Inspection history · 42
4 May 2026
COC-CVE Annual · PSC A
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8358053
18 September 2025
COC-CVE Quarterly · PSC B
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8231295
29 April 2025
COC-CVE Annual · PSC A · Ballast Water Examination
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8117865
30 October 2024
PSC B · COC-CVE Quarterly
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8026144
13 May 2024
Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7911402
6 May 2024
COC-CVE Annual · PSC A
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7904769
5 June 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7720056
7 May 2023
PSC A · COC-CVE Annual
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7674691
2 May 2023
MARPOL Annex I Examination
Physical examination · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 7679726
14 July 2022
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7507853
8 June 2022
PSC A · COC-CVE Annual
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7467481
13 April 2021
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7175744
17 April 2020
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6953179
23 October 2019
ISPS II Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6840828
25 September 2019
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6820877
18 September 2019
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6851015
8 August 2019
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6791602
23 July 2019
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6762041
30 May 2019
COC-CVE Quarterly · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6673785
30 May 2019
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6703910
27 May 2019
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6698683
26 November 2018
Ballast Water Examination · ISPS II Exam · Deficiency Check · PII Safety Exam · COC-CVE Annual
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6583080
5 October 2018
MARPOL Annex I Examination
Physical examination · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 6558802
2 October 2018
ISM Exam · MARPOL Annex I Examination
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6553470
13 September 2018
ISM Exam · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6549445
22 June 2018
Deficiency Check
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 6455763
24 May 2018
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6428113
8 May 2018
Ballast Water Examination · ISPS III Exam · COC-CVE Quarterly
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6409467
23 April 2018
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6401085
9 March 2018
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6374520
29 December 2017
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6328720
2 December 2017
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6316801
24 November 2017
Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6308444
24 November 2017
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6313596
8 November 2017
COC-CVE Annual · PII Safety Exam · ISPS III Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6298139
21 February 2017
COC-CVE Quarterly · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6091886
4 February 2017
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6082765
24 December 2016
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6073143
24 September 2016
NPV Safety Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6008347
7 September 2016
PII Safety Exam · ISPS II Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5994522
13 August 2016
Periodic Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5971427
4 March 2016
COC-CVE Quarterly
Type not classified · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5827150
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 May 2026
Resolved
74 SOLAS 01 II-2/34.6 16C 07120
Furniture in stairway enclosures shall be limited to seating. It shall be fixed, limited to six seats on each deck in each stairway enclosure, be of restricted fire risk. Deck 9 aft stairwell had seats that were not fixed, deck A had trash cans and security scanner in midship stairwell.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 4 May 2026
Resolution: Vsl corrected prior to conclusion of exam.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 4 May 2026
Resolved
74 SOLAS 01 II-2/26.2.2 16C 07101
For determining the appropriate fire integrity standards to be applied to boundaries between adjacent spaces, such spaces are classified according to their fire risk as shown in categories (1) to (14) below. Where the contents and use of a space are such that there is a doubt as to its classification for the purpose of this regulation, it shall be treated as a space within the relevant category having the most stringent boundary requirements. The title of each category is intended to be typical rather than restrictive. The number in parentheses preceding each catgory refers to the applicable column or row in the tables. Deck 8 had items stored inside the technical space behind the false bulkhead.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 4 May 2026
Resolution: Vsl corrected prior to conclusion of exam.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 4 May 2026
Resolved
74 SOLAS 20 II-2/9.4.1.1.5.1 16C 07105
Fire doors in main vertical zone bulkheads, galley boundaries and stairway enclosures shall be self-closing and be capable of closing with an angle of inclination of up to 3.5° opposing closure. Fire doors FSD-0A.1.119, FSD 09.5.30, FSD 0A.3.47, FSD 0C6.06 did not close or latch.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 4 May 2026
Resolution: Vsl corrected prior to conclusion of exam.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 4 May 2026
