Inspection history · 131
7 March 2025
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8090249
21 February 2019
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6629785
13 July 2015
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 5183132
16 December 2014
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 5040453
12 December 2014
Administrative Inspection · In-Service Inspection · Examination of Repairs · Load Line/Change of Employment
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5039434
11 June 2013
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4617356
6 May 2012
Type not recorded
No type recorded · Sector Field Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 4455921
23 April 2012
Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 4293537
14 April 2012
Type not recorded
No type recorded · Sector Field Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 4301427
8 March 2012
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 4259641
8 March 2012
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 4259646
20 February 2012
Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 4254400
15 February 2012
In-Service Inspection · COI Inspection · MTSA/ISPS Verification
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 4245396
31 January 2012
Internal Structural Exam
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 4235088
24 January 2012
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 4230463
27 December 2011
Deficiency Check · Examination of Repairs · Damage Survey
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 4214579
15 December 2011
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 4208902
26 August 2011
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 4127808
9 August 2011
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 4110549
29 July 2011
Damage Survey
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 4098623
26 December 2010
Damage Survey
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3916251
24 December 2010
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3915924
10 September 2010
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3848970
28 August 2010
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3872945
12 August 2010
Type not recorded
No type recorded · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 3825577
9 July 2010
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3790546
12 June 2010
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3767881
1 June 2010
Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3754916
6 May 2010
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3748112
24 March 2010
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 3702031
23 February 2010
Annual Inspection · Examination of Repairs · MTSA Verification
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 3688524
26 January 2010
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 3670141
19 September 2009
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 3598133
2 March 2009
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 3426251
13 December 2008
Type not recorded
No type recorded · Sector Field Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 3381443
20 November 2008
Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3366732
29 October 2008
Type not recorded
No type recorded · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 3354844
28 October 2008
Type not recorded
No type recorded · USCG Great Lakes District (dpb) · USCG Great Lakes District (CGD-GL) · Activity 3352996
30 September 2008
Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3335394
1 August 2008
Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3285980
23 June 2008
Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3246568
13 June 2008
In-Service Inspection
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3239517
20 April 2008
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3212173
12 February 2008
Re-Inspection · MTSA Verification
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3146171
14 December 2007
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 3115673
2 December 2007
Damage Survey · Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3108763
11 October 2007
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3108716
31 August 2007
Damage Survey
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 3043710
13 March 2007
Type not recorded
No type recorded · USCG Great Lakes District (dpb) · USCG Great Lakes District (CGD-GL) · Activity 2886959
16 January 2007
In-Service Inspection · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2854414
1 May 2006
Type not recorded
No type recorded · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 2639350
16 March 2006
Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2603672
15 March 2006
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2609326
28 February 2006
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 2594457
1 November 2005
Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 2526041
27 October 2005
Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 2523394
13 October 2005
MTSA Verification · COI Inspection
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 2510030
1 July 2005
Damage Survey
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 2410372
28 February 2005
Administrative Inspection
Administrative · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 2304809
28 February 2005
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 2337590
19 October 2004
Deficiency Check
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 2224740
4 October 2004
MTSA Verification · Re-Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 2220699
3 September 2004
Type not recorded
No type recorded · Station Marblehead · USCG Great Lakes District (CGD-GL) · Activity 2207127
4 June 2004
Type not recorded
No type recorded · Marine Safety Detachment Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 2130455
2 June 2004
Type not recorded
No type recorded · Marine Safety Detachment Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 2168726
9 December 2003
Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1961790
26 August 2003
Type not recorded
No type recorded · Marine Safety Detachment Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 1887516
7 August 2003
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1869164
9 April 2003
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1770834
4 April 2003
Administrative Inspection
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1768212
9 December 2002
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1716459
25 October 2002
Re-Inspection · Internal Structural Exam
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1687954
14 September 2002
Internal Structural Exam
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1678948
13 June 2002
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1677546
18 May 2002
Type not recorded
No type recorded · Marine Safety Detachment Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 1618443
7 April 2002
Damage Survey
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1602078
29 March 2002
Internal Structural Exam
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1598900
28 November 2001
Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1076431
12 October 2001
Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 29098
13 August 2001
Damage Survey · Deficiency Check · Hull Examination · Re-Inspection
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1376686
3 August 2001
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 79944
3 August 2001
Damage Survey
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1070273
13 June 2001
Deficiency Check
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1066183
19 April 2001
Deficiency Check
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1061681
9 April 2001
Deficiency Check
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1061572
5 April 2001
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1447072
23 March 2001
Damage Survey
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1059858
20 November 2000
Deficiency Check
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 824848
25 October 2000
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1055096
19 September 2000
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 83860
13 September 2000
Damage Survey
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1053774
12 September 2000
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 140919
12 September 2000
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 217621
30 August 2000
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1373201
22 March 2000
Permit to Proceed
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1433618
17 March 2000
Permit to Proceed
Administrative · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1468120
7 July 1999
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 122027
17 May 1999
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 813288
31 March 1999
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1441487
9 March 1999
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1411831
6 December 1998
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 98663
14 October 1998
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 141107
4 June 1998
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 802324
13 March 1998
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1108119
1 November 1997
Hull Examination
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1375169
16 June 1997
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1111993
2 May 1997
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1101958
9 April 1997
Administrative
Administrative · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1102741
17 March 1997
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1107213
5 December 1996
Administrative
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 877398
4 December 1996
Drydock Extension
Administrative · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1187321
22 April 1996
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1080384
13 December 1995
Damage Survey
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1377567
2 October 1995
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 69264
15 August 1995
Deficiency Check
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1189078
11 July 1995
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 380452
20 June 1995
Initial Certification
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 881290
3 June 1995
Uninspected Other · Damage Survey · Examination of Repairs
Physical examination · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 1371081
6 May 1995
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 31431
12 July 1994
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 485711
5 July 1994
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 368372
27 June 1994
Damage Survey
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1132706
25 June 1994
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 160289
20 May 1994
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 69977
30 December 1993
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 675762
30 December 1993
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 697998
7 November 1993
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 176229
16 September 1993
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 57942
8 June 1993
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 121102
8 June 1993
Type not recorded
No type recorded · Commandant (CG-INV) · Activity 223066
22 April 1992
Type not recorded
No type recorded · COTP SAULT ST. MARIE · USCG Great Lakes District (CGD-GL) · Activity 350267
Deck/Cargo › Ballast › Piping
Issued 16 December 2014
Resolved
Make permanent repairs to the 33 starboard ballast line in the ballast pump room to the satisfaction of the attending [name withheld] and submit a condition report on the remaining ballast piping in the ballast pump room to the satisfaction of the attending [name withheld] hourly rounds of space and log bilge level findings and condition of temporary repair.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 March 2025
Resolution: Upon re-entry into service, verify installation of ballast water system and associated piping.
