Records from 2004 to 2014. Most recent: inspection, 10 March 2014.
Inspection history · 8
10 March 2014
Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4813118
17 June 2012
ISPS II Exam · COC-CHEM Renew · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4346251
8 September 2010
COC-CHEM Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3844911
23 January 2009
COC-CHEM Renew · ISPS II Exam
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 3398700
24 April 2004
Ballast Water Examination · Administrative Inspection
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 2048177
7 February 2004
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2002199
5 February 2004
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2000853
5 February 2004
Certificate of Compliance
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2001185
Deck/Cargo › Holds/Tanks › Tank Pressure Monitoring Device
Issued 10 March 2014
Resolved
1899 - Tankers (other) - Pressure sensors may be fitted in each tank protected by the arrangement required in 6.1.2 with monitoring system in the ships CCR or position from which cargo ops are carried out. PSCO noted the pressure sensor to the #1S cargo tank not properly working. SOLAS 74 (09Cons.) II-2 / 11.6.3.2
Action required: 705 - Other - as specified
Due 24 March 2014
Resolved 26 March 2015
Resolution: Vessel provided approved report attesting to the proper operation of the #1S cargo tank pressure sensor.
Operations/Management › Drills/Instruction › Not Conducted
Issued 10 March 2014
Resolved
0999 - Safety in General (other) - Within 12 hours before departure, the ships steering gear shall be checked and tested by the ships crew. The test procedure shall include operation from the emergency power supply. Ship is not conducting tests prior to departure / arrival in accordance with SOLAS, 33 CFR 164.25 - SOLAS 74am Reg. V/26
Action required: 15 - Rectify deficiencies by next port
Resolved 26 March 2015
Resolution: Vessel provided approved test procedures, including logs to show tests are being performed prior to departure/arrival.
Electrical › Electric Generation Source (emergency) › Generator
Issued 10 March 2014
Resolved
2050 - Operations of Machinery- Where the emergency source of electrical power is a generator, it shall be capable of being auto started and supplying load to a max of 45 secs. When testing the Egen PSCO noted the Egen would not start from primary source as required. SOLAS 74 Cons. II-1 / 43
Action required: 705 - Other - as specified
Due 10 March 2014
Resolved 10 March 2014
Resolution: Crew replaced battery and demonstrated proper operation of Emergency Generator primary starting source in all modes.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 23 January 2009
Resolved
Fire door leading into bos'n hole does not close properly.
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 8 September 2010
Resolved 8 September 2010
Resolution: Door was properly repaired and tested to satisfaction of PSCO.
Deck/Cargo › Inert Gas System › Venting System
Issued 23 January 2009
Resolved
PV breaker gauge inoperative.
Condition: Unknown
Due 25 January 2009
Resolved 25 January 2009
Resolution: Corrected on-site.
Deck/Cargo › Ballast
Issued 26 April 2004
Resolved
Tank # 101 is shaft cooling water. The water is 2ppt. There was a quantity of 54.7 mt. The vessel was issued a retention letter and will be reboarded on its downbound voyage.
Due 5 May 2004
Resolved 3 May 2004
Resolution: Vessel boarded this date for ballast water re-exam. Tank #101 found to have been retained. Retention Letter dated 26 Apr 04 is recinded.
Deck/Cargo › Cargo Stowage › General
Issued 5 February 2004
Resolved
DURING INSPECTION VESSEL WITH NAPTHA CARGO HAD INERTED TANKS WITH OXYGEN CONTENT ABOVE 5%. MASTER TO FILE ISM NON-CONFORMITY WITH COMPANPY.
COAST GUARD SHOULD IN THE NEAR FUTURE REVIEW NON-CONFORMITY AND COMPANIES RESOLUTION
Action required: 15 - Rectify deficiencies by next port
Due 31 May 2004
Resolved 25 January 2009
Resolution: Cargo tanks inerted with oxygen content below 8%.