Resolved
74 SOLAS 20 III/19.2.1 16AC 04110
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. Forward liferaft team demonstrated insufficient proficiency in the deployment of the liferaft. Assigned personnel were unable to execute deployment procedures without external assistance.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 18 May 2026
Resolution: Vsl provided proof of remedial training.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 4 May 2026
Resolved
74 SOLAS 20 III/19.2.1 16AC 04110
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. Stairwell guides in aft passenger stairway were unfamiliar with location of communication equipment.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 18 May 2026
Resolution: Vsl provided proof of remedial training.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 May 2026
Resolved
74 SOLAS 01 II-2/28.1.10 16C 07120
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300mm above the deck at all points of the escae route, including angles and intersections. The marking must enable passengers to identify the routes of escape and readily identify the escape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminescent material or marked by lighting. Backstage of the world theatere, low location lighting was obstructed by chairs.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 4 May 2026
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 May 2026
Resolved
74 SOLAS 01 II-2/28.1.5.3 16C 07120
Doorways and cooridors and intermediate landings included in the means of escape shall be sized the same manner as stairways. Shall not be less than 900mm in clear width, the minimum clear width shall be increased by 10mm for every one person provided for in excess of 90 persons. The escape route was obstructed by boxes, rendering the escape route less than 900mm in width.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 4 May 2026
Resolution: Vsl corrected prior to conlusion of exam.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 4 May 2026
Resolved
74 SOLAS III/11.4 16C 11124
Muster and embarkation stations shall be adequately illuminated by lighting supplied from the emergency source of electrical power required by regulation II-2/42 or II-2/43. 02 embarkation lights, starboard side lifeboat number 1 were extinguished.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 4 May 2026
Resolution: Vsl corrected prior to conlusion of exam.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 4 May 2026
Resolved
74 SOLAS 20 II-2/9.2.1.1.5.2 16C 07105
Fire doors in main vertical zone bulkheads, galley boundaries and stairway enclosures, the approximate time of closure for hinged fire doors shall be no more than 40s and no less than 10s from the beginning of their movement. Fore doors FSD 0A.1.117, FSD 03.2.78 closed in less than 10s.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 4 May 2026
Resolution: Vsl corrected prior to conlusion of exam.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 May 2026
Resolved
74 SOLAS 01 II-2/28.1.2 50AC 07120
Above the bulkhead deck there shall be at least two means of escape from each main vertical zone or similarly restricted space or group of spaces at least one of which shall give access to a stairway forming a vertical escape. On deck 3 the Shop Manager office does not have two means of escape.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2026
Resolved 18 May 2026
Resolution: Vsl provided proof of rectification via alarm in shop manager office.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 May 2026
Resolved
74 SOLAS 01 II-2/28.1.10 50BC 07120
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300mm above the deck at all points of the escae route, including angles and intersections. The marking must enable passengers to identify the routes of escape and readily identify the escape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminescent material or marked by lighting. In the casino, adjacent to the casino managers office, PSCO identified an exit routed marked by photoluminescent signage that remains obstructed by barricades.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2026
Resolved 18 May 2026
Resolution: Exit sign was installed in error and not required per vsl's plan.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 29 April 2025
Resolved
The activation of any detector or manually operated point call shall initiate a visual, and audible signal at the control panel and indicating units. if the signals have not received attention within 2 minutes an audible alarm shall be automatically sounded throughout the crew accommodation and service spaces, control stations and machinery spaces of category A. PSCO observed manual call point 203 did not activate upon testing at the bridge or locally. PSCO observed manual call point tested satisfactory. 74SOLAS 01, II-2/13.1.4
Action required: 10 - Deficiency Rectified
Resolved 29 April 2025
Resolution: Call point issue corrected. Tested again; all sat.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 6 May 2024
Resolved
The means of escape, including stairways and exits, shall be
marked by lighting or photoluminescent strip indicators
placed not more than 300 mm above the deck at all points of
the escape route, including angles and intersections. The
marking must enable passengers to identify the routes of
escape and readily identify the escape exits. Additionally,
escape route signs and fire equipment location markings
shall be of photoluminescent material or marked by lighting.
PSCO observed 40 m of low location lighting on A deck on
I-95 near engine control room, 10 m of photoluminescent
strip on A deck near aft provision area and 3 m of low location lighting on A deck near fwd break starboard side blocked by rubbish, parts and various crowd control equipment.