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 3 May 2012
Resolved
In dual mode mariners reside on the tug INVINCIBLE with the operating station unmanned; therefore a remote fire alarm panel (visible & audible) which monitors the tugs engine room shall be installed in the forward operating station as required by 46 CFR 95.05-1. Installation to be iaw 46 CFR 113.10-1 with Dwgs submitted to USCG MSC or ABS per 46 CFR 91.55-15(a)(3)or(4).
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 January 2013
Resolved 19 October 2012
Resolution: System found acceptable and approved since it is U.L. listed and ABS verified the installation
Communications › Alarms/Indicators › General Alarm
Issued 23 April 2012
Resolved
Genral Alarm bell in upper machinery pump room did not work.
Action required: 17 - Rectify deficiencies prior to departure
Due 2 May 2012
Resolved 2 May 2012
Communications › Alarms/Indicators › General Alarm
Issued 23 April 2012
Resolved
General Alarm light in upper machinery pump room did not work.
Action required: 17 - Rectify deficiencies prior to departure
Due 2 May 2012
Resolved 2 May 2012
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 23 April 2012
Resolved
3 Fire extinguishers were stowed on deck in the upper machinery pump room and were not in the correct location.
Action required: 17 - Rectify deficiencies prior to departure
Due 2 May 2012
Resolved 2 May 2012
Stability › Watertight Integrity › General
Issued 15 February 2012
Resolved
Noted opening cut into main transverse watertight bulkhead separating main engine space and conveyor tunnel/lower level. Issued requirement to install insert in MTWTB prior to sailing.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2012
Resolution: Noted opening had been corrected inserted & welded.
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 15 February 2012
Resolved
Reverse power relay for center generator set did not trip breaker when powered by port gen set.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 28 March 2012
Resolution: Electrician discovered that the coil for trip mechanism was not wired correctly. Electrician changed the wiring connections and the reverse power relay operated properly.
Construction/Loadline › Hull › Hull Plating
Issued 27 December 2011
Resolved
Submit repair proposal of hull fracture iwo fr.193 at port inboard side barge notch wing to [name withheld] for review/approval. Make barge accessible for damage survey by USCG Marine Inspector prior to conducting cargo operations. Repairs to be completed to satisfaction of attending USCG Marine Inspector and ABS Surveyor. Establish 2-hr notification to SLM CC on crack propagation status.
Action required: 705 - Other - as specified
Due 30 December 2011
Resolved 31 December 2011
Resolution: Repairs made to deck and shell plate, cropped and renewed 3/4" deck plate and 1/2" shell plate in way of fracture. Additional internal structural repairs to deep web stbd void of notch wing frame 211, and related shelf brackets & Port WBT.
Construction/Loadline › Hull › Hull Plating
Issued 27 December 2011
Resolved
Vessel incurred damage in way of fractured deck plate and side shell (shear) of port notch wing. Operator must provide structural analysis and assessment of related causal factors of damage in way of fractured deck plate and sideshell of port notch wing. Report to be provideed to [name withheld] and American Bureau of Shipping(ABS).
Action required: 705 - Other - as specified
Due 15 February 2012
Resolved 15 February 2012
Resolution: Engineering report from Northeast Technical Service Company, Inc. dated Feb 4, 2012, submitted and accepted.
Construction/Loadline › Hull › Hull Plating
Issued 27 December 2011
Resolved
Provide written repair proposal for repairs effected to fractured deck plate and related structural members in way of port notch wing, and wing voids. Proposal shall include steel certificates, dimensions and procedures of installation.
Due 15 January 2012
Resolved 4 January 2012
Resolution: Received email from operator with attachment of ABS survey report and specific repairs made. Scanned and attached document to activity.
Fire Fighting › Fire Pumps › Arrangement
Issued 9 August 2011
Resolved
Two of the vessels three fire pumps are in operable. Arrangements have been made to tie the tugs fire main into the barges for added firefighting capabilities. Repairs to the barges fire pump are to be completed to the satisfaction to the attending marine inspector .
Action required: 705 - Other - as specified
Due 19 August 2011
Resolved 26 August 2011
Resolution: Received e-mail confirmation from vessel Master through company rep attesting to the fire pumps being operational.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 23 February 2010
Resolved
Kw gauges on the generator's switchboard provide useless readings which makes it difficult to parallel the generators. Replace these gauges by 01MAY2010. Requirement due date extended until 21MAY2010.
Due 21 May 2010
Resolved 20 May 2010
Resolution: Recvd confirmation KW meters have been replaced.
Electrical › Electric Generation Source (service) › Generator
Issued 23 February 2010
Resolved
Starboard Ship's Service Generator is not operational due to the exciter being removed. Prove proper operation to the satisfaction of marine inspector no later than 01MAY2010.
Condition: Improper/Lack of Maintenance
Due 1 May 2010
Resolved 30 April 2010
Resolution: Starboard Ship''s Service Generator is operational, deficiency is cleared.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 23 February 2010
Resolved
All but one emergency light in the ship's cargo tunnel do not illuminate. Repair emergency lighting to the satisfaction of attending marine inspector prior to leaving the Port of Cleveland.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 April 2010
Resolution: Returned to the ship to inspect repairs made to emergency lighting. Emergency lighting operates as designed, deficiency cleared.
Construction/Loadline › Structures › Deck Plating
Issued 23 February 2010
Resolved
Multiple lifeline stantions on the portside are bent or fractured and must be repaired by 31MARCH2011.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2011
Resolved 31 March 2011
Resolution: Straightened and rewelded.
Fire Fighting › Fire Main › Condition
Issued 23 February 2010
Resolved
Fire main piping on starboard side is leaking from patch. Repair to the satisfaction of attending marine inspector by 01MAY2010.
Condition: Improper/Lack of Maintenance
Due 1 May 2010
Resolved 1 May 2010
Resolution: Rcvd digital photos of new dresser coupling installed.
