Records from 2004 to 2012. Most recent: inspection, 24 July 2012.
Documentation record
Registered dimensions (L × B × D)31.0 ft × 10.5 ft × 6.0 ft
Registered tonnagegross 13 / net 10
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCOMMERCIAL WATER SPORTS, INC · CLERMONT, NJ, UNITED STATES · built 2004
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portORANGE BEACH, AL
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationExpired · issued 8 December 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it10 - Simplified, Net Ton
13 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
24 July 2012
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4389158
16 February 2012
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4245715
19 January 2012
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4229750
29 December 2011
Simplified Stability Test
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4208343
9 December 2011
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4206285
9 December 2010
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3910609
23 December 2009
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3653971
18 February 2009
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3420136
11 December 2008
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3378034
19 March 2008
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3175169
30 March 2007
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2900031
12 March 2007
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2891636
5 March 2007
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2881765
13 September 2006
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2777536
6 March 2006
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2596521
21 November 2005
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2538486
7 February 2005
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2290658
20 December 2004
Initial Certification
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2262278
20 September 2004
Construction Oversight · Plan Review "T" Boat · Simplified Stability Test
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2263331
Stability › Watertight Integrity › Weathertight Enclosure
Issued 9 December 2010
Resolved
Make engine room hatch watertight.
Condition: Improper/Lack of Maintenance
Due 7 January 2011
Resolved 17 March 2011
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 9 December 2010
Resolved
Provide insulation of the appropriate type between accomodation and machinery spaces.
Condition: Design Flaw
Due 7 January 2011
Resolved 17 March 2011
Navigation › Emergency Steering › Communications to Emergency Steering
Issued 9 December 2010
Resolved
Provide means for emergency steering, this should remain onboard at all times and the crew must be proficient in its use,
Condition: Design Flaw
Due 7 January 2011
Resolved 17 March 2011
Communications › Radio Communications › EPIRB
Issued 23 December 2009
Resolved
EPIRB hydrostatic release expired. Vessel not allowed to operate until new hydrostatic release is configured to EPIRB
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 December 2009
Resolved 23 December 2009
Fire Fighting › Remote Fuel Shutoff › General
Issued 23 December 2009
Resolved
Remote fuel shut-off for the stbd fuel tank did not operate properly; handle that is connected to reach rod that shuts off fuel from remote closure was blocked by a bilge pump hose
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 December 2009
Resolved 23 December 2009
Operations/Management › Equipment Service/Testing › EPIRB
Issued 23 December 2009
Resolved
Alternate 24 hr POC phone number listed on EPIRB registration for notification was incorrect. Alternate POC phone number to be updated with NOAA.
Action required: 705 - Other - as specified
Due 23 January 2010
Resolved 27 January 2010
Engineering › Bilge Water Management System › Hose
Issued 19 March 2008
Resolved
Replace hose on the vessel's portable bilge pump.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 April 2008
Resolved 19 March 2008
Resolution: Company purchase new hose for portable bilge pump.
Fire Fighting › Remote Fuel Shutoff › General
Issued 19 March 2008
Resolved
Re-stencil emergency fuel shutoff label.
Due 19 April 2008
Resolved 21 March 2008
Resolution: Company re-stenciled emergency fuel shut off label
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 12 March 2007
Resolved
Provide and mount one additional B-II portable fire extinguisher on board vessel.
Due 2 April 2007
Resolved 30 March 2007
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 5 March 2007
Resolved
Provide 1 additional child lifejacket. Until it has been placed in service, vessel is restricted to 10 total passengers.
Due 12 March 2007
Resolved 12 March 2007
Fire Fighting › Remote Fuel Shutoff › General
Issued 5 March 2007
Resolved
Re-stencil emergency fuel shutoffs label and emergency instructions label.
Due 12 March 2007
Resolved 12 March 2007
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 5 March 2007
Resolved
Re-stencil name of vessel on ring buoy.
Due 12 March 2007
Resolved 12 March 2007
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 5 March 2007
Resolved
Renew audible alarm for fixed fire extinguishing system.
Due 12 March 2007
Resolved 12 March 2007
Construction/Loadline › Structures › Superstructure
Issued 5 March 2007
Resolved
Repair cracks in welds on arch.
Due 19 March 2007
Resolved 12 March 2007
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 6 March 2006
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE ORIGINAL CERTIFICATE OF DOCUMENTATION.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 March 2006
Resolved 13 March 2006
Documentation › Certificates/Documents › FCC SSL
Issued 6 March 2006
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE COPY OF FCC RADIO STