle that can be safely and effectively operated the remote shut off valve from outside the motor and fan blade cage.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 21 August 2023
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. MI observed remote fuel valve handle broken and inoperable. Owner rep replaced and verified operation prior to departure.
46CFR182.455(b)(4)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 August 2023
Resolved 21 August 2023
Resolution: Replaced and tested to the satisifaction of [name withheld]
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 21 August 2023
Resolved
The vessel must also be equipped with child size life jackets equal to at least. MI observed 01 child life jacket to be defective. Life jacket was destroyed in the presence of the MI and replaced with one in good condition.
46CFR176.808(e)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 August 2023
Resolved 21 August 2023
Resolution: Replaced with servicable jacket and appropriate size. all sat
Construction/Loadline › Structures › Deck Plating
Issued 7 September 2017
Resolved
Repair Cracked welds in the following locations: 2 welds in FWD most passenger railing. 3 Welds behind Aft most passenger seat. 1 Weld in upper section of wind rudder support frame
Action required: 705 - Other - as specified
Due 11 September 2017
Resolved 7 September 2017
Resolution: Weld on wind rudder support was corrected on the spot. Received Pictures of the rest of the repairs via email.
Lifesaving › Buoyant Apparatus › Marking
Issued 16 November 2010
Resolved
Ensure proper labeling of ring buoy.
Due 7 December 2010
Resolved 7 December 2010
Engineering › Gasoline Engine (propulsion) › Valve Rod (4 cycle)
Issued 16 November 2010
Resolved
Prove proper operation of fuel shut off valve.
Due 7 December 2010
Resolved 7 December 2010
Documentation › Certificates/Documents › Stability Letter
Issued 18 August 2006
Resolved
Conduct a Simplified Stability Test to the satisfaction of the local OCMI.
Due 18 September 2006
Resolved 19 September 2006
Resolution: Witnessed/verified satisfactory Simplified Stability Test conducted by Arthur D. Darden, Inc Naval Architects.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 21 March 2006
Resolved
Float switch unable to activate bilge pump due to disconnected/broken wires.
Action required: 705 - Other - as specified
Resolved 11 April 2006
Resolution: New bilge pump float switch installed.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 25 October 2004
Resolved
Provide proof that starboard fire extinguisher has been replaced with serviceable fire extinguisher.
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 November 2004
Resolved 23 November 2004
Resolution: Received verification that a new extinguisher had been replaced with a newly purchased extinguisher.
Construction/Loadline › Hull › Keel Plate
Issued 25 October 2004
Resolved
Provide proof that 3 inch fracture on stern keel plate has been properly welded and repaired.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 November 2004
Resolved 23 November 2004
Resolution: Received verification that the repair had been made.