Stability › Watertight Integrity › General
Issued 23 February 2010
Resolved
Watertight door between pump room and tunnel does not seal. Must pass chalk test prior to leaving the Port of Cleveland.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 April 2010
Resolution: Returned to the ship to inspect the repairs to the watertight door. Upon inspection door was able to pass chalk test and all dogs seal firmly against plates. Deficiency cleared.
Deck/Cargo › Mooring/Anchoring › Anchor Cable
Issued 2 March 2009
Resolved
Found #4 mooring wire with a broken lay. Replace wire with in 7 days.
Action required: 705 - Other - as specified
Due 24 August 2009
Resolved 24 August 2009
Resolution: New wire has been installrd per Captain.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 2 March 2009
Resolved
Found STBD aft deck rail to be wasted through. Repair as original with in 7 days.
Action required: 705 - Other - as specified
Due 24 August 2009
Resolved 24 August 2009
Resolution: Repaired per Captain.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 2 March 2009
Resolved
Found STBD MDE Tach at pilot station inoperative. Repair with in by 17 Sep.
Action required: 705 - Other - as specified
Due 17 September 2009
Resolved 19 September 2009
Resolution: STBD Tach has been repaired
Engineering › Diesel Engine (auxiliary) › Connecting Rod
Issued 13 June 2008
Resolved
Replace prime mover and generator as original
Action required: 705 - Other - as specified
Due 25 June 2008
Resolved 23 June 2008
Resolution: The centerline generator and prime mover have been renewed, starboard generator re-assembled and placed into service.
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 12 February 2008
Resolved
Replace rubber boot on air intake to turbocharger for Centerline Generator prime mover.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 24 June 2008
Resolution: Renewed generator and prime mover.
Engineering › Diesel Engine (auxiliary) › Silencer (exhaust)
Issued 12 February 2008
Resolved
Repair exhaust leak on port generator set prime mover.
Action required: 705 - Other - as specified
Due 30 June 2008
Resolved 28 April 2008
Resolution: Exhaust leak corrected
Engineering › Generator (propulsion/auxiliary-electric) › Winding
Issued 12 February 2008
Resolved
Clean and inspect generator windings on Centerline and Port gensets.
Action required: 705 - Other - as specified
Due 1 August 2008
Resolved 1 August 2008
Resolution: Done
Stability › Unintentional Flooding › General
Issued 12 February 2008
Resolved
Replace all leaking packing glands on ballast tank manifold, ballast pumps.
Due 30 April 2008
Resolved 28 April 2008
Resolution: Replaced packing material.
Fire Fighting › Fire Pumps › Gland Sealing
Issued 12 February 2008
Resolved
Replace packing in horizontal fire pump.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Resolution: Packing replaced.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 12 February 2008
Resolved
Replace/fix butterfly valve between pump room and engine space so that it closes and opens.
Due 10 April 2008
Resolved 28 April 2008
Resolution: Installed new valve
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 12 February 2008
Resolved
Remove or properly stow all loose equipment in engine space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 12 February 2008
Resolved
Re-submit fire control plan to reflect the newly installed FM-200 system and the new location of the B-v system.
Due 30 April 2008
Resolved 13 June 2008
Resolution: corrected, endorsed and posted
Engineering › Fuel Oil Storage/Transfer System › Manifold
Issued 12 February 2008
Resolved
Re-submit fuel system diagram to MSC for approval.
Due 30 June 2008
Resolved 30 June 2008
Resolution: submitted to MSC
Stability › Unintentional Flooding › General
Issued 12 February 2008
Resolved
Proove age of all non-metalics for the ballast pumps. There are 4 in total located in the pump room.
Due 1 September 2008
Resolved 1 September 2008
Resolution: Non-metalics have been replaced.
Stability › Unintentional Flooding › General
Issued 12 February 2008
Resolved
Blank flange all valves in lower engine room.
Due 1 August 2008
Resolved 1 August 2008
Resolution: Done
Stability › Unintentional Flooding › General
Issued 12 February 2008
Resolved
Submit drwings to MSC for approval an emergency dewatering system for the main space.
Due 1 March 2009
Resolved 1 June 2010
Resolution: Cleared per e mail this date.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 12 February 2008
Resolved
A-60 bulkhead between main space and electrical room needs to be needs to be completed utilizing the approved high heat resistant caulking for the cable penetrations.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Resolution: Master sent documention attesting to this requirement.
Construction/Loadline › Penetrations › Valve Flange
Issued 12 February 2008
Resolved
Blank flange pipe on the #8 port ballast tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Resolution: Repairs have been made.
Electrical › Electric Supply System (service) › Cable
Issued 12 February 2008
Resolved
Properly hang all newly installed electrical cable in pump room stbd side overhead as the cable transits through the bulkhead from the main space into the pump room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Resolution: Completed.
Fire Fighting › Semiportable CO2 Fire Extinguishers › Discharge Hose
Issued 12 February 2008
Resolved
Replace hose on the installed B-V semiportable fire extinguisher as there is a crack located next to the connection point on the real. This is located in the electrical room just forward of the main space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Resolution: Hose has been replaced.
Stability › Unintentional Flooding › General
Issued 12 February 2008
Resolved
Provide a temporary secondary means of dewatering the main space i.e. portable submersable pump to augment the single submersable currently on board and until a emergency dewatering system has been installed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Resolution: Second submerdable pump is on board.
Stability › Unintentional Flooding › General
Issued 12 February 2008
Resolved
Remove all debris from the bilge so as to prevent the installed submersible pump from clogging while in operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Resolution: Debris has been removed.
Electrical › Electric Generation Source (service) › Panelboard
Issued 12 February 2008
Resolved
Install/test new electrical system and prime mover for newly installed generator set on the stbd side of the main space.
Action required: 705 - Other - as specified
Resolved 23 June 2008
Resolution: Attended vessel on 23 June 2008, witnessed sat test of engine safeties and shutdowns, as well as sat test of generator, and reverse power relay.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 12 February 2008
Resolved
Provide approved electrical plans for newly installed electrical board and its association with the newly installed generator set.
Due 1 February 2009
Resolved 15 December 2011
Resolution: Per attached document, ABS approved plans were submitted to MSC on or about 13 March 2008. ABS has inspected and accepted the installation.