74 SOLAS 01 II-2/28.1.10
40c
Def Code: 07120
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 13 May 2024
Resolution: Sector Puget Sound received photographic evidence that rubbish, parts and crowd control equipment was removed. See documents tab for more information.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 May 2024
Resolved
The purpose of this regulation is to prevent the ignition of
combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: the ignitability of combustible materials shall be restricted;
PSCO observed secondary lint trap in main laundry had not
been cleaned per cleaning schedule and presented a fire
hazard.
74 SOLAS 01 II-2/4.1
10c
Def Code: 07199
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 6 May 2024
Resolution: Secondary lint filter cleaned.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 7 May 2023
Resolved
In the case of partially or totally enclosed lifeboats, retro-reflective materials should be placed on the bottom of lifeboats and rescue boats which are not self-righting in accordance with Resolution MSC.481(102). Nonself-righting lifeboats and tenders found without retrorelective tape on bottom.
74 SOLAS 20 III/34 LSA Code 1.2.2.7 50a
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 May 2023
Resolved 5 June 2023
Resolution: Received Class Report
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 7 May 2023
Resolved
Doors and door frames in "B" class divisions and means of securing them shall provide a method pf closure which shall have resistance to fire equivalent to that of that of divisions. B15 doors on deck 9 in the service cooridor adjacent to LFD 09.2.60 are damaged and failed to meet B15 closing standards.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 May 2023
Resolved 5 June 2023
Resolution: Received Class Report
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 30 May 2019
Resolved
Low location lighting shall be placed at all points of the escape path. LLL is absent in stairwell 12 which forms a means of escape from the storekeepers office.
Action required: 10 - Deficiency Rectified
Resolved 30 May 2019
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 30 May 2019
Resolved
Within the perimeter of such atairway enclosures, only public restrooms, lockers of non-combustible material providing storage for safety equipment and open information counters are permitted. Genie lift was stored in fwd crew stairwell on deck 1.
Action required: 10 - Deficiency Rectified
Resolved 1 June 2019
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 27 November 2018
Resolved
Each emergency generating set arranged to be started automatically shall be equipped with starting devices approved by the Administration with a stored energy capability of at least 3 consecutive starts. A second source of energy shall be provided for an additional 3 starts within 30 mins. The pneumatic starter for secondary means of starting emergency generator failed mechanically during testing/inspection and could not be repaired to provide required means of starting.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 January 2019
Resolution: Attended vessel and witnessed successful operation of EGEN starting functions via electrical and pneumatic means. Verified auto start function in pneumatic mode. All SAT.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 27 November 2018
Resolved
Fire doors in main vertical zones bulkheads and stairway enclosures shall be capable of closing in no more than 40 seconds. Numerous fire screen doors throughout the vessel did not fully close, in addition sliding fire screen doors on deck #2 and #3 (galley area) did not fully close. All were adjusted on the spot and found to be satisfactory after re-testing.
Action required: 10 - Deficiency Rectified
Resolved 27 November 2018
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 5 October 2018
Resolved
The Administration shall periodically verify the proper functioning of the ship's Safety Management System. Review and update transfer procedures implementing administrative and/or engineering controls to prevent future discrepancies with waste management record keeping, to include: ORB, Sounding Logs, Transfer Receipts, and other related documentation.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 5 November 2018
Resolved 11 March 2019
Resolution: The vessel's CE reviewed the SMS and updated the ORB entries and procedures. Vessel now requires EOOW and Engineering Officer conducting the operation to sign the ORB to increase oversight and reduce future mistakes.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Documentation-ISM
Issued 2 October 2018
Resolved
Each ship shall carry onboard all SMS documentation relevant to that ship. Records of maintenance conducted under the SMS were falsified by a 2nd engineer. 74 SOLAS (14) IX/3.1 ISM 11.3
Action required: 10 - Deficiency Rectified
Resolved 2 October 2018
Resolution: Maintenance records corrected.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 13 September 2018
Resolved
In the event of an emergency, accidental or other exceptional discharge of sewage or greywater, immediate notification of the discharge shall be made to the COTP. The vessel had an accidental discharge and failed to notify the COTP. - 33 CFR 159.315(d)
Action required: 10 - Deficiency Rectified
Resolved 13 September 2018
Resolution: Def issued then cleared for purpose of enforcement referral.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2018
Resolved
The condition of the ship and it's equipment shall be mainteaned to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. The forward REF panel for the starboard azipod is inoperable.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2018
Resolution: Received class report certifing complete repair.
