Records from 2003 to 2026. Most recent: inspection, 1 June 2026.
Inspection history · 24
1 June 2026
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8361648
17 June 2025
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8131219
15 February 2024
Deadweight Survey · Drydock Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7866268
8 September 2023
Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7788203
1 May 2023
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7678633
18 April 2022
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7433229
8 March 2021
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7152195
5 March 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6921451
19 February 2019
COI Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6628158
7 March 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6365962
17 March 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6106851
18 February 2016
COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5812627
6 March 2014
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4806680
15 May 2012
Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4295117
17 February 2011
COI Inspection · DAPI Audit · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3943029
20 April 2009
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3426330
3 June 2008
Hull Examination · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3220394
27 July 2007
Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3005165
2 October 2006
Simplified Stability Test · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2791940
18 August 2006
Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2750111
25 July 2005
Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2438964
2 October 2004
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2212334
21 July 2004
Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2140328
4 June 2003
Initial Certification · Initial Construction-Excluding Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1809554
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 September 2023
Resolved
This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems, steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. It was reported that vessel struck an underground object and capsized. Repair plan shall be submitted and approved prior to vessel undergoing any permanent repair(s). 46 CFR 182.100
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 September 2023
Resolved 11 October 2023
Resolution: Conducted Repair Check and confirmed all repairs satisfactory per repair plan.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 March 2021
Resolved
The one 24" lifering was old, discolored, and dryrotted. Replace with a new life ring
Action required: 10 - Deficiency Rectified
Due 25 March 2021
Resolved 25 March 2021
Resolution: Vessel rep replaced old lifering with a new one during the inspection.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 17 February 2011
Resolved
Forward fuel tank - Install proper hoses and fittings.
Due 17 March 2011
Resolved 13 April 2011
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 17 February 2011
Resolved
Forward fuel tank - Install shut off valve at the tank
Due 17 March 2011
Resolved 13 April 2011
Resolution: Installed shut off valves at the forward and aft fuel tanks.
Operations/Management › Passenger Operations › Safety Orientation
Issued 17 February 2011
Resolved
Due to recent failure/passenger injury with the armrest type handrail the Coast Guard has determined that these handrails alone do not meet the equivalent safety requirements of 46 CFR 177.900. Propose additional handrail construction to the Coast Guard to enhance passenger safety and comply with the equivalent safety requirements of 46 CFR 177.900.
Due 13 July 2011
Resolved 15 May 2012
Resolution: Inspected handrails; new installations meet safety requirements of 46 CFR 177.900.
Engineering › Gasoline Engine (propulsion) › Hose, Cooling System (4 cycle)
Issued 20 April 2009
Resolved
Engine coolant hoses are dry rotted, with a leak detected at water pump. Replace all engine coolant hoses.
Condition: Unknown
Due 21 May 2009
Resolved 4 May 2009
Engineering › Fuel Oil Service System › Valve
Issued 20 April 2009
Resolved
Fwd fuel tank has no remote shut-off. Install remote shut-off for tank.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2009
Engineering › Gasoline Engine (propulsion) › Engine Block (4 cycle)
Issued 20 April 2009
Resolved
Port side engine mounts cracked where mounted to hull at forward and aft locations. Grind out and reweld cracks.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2009
Documentation › Certificates/Documents › Stability Letter
Issued 18 August 2006
Resolved
Conduct a Simplified Stability Test to the satisfactory of the local OCMI.
Due 18 September 2006
Resolved 19 September 2006
Resolution: Satisfactory simplified stability test was conducted on the SWAMP KING, O.N. CG613832, which has been determined to be the sister vsl of the WIND KING.
Accommodation/Occupational Safety › Occupational Safety
Issued 18 July 2003
Resolved
PRIOR TO CARRYING PASSENGERS ON FORWARD SEAT INSTALL RAILS FORWARD OF SEATS. SEND PICTURES TO [name withheld] DESC: Deck Rail
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 July 2003
Resolution: RECEIVED DIGITAL PICTURES OF INSTALLED RAILS.