Electrical › Electric Supply System (service) › Cable
Issued 12 February 2008
Resolved
Provide a one line diagram of the entire barge and submitt for approval to MSC.
Due 1 February 2009
Resolved 1 July 2010
Resolution: Opened activity to clear 835 IAW MVI Policy letter 06-93, Plans Previously Approved.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 12 February 2008
Resolved
Properly lable electrical boards to reflect which electrical panel operates which electrical prime mover.
Due 30 April 2008
Resolved 28 April 2008
Resolution: installed placards
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 12 February 2008
Resolved
Install or repair bunk light in OS's room.
Due 30 April 2008
Resolved 24 April 2008
Lifesaving › Lifebuoys › Stowage
Issued 12 February 2008
Resolved
Remove the light or life line on the buoy located on the stbd side adjacent to the accomodation space as a lite line and a life line should not both be attached to the same ring buoy.
Due 30 April 2008
Resolved 28 April 2008
Resolution: Relocated water light
Lifesaving › Lifebuoys › Serviceable
Issued 12 February 2008
Resolved
Replace light line on ring buoy located port side IWO the accomodation space.
Due 30 April 2008
Resolved 28 April 2008
Resolution: Line replaced
Construction/Loadline › Penetrations › Gasket
Issued 12 February 2008
Resolved
Replace gasket on newly installed emergency escape from the main space. Escape is located on the stbd side forward of the galley.
Due 30 April 2008
Resolved 28 April 2008
Resolution: Installed new gasket materal and cleaned knife edge
Construction/Loadline › Hull › Hull Plating
Issued 12 February 2008
Resolved
Make perminant repairs to the ballast tank leaking into the #4 cargo hold IWO hatch #16.
Action required: 705 - Other - as specified
Due 24 April 2008
Resolved 28 April 2008
Resolution: Repair approved by class see atachment "ABS_27MAR08"
Construction/Loadline › Hull › Hull Plating
Issued 12 February 2008
Resolved
Make permininat repairs to ballast tank leaking IWO hatch #15/16.
Action required: 705 - Other - as specified
Due 24 April 2008
Resolved 28 April 2008
Resolution: Repair approved by class see atachment "ABS_27MAR08"
Construction/Loadline › Hull › Hull Plating
Issued 12 February 2008
Resolved
Make perminant repairs to ballast tank leak in Port tunnel IWO Gate #45.
Action required: 705 - Other - as specified
Due 24 April 2008
Resolved 28 April 2008
Resolution: Repair approved by class see atachment "ABS_27MAR08"
Fire Fighting › Fire Main › Condition
Issued 12 February 2008
Resolved
Crop out and renew fractured fire main pipe located all the way forward on the stbd side.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Resolution: New valve and pipe installed and tested - sat.
Deck/Cargo › Holds/Tanks › Flame Arrester
Issued 12 February 2008
Resolved
Replace #7 fuel oil tank flame screen.
Due 30 April 2008
Resolved 28 April 2008
Resolution: Flame screen replaced
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 12 February 2008
Resolved
Install hand rails and machinery guards and add additional decking IWO belt in FWD Tunnel.
Due 1 May 2008
Resolved 28 April 2008
Resolution: hand rail and foot guarf installed port and stbd
Construction/Loadline › Structures › Deck Plating
Issued 12 February 2008
Resolved
Approximatley a 12'x12' section will need to be cropped out and reinstalled with new tank top plating IWO gate #37 out board of the cargo belt on the port side.
Action required: 705 - Other - as specified
Due 10 April 2008
Resolved 28 April 2008
Resolution: Repair approved by class see atachment "ABS_27MAR08"
Construction/Loadline › Structures › Deck Plating
Issued 12 February 2008
Resolved
Crop out and install new tank top plating IWO gates #32 and #43 out board of belt. This will require approximately a 12'x12' section.
Action required: 705 - Other - as specified
Due 10 April 2008
Resolved 28 April 2008
Resolution: Repair approved by class see atachment "ABS_27MAR08"
Electrical › Lighting (service) › Lighting Fixture
Issued 12 February 2008
Resolved
Replace all burnt out lights bulbs through out vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2008
Resolution: New lights installed.
Accommodation/Occupational Safety › Heating › Piping
Issued 12 February 2008
Resolved
Install lagging on port genset prime mover exhaust system.
Due 30 April 2008
Resolved 24 April 2008
Communications › Alarms/Indicators › General Alarm
Issued 12 February 2008
Resolved
Install red flashing light in main space and to be tied in with the general alarm system.
Due 30 June 2008
Resolved 30 June 2008
Resolution: removed from 835 list, vessel is not required to comply
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 12 February 2008
Resolved
Install additional emergency lighting through out vessel as existing emergency lighting is inadequate. Emergency lighting must last not less than 12 hours. 46CFR112.15(c).
Due 3 March 2009
Resolved 26 January 2010
Resolution: While reviewing MISLE and vessel records it was noted that the owners of McKEE SONS received a letter (dtd May 05, 2009) from Commandant granting their appeal to recind the original requirement issued by [name withheld] attached letter.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 12 February 2008
Resolved
Provide correct hydrostatic release for EPIRB.
Due 10 April 2008
Resolved 4 April 2008
Resolution: Corrected.
Construction/Loadline › Hull › Hull Plating
Issued 31 August 2007
Resolved
3" x 4" hole on portside of barge above the waterline
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 December 2007
Resolution: Received class report from 31AUG07 indicating that proper repairs had been completed.
Lifesaving › Inflatable Liferafts › Carriage Requirement
Issued 16 April 2007
Resolved
Provide means to manually launch fwd liferaft iaw 46CFR199.130
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 17 April 2007
Resolution: Bracket and hinge system installed to allow 2 members to launch raft over bulwark
Electrical › Electrical Distribution System (service) › Panelboard
Issued 16 April 2007
Resolved
Label A/C electrical panel board iaw 46CFR 111.40-11
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 30 May 2007
Resolution: Cleared by Sector Detroit, testified complete by [name withheld], Grand River Navigation Engineering Superintendent, [phone withheld]
Engineering › Diesel Engine (auxiliary) › Governor
Issued 16 April 2007
Resolved
Prior to use of 400 kW generator, repair leak at governor and demonstrate satisfactory test of low l/o and overspeed shutdowns iaw 46 CFR 58-05.10.