Personnel › Training › Familiarization Training
Issued 8 May 2018
Resolved
2020 - Fire Drills - Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. Galley and liferaft crewmembers were not familiar with their assigned duties and equipment. - 74 SOLAS (14) III/19.2.1, 95 STCW Chap VI/Reg VI/3 - 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 24 May 2018
Resolution: Crewmembers re-interviewed by CG and found sat.
Fire Fighting › Means of Escape › Emergency Lighting
Issued 8 May 2018
Resolved
0999 - Other (Safety in General) - The means of escape shall be marked at all points of the escape route. The aft crew stair from Deck B to Deck A does not have continuous marking of the means of escape. - 74 SOLAS (01) II-2/28.1.10 - 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 8 May 2018
Resolution: Photoluminescent tape installed along bulkhead to mark escape route.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 8 May 2018
Resolved
0199 - Other (Certificate) - The vessel owner or operator must ensure that they maintain one English language copy oof the Vessel Response Plan and a copy of the Coast Guard approval letter onboard the vessel. The vessel does not have a copy of the VRP onboard. - 33 CFR 155.5030(g)(1) - 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 8 May 2018
Resolution: Shoreside office emailed vessel a copy of VRP for printing and saving in electronic form.
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 8 November 2017
Resolved
74 SOLAS (2001) II-2/33.1: THE WINDOW LOCATED IN THERAPY ROOM 4 ON DECK 9 HAS A 24" CRACK.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 December 2017
Resolved 4 January 2018
Fire Fighting › Structural - B Class Divisions › Cabin Doors
Issued 8 November 2017
Resolved
74 SOLAS (2001) II-2/3.4.1: CABIN A117 ENTRY DOOR HAS A 15MM HOLE COMPRIMISING INTEGRITY.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 November 2017
Resolved 24 November 2017
Resolution: peephole installed.
Communications › Internal Communications System › Voice Tube
Issued 8 November 2017
Resolved
74 SOLAS (2001) II-2/40.5: PA SPEAKER IN SALON OFFICE IS INOPERABLE.
Action required: 705 - Other - as specified
Due 24 November 2017
Resolved 24 November 2017
Resolution: repairs made.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 8 November 2017
Resolved
74 SOLAS (2001) II-2/28.1.1.0: GALLEY LOCATED ON DECK 2, PRIMARY MEANS OF ESCAPE SIGNAGE IS NOT CONSISTENT WITH FCP.
Action required: 705 - Other - as specified
Due 8 December 2017
Resolved 28 December 2017
Resolution: Class survey report submitted attesting to proper installation of escape exit signage.
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 8 November 2017
Resolved
74 SOLAS (2001) II-1/45.1.3: THERMAL DETECTOR IN MENS SAUNA HAS EXPOSED WIRING.
Action required: 705 - Other - as specified
Due 8 November 2017
Resolved 8 November 2017
Resolution: 10C
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 8 November 2017
Resolved
74 SOLAS (2014) III/10.5: CREW NOT FAMILIAR WITH TEMP ABANDON SHIP PROCEDURES SET IN PLACE FOR INOP TENDER.
Action required: 705 - Other - as specified
Due 8 November 2017
Resolved 8 November 2017
Resolution: 10C
Operations/Management › Drills/Instruction › Abandon Ship
Issued 8 November 2017
Resolved
74 SOLAS (2001) II-2/28.1: ROOM-IN-ROOM ARRANGEMENT IN THE MAITRE DE OFFICE, DECK 2, THAT DOES NOT PROVIDE IMMEDIATE AND CLEAR NOTIFICATION OF A FIRE IN THE SURROUNDING SPACE.
Action required: 705 - Other - as specified
Due 24 November 2017
Resolved 24 November 2017
Resolution: recieved class report clearing def.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 5 March 2016
Resolved
0730 - Fire fighting appliances shall be maintained ready for use. 04 fire fighting extinguishers in the engine room and 01 fire fighting extinguisher in the Lido deck pantry had inspection seals missing. 74SOLAS(14) CH.II-2/14.1
Action required: 705 - Other - as specified
Resolved 5 March 2016
Resolution: Corrected on the spot