Action required: 705 - Other - as specified
Resolved 2 December 2007
Resolution: cleared
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 16 April 2007
Resolved
Prior to use of waste oil burning heater in machinery space, demonstrate satisfactory testing of safety alarms and shutdowns iaw 46 CFR 63.25-1.
Action required: 705 - Other - as specified
Resolved 2 December 2007
Resolution: cleared
Engineering › Pressure Vessel › Relief Valve
Issued 16 April 2007
Resolved
Prior to use of aft service air receiver, demonstrate satisfactory test of relief valve iaw 46 CFR 54.15-5(c).
Action required: 705 - Other - as specified
Resolved 2 December 2007
Resolution: cleared
Electrical › Electrical Distribution System (service) › Cable
Issued 16 April 2007
Resolved
Replace all non-approved wire clips (i.e., hose clamps, plastic ties) with metallic band strapping iaw 46 CFR 112.15-5 and IEEE-45 section 20.
Action required: 705 - Other - as specified
Due 16 May 2007
Resolved 30 May 2007
Resolution: Cleared by Sector Detroit, testified complete by [name withheld], Grand River Navigation Engineering Superintendent, [phone withheld]
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 16 April 2007
Resolved
Install approved fixed fire-fighting system for generator space iaw 46 CFR 95.05-10(e)(3)(ii)
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 29 March 2008
Resolution: FM200 system has been tested - sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 April 2007
Resolved
Remove all dead-end wires or place them in approved junction boxes with covers iaw 46 CFR 111.60-11, 111-60.17.
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 29 March 2008
Resolution: Dead end wires have been removed.
Electrical › Electric Generation Source (service) › Generator
Issued 16 April 2007
Resolved
Prior to use, provide required approved plans and demonstrate satisfactory testing for new generator in machinery space iaw 46 CFR 91.55-10.
Action required: 705 - Other - as specified
Resolved 24 June 2008
Resolution: corrected
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 16 January 2007
Resolved
Prior to departing Sturgeon Bay WI, for spring 2007 fit-out complete an annual COI re-inspection. Barge was not ready for an annual re-inspection as requested by company on 16Jan2007, system being disabled and 3 crewmembers on board.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 April 2007
Resolved 14 March 2007
Resolution: Deactivated COI since vessel is overdue for a satisfactory annual inspection. Once vessel completes winter repairs and is ready for inspection, a COI inspection will be conducted and a new COI issued.
Construction/Loadline › Hull › Hull Plating
Issued 16 March 2006
Resolved
Make side shell and frame repairs, port-side, #1 ballast tank caused by allision with mooring cell. Repairs are to be completed to the satisfaction of USCG Marine Inspector prior to departure.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 March 2006
Stability › Watertight Integrity › General
Issued 13 October 2005
Resolved
Properly adjust tunnel WTD to be watertight.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 27 October 2005
Resolution: Made tunnel watertight.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 13 October 2005
Resolved
Properly repair failed weld STBD outboard vertical bulkhead aft tunnel ballast tank.
Due 23 October 2005
Resolved 27 October 2005
Resolution: Replaced failed weld.
Stability › Watertight Integrity › General
Issued 13 October 2005
Resolved
Properly repair failed weld STBD inboard hopper shoots between gates 56/57 and 50/51.
Due 23 October 2005
Resolved 7 March 2025
Resolution: Replaced failed weld.
Stability › Watertight Integrity › General
Issued 13 October 2005
Resolved
Properly secure #3 port outboard fwd manhole gasket to ballast tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2025
Resolution: corrected
Engineering › Freshwater Generation System › Piping
Issued 13 October 2005
Resolved
Repair leak on hot water pipe in Bos'n locker.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 7 March 2025
Resolution: corrected
Electrical › Lighting (service) › Conductor
Issued 13 October 2005
Resolved
Cover exposed wires in conveyor work shop.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Covered exposed wires.
Electrical › Lighting (service) › Lighting Fixture
Issued 13 October 2005
Resolved
Repair/ replace light fixture in lower laundry room.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Replaced light fixture.
Stability › Weathertight Integrity › General
Issued 13 October 2005
Resolved
Replace vertical damaged frame in lower laundry room.
Action required: 705 - Other - as specified
Due 15 March 2006
Resolved 10 March 2006
Resolution: Made temporary repair to frame, will make permanent repairs during drydock.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 13 October 2005
Resolved
Place cover on electrical box in FWD hydraulic room.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Placed cover on electrical box.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 13 October 2005
Resolved
Clean and organize PA Amplifier room.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Cleaned out space.
Fire Fighting › Firemans Outfit › Axe
Issued 13 October 2005
Resolved
Paint vessel's name on all fire axes.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Painted vessels name on axes.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 13 October 2005
Resolved
Replace water light on all ring buoys with black U.V. protected light.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Placed black U.V protected light on all ring buoys.
Stability › Watertight Integrity › General
Issued 13 October 2005
Resolved
Replace gasket on water tight door located in anchor windlass room.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Replaced gasket.
Engineering › Fuel Oil Service System › Piping
Issued 13 October 2005
Resolved
Label direction of turn on remote fuel shut-off valves.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Labeled direction of remote shut offs.
Electrical › Electrical Distribution System (service) › Cable
Issued 13 October 2005
Resolved
Remove all plastic wire ties on cable runs and replace with metal ties.
Action required: 705 - Other - as specified
Due 15 March 2006
Resolved 10 March 2006
Electrical › Lighting (emergency) › Conductor
Issued 13 October 2005
Resolved
Replace burnt "E" lights on vessel.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Replaced the burnt light bulbs.
Lifesaving › Lifeboat › Markings
Issued 13 October 2005
Resolved
Replace painter line on FWD life raft.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Re painted line on FWD life raft.
Fire Fighting › Fire Hydrants › Condition
Issued 13 October 2005
Resolved
Paint deck wash/ fire main line red.
Action required: 705 - Other - as specified
Due 16 November 2005
Resolved 7 March 2025
Resolution: corrected
Electrical › Lighting (service) › Lighting Fixture
Issued 13 October 2005
Resolved
Provide light cover in laundry room.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Placed a light cover in laundry room.
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 13 October 2005
Resolved
Install missing blanks in circuit breaker boxes.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Placed missing blanks in breaker boxes.
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 13 October 2005
Resolved
Inactive electrical cable need to be plugged.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 7 March 2025
Resolution: corrected
Lifesaving › Lifebuoys › Serviceable
Issued 13 October 2005
Resolved
Replace broken life ring on STBD side of bridge.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 15 October 2005
Resolution: Replaced with a new life buoy.
Lifesaving › Lifejacket/PFD (Type II) › Lights
Issued 13 October 2005
Resolved
Replace/Repair two water lights on life jackets.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Replaced water light on life jackets.
Navigation › Piloting/Steering › Compass Deviation Table
Issued 13 October 2005
Resolved
Replace missing globes in state room and pilot house.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 22 October 2005
Resolution: Installed globes.
Electrical › Lighting (service) › Switch
Issued 13 October 2005
Resolved
Install missing passageway switch covers.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Installed covers.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 13 October 2005
Resolved
Replace expired medical items located through out the vessel.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Replaced expired medications.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 13 October 2005
Resolved
Place loose eye wash items in plastic bags.
Action required: 705 - Other - as specified
Due 23 October 2005
Resolved 22 October 2005
Resolution: Placed loose items in bag.
Electrical › Electric Supply System (service) › Cable
Issued 13 October 2005
Resolved
Trace complete electrical system of main space.
Action required: 705 - Other - as specified
Due 15 March 2006
Resolved 10 March 2006
Electrical › Electric Supply System (service) › Cable
Issued 13 October 2005
Resolved
Remove all electrical wire not in service.
Action required: 705 - Other - as specified
Due 15 March 2006
Resolved 10 March 2006
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 13 October 2005
Resolved
Label all electrical distribution panel breakers.
Action required: 705 - Other - as specified
Due 15 March 2006
Resolved 10 March 2006
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 13 October 2005
Resolved
Cumming's Rep. to attend and attest to operational capability of SSDG#1, SSDG#2 and emergency gen.
Action required: 705 - Other - as specified
Due 15 March 2006
Resolved 10 March 2006
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 13 October 2005
Resolved
Prove proper operation of all shutdowns and alarms.
Action required: 17 - Rectify deficiencies prior to departure
Due 23 October 2005
Resolved 7 March 2025
Resolution: corrected
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 October 2005
Resolved
Replace as orginal STBD feed hydro lines between gates 28/29.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 22 October 2005
Resolution: Replaced hydro line.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 October 2005
Resolved
Replace as orginal port feed hydro line between gates 42/43.
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 7 March 2025
Resolution: corrected
Electrical › Electric Supply System (service) › Cable
Issued 1 July 2005
Resolved
Inspect power cable support brackets in all cargo holds and submit repair proposal to repair/renew wasted support brackets. Installation of power cables shall be I.A.W. 46 CFR 111.60-5. Repair proposal to be submitted to this office prior to 08 JUL 2005.
Due 8 July 2005
Resolved 7 July 2005
Electrical › Electric Supply System (service) › Cable
Issued 1 July 2005
Resolved
Repair electrical power cable supports, in all cargo holds, as per Grand River Navigation repair proposal dated July 07, 2005. All repairs shall be completed prior to March 31, 2006.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 September 2016
Resolved 15 September 2016
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 4 October 2004
Resolved
Complete internal exam/hydro of all pressure vessels.
Action required: 705 - Other - as specified
Due 27 October 2004
Resolved 19 October 2004
Resolution: Conducted interrnal exam of ship service air receivers
Accommodation/Occupational Safety › Medical/First Aid
Issued 25 October 2002
Resolved
Replace outdated supplies in all First Aid kits.
Due 25 November 2002
Resolved 5 December 2002
Documentation › Logs/Records
Issued 25 October 2002
Resolved
Provide Maintenance Log for life saving equipment. LEGACY COMPONENT DESC: Logbook/Record (unofficial)
Due 25 November 2002
Resolved 25 October 2002
Communications › Alarms/Indicators
Issued 25 October 2002
Resolved
Provide General Alarm rotating beacon(s) for generator space and the lower engineroom space. LEGACY COMPONENT DESC: General Alarm
Due 25 November 2002
Resolved 5 December 2002
Communications › Alarms/Indicators
Issued 25 October 2002
Resolved
Provide a visual and audible alarm indicating the start up of the cargo unloading conveyor belt.
Due 25 November 2002
Resolved 5 December 2002
Construction/Loadline › Structures › Rake
Issued 14 September 2002
Resolved
Unable to complete ISE due to excess mud in ballast tanks 3,4,5, and 8, both port and stbd sides.
Action required: 705 - Other - as specified
Due 30 October 2002
Resolved 19 October 2004
Construction/Loadline › Hull
Issued 7 April 2002
Resolved
A 3 TO 4 FOOT FRACTURE WAS FOUND IN THE #8 BALLAST TANK IN WAY OF FRAME #197. VESSEL PERMITTED TO PROCEED TO SARINA, CANADA FOR REPAIRS. REPAIRS TO BE MADE TO THE SATISFACTION OF THE ATTENDING CLASS REPRESENTITIVE. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Due 9 April 2002
Resolved 9 April 2002
Resolution: Cropped and renew torn sideshell with approx. 15'''' X 2 1/2''''
Cleared by ABS via Report No. C16830 dtd 09Apr02.
Construction/Loadline
Issued 3 August 2001
Resolved
PRIOR TO DEPARTING THE VICINITY OF STONEPORT, [name withheld] ALL CARGO AND COMPLETE DAMAGE SURVEY TO THE SATISFACTION OF THE ATTENDING ABS SURVEYOR, AND PROVIDE PROOF OF SAME TO [name withheld], BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 3 August 2001
Resolved 3 August 2001
Construction/Loadline
Issued 3 August 2001
Resolved
PRIOR TO LOADING CARGO, MAKE PERMANENT REPAIRS TO HULL AND INTERNAL STRUCTURES TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR AND ABS SURVEYOR, TO BE COMPLETED IN STURGEON BAY, WI, BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 3 August 2001
Resolved 3 August 2001
Lifesaving
Issued 5 April 2001
Resolved
Install non-conductive matting in forward electrical control room.
Condition: Unknown
Due 5 April 2001
Resolved 5 April 2001
Documentation
Issued 5 April 2001
Resolved
Replace outdated CFR's with current editions.
Condition: Unknown
Due 5 April 2001
Resolved 5 April 2001
Lifesaving
Issued 5 April 2001
Resolved
Repair gas cylinder storage rack on aft deck, ensure cylinders are properlysecured.
Condition: Unknown
Due 5 April 2001
Resolved 5 April 2001
Lifesaving
Issued 5 April 2001
Resolved
Clean up and properly dispose of old bridge deck flooring that is presentlylaying out on bridge deck.
Condition: Unknown
Due 5 April 2001
Resolved 5 April 2001
Construction/Loadline
Issued 25 October 2000
Resolved
Provide documentation that lubricant being used on notch side pads is environmentally safe.
Condition: Unknown
Due 25 October 2000
Resolved 25 October 2000
Construction/Loadline
Issued 13 September 2000
Resolved
MAKE TEMP REPAIRS TO FRACTURE AND STIFFNER IN WAY OF #1 PORT BALLAST TANK SIDE SHELL.
Condition: Unknown
Due 14 September 2000
Resolved 21 September 2000
Accommodation/Occupational Safety
Issued 30 August 2000
Resolved
Install lint traps on all dryers that vent within the space.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
Make permanent repair IWO Temp Connection.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
Provide High J/W alarms for Gen sets.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
provide approved plans for Gen installation.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
Amend oil transfer Procedures.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
provide certificate of compliance from a certified asbestos abatement Company.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
R/R #2 steering pump selector switch.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
Replace damaged gauges IWO 45KW gen set
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
provide oil record book.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
provide proof of proper asbestos abatement.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 30 August 2000
Resolved
Make permanent repairs to tug MSD tank
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Electrical
Issued 30 August 2000
Resolved
Provide Caps on all J-box connections.
Condition: Unknown
Due 3 March 2001
Resolved 2 March 2001
Documentation
Issued 22 March 2000
Resolved
Provide approved plans from CG-MSC for structural modifications to notch.
Condition: Unknown
Due 22 March 2000
Resolved 22 March 2000
Accommodation/Occupational Safety
Issued 22 March 2000
Resolved
Bring aft berthing area into compliance with 46CFR92.07-10, Structural FireProtection.
Condition: Unknown
Due 22 March 2000
Resolved 22 March 2000
Electrical
Issued 22 March 2000
Resolved
Bring electrical system into compliance with 46CFR110 through 113._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 March 2000
Resolved 22 March 2000
Engineering
Issued 22 March 2000
Resolved
Bring generators prime movers exhaust systems into compliance with 46CFR58.10-10 and ABS 4/4.17.1
Condition: Unknown
Due 22 March 2000
Resolved 22 March 2000
Deck/Cargo
Issued 22 March 2000
Resolved
Repair or replace starboard anchor in kind.
Condition: Unknown
Due 22 March 2000
Resolved 22 March 2000
Electrical
Issued 31 March 1999
Resolved
INSTALL STARTING BATTERIES FOR 400 KW GENERATOR IN PROPER LINED BATTERY BOXBEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 March 1999
Resolved 31 March 1999
Construction/Loadline
Issued 31 March 1999
Resolved
REPACK THE PACKING GLANDS ON BOTH BALLAST PUMPS AND RELATED SEA SUCTIONS BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 31 March 1999
Resolved 31 March 1999
Construction/Loadline
Issued 9 March 1999
Resolved
POLLUTION PLACARD NOT POSTED IN WAY OF BILGE PUMP CONTROL OR OVERBOARD DICHARGE VALVE. CORRECTED DURING INSPECTION
Condition: Unknown
Due 15 March 1999
Resolved 15 March 1999
Fire Fighting
Issued 9 March 1999
Resolved
RENEW DOOR GASKET ON PAINT LOCKER DOOR AND PROVE PROPER FIT OF SAME BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Lifesaving
Issued 9 March 1999
Resolved
BOTH INFLATIBLE LIFERAFTS IMPROPERLY STOWED, WITH SEA PAINTER MADE FAST TO VESSEL, WEAKLINK BYPASSED, CORRECTED DURING INSPECTION.
Condition: Unknown
Due 15 March 1999
Resolved 15 March 1999
Electrical
Issued 9 March 1999
Resolved
REPAIR OR REPLACE VARIOUS LIGHTING GLOBES AND GUARDS IN ACCOMODATIONS AND WORK SPACES THROUGHOUT VESSEL, BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Electrical
Issued 9 March 1999
Resolved
PROVIDE PERMANENTLY INSTALLED BATTERY CHARGING SYSTEM ON STARTING BATTERIESFOR EMERGENCY GENERATOR, PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Electrical
Issued 9 March 1999
Resolved
PROVIDE PERMANENTLY INSTALLED CHARGING SYSTEM FOR GENERAL ALARM BATTERIES, PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Electrical
Issued 9 March 1999
Resolved
REPAIR AND PROVE PROPER OPERATION OF RELAY-OPERATED EMERGENCY LIGHTS IN WAYOF AFT ACCOMODATIONS AND WORK AREAS BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Electrical
Issued 9 March 1999
Resolved
CLEAN AND REMOVE ALL CORROSION FROM COMMUNICATIONS EMERGENCY BATTERIES IN WHEELHOUSE, BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Accommodation/Occupational Safety
Issued 9 March 1999
Resolved
PROVIDE PRESSURE RELIEF VALVES ON BOTH SHIP SERVICE AIR RECEIVERS AND RENEWTHOSE ON BOTH SHIP SERVICE AIR COMPRESSORS PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Lifesaving
Issued 13 March 1998
Resolved
Stencil vessel name on PFDs as noted.
Condition: Unknown
Due 13 March 1998
Resolved 13 March 1998
Engineering
Issued 13 March 1998
Resolved
Demonstrate operation of overspeed trip and hi J/W temp alarm on 400 KW genset.
Condition: Unknown
Due 13 March 1998
Resolved 13 March 1998
Fire Fighting
Issued 13 March 1998
Resolved
Demonstrate proper operation of fire pump(s) and pressurize all hoses to 120 psi.
Condition: Unknown
Due 13 March 1998
Resolved 13 March 1998
Documentation
Issued 13 March 1998
Resolved
Properly affix renewal decal to Certificate of Documentation.
Condition: Unknown
Due 13 March 1998
Resolved 13 March 1998
Lifesaving
Issued 13 March 1998
Resolved
Replace defective retro-reflective tape on PFDs as noted.
Condition: Unknown
Due 13 March 1998
Resolved 13 March 1998
Engineering
Issued 17 March 1997
Resolved
Demonstrate proper operation of high temperature, low lube oil pressure, and overspeed shutdowns on ship service generators.
Condition: Unknown
Due 17 March 1997
Resolved 17 March 1997
Fire Fighting
Issued 17 March 1997
Resolved
Demonstrate that all 100 pound CO2 bottles from forward paint locker and aft semi-portable extinguisher have been hydrostatically tested within past12 years.
Condition: Unknown
Due 1 April 1997
Resolved 1 April 1997
Documentation
Issued 17 March 1997
Resolved
Amend oil transfer procedures to incorporate specific "topping off" instructions.
Condition: Unknown
Due 17 March 1997
Resolved 17 March 1997
Fire Fighting
Issued 17 March 1997
Resolved
Demonstrate proper operation of the fire pump, and pressurize all firehosesto 120 psi.
Condition: Unknown
Due 1 April 1997
Resolved 1 April 1997
Engineering
Issued 17 March 1997
Resolved
Demonstrate proper operation of aft engine room pressure vessel relief valve.
Condition: Unknown
Due 17 March 1997
Resolved 17 March 1997
Unknown
Issued 13 December 1995
Resolved
Any further damage to this area is to be reported immediately to the nearest USCG Marine Safety Office.
Condition: Unknown
Due 13 December 1995
Resolved 13 December 1995
Unknown
Issued 13 December 1995
Resolved
Temporary repairs are to be re-evaluated by a USCG Marine Inspector and Classification Society prior to vessel operations in 1996.
Condition: Unknown
Due 13 December 1995
Resolved 13 December 1995
Unknown
Issued 13 December 1995
Resolved
Vessel is authorized to make a one way voyage from Bay City MI, to EscanabaMI for winter lay-up/permenant repairs.
Condition: Unknown
Due 13 December 1995
Resolved 13 December 1995
Unknown
Issued 13 December 1995
Resolved
Vessel personnel are to make hourly inspections of temporary repairs in wayof notch and log findings.
Condition: Unknown
Due 13 December 1995
Resolved 13 December 1995
Lifesaving
Issued 20 June 1995
Resolved
Replace outdated hydrostatic releases on both liferaft installations as required by 46CFR94.15-10(e) prior to the compliance date.
Condition: Unknown
Due 18 July 1995
Resolved 18 July 1995
Fire Fighting
Issued 20 June 1995
Resolved
Install a mounting bracket in the aft generator space for the hand portablefire extinguisher standing loose against the port bulkhead as required by 46CFR95.50-10(a) prior to the compliance date.
Condition: Unknown
Due 18 July 1995
Resolved 18 July 1995
Documentation
Issued 20 June 1995
Resolved
Provide records for 1994 describing the chemical testing program in place for crewmembers employed aboard the vessel as required by 46CFR16.260(a) prior to the compliance date.
Condition: Unknown
Due 20 June 1995
Resolved 20 June 1995
Lifesaving
Issued 20 June 1995
Resolved
Provide a copy of current servicing reports showing that both inflatable liferafts have been serviced at an approved facility within the past 12 months as required by 46CFR97.15-45(f) prior to compliance date.
Condition: Unknown
Due 20 June 1995
Resolved 20 June 1995
Documentation
Issued 20 June 1995
Resolved
Post the current stability letter in the pilothouse as required by 46CFR97.11-1 prior to the compliance date.
Condition: Unknown
Due 18 July 1995
Resolved 18 July 1995
Construction/Loadline
Issued 20 June 1995
Resolved
Renew the wasted gasket in the deck scuttle located on the port side aft ofgenerator space as required by 46CFR45.141 prior to the compliance date.
Condition: Unknown
Due 18 July 1995
Resolved 18 July 1995
Documentation
Issued 20 June 1995
Resolved
Update oil transfer procedures on vessel to include applicability; cargo info; line diagram of lube oil system; description/procedures for emptying containment, operating communications and emergency shutdown, and topping off tanks; and duties as required by 33CFR155.750 before compliance date.
Condition: Unknown
Due 20 June 1995
Resolved 20 June 1995
Fire Fighting
Issued 20 June 1995
Resolved
Replace the used dry chemical hand portable fire extinguisher located in the vicinity of the incinerator on the starboard side aft as required by 46CFR95.05-15(a) prior to the compliance date.
Condition: Unknown
Due 18 July 1995
Resolved 18 July 1995
Lifesaving
Issued 20 June 1995
Resolved
Repair holes between the fingers of three survival suits on board the vessel as required by 46CFR94.41-5(d)(2) prior to the compliance date.
Condition: Unknown
Due 18 July 1995
Resolved 18 July 1995
Construction/Loadline
Issued 20 June 1995
Resolved
Replace broken dogs on portlights located in port forward stateroom and messdeck as required by 46CFR45.135 prior to the compliance date.
Condition: Unknown
Due 20 June 1995
Resolved 20 June 1995
Engineering
Issued 20 June 1995
Resolved
Provide cover for open lubricating oil manifold portside aft as required by33CFR156.120(e) prior to compliance date.
Condition: Unknown
Due 18 July 1995
Resolved 18 July 1995
Documentation
Issued 20 June 1995
Resolved
Update the list of crewmembers to show current designation as a person in charge of oil transfer operations on board the vessel as required by 33CFR155.700 prior to the compliance date.
Condition: Unknown
Due 18 July 1995
Resolved 18 July 1995
Construction/Loadline
Issued 20 June 1995
Resolved
Replace the missing bolt in the portlight bracket in the port forward stateroom as required by 46CFR45.135 prior to the compliance date.
Condition: Unknown
Due 20 June 1995
Resolved 20 June 1995
Documentation
Issued 20 June 1995
Resolved
Modify the existing Declaration of Inspection forms to include spaces for both the date and time of signing of each person in charge during oil transfer operations as required by 33CFR156.150(c)(5) prior to the compliance date.
Condition: Unknown
Due 20 June 1995
Resolved 20 June 1995
Documentation
Issued 20 June 1995
Resolved
Ensure that all Declaration of Inspections completed for oil transfer operations to or from the vessel have been filled out completely as required by 33CFR156.150(a) prior to the compliance date.
Condition: Unknown
Due 18 July 1995
Resolved 18 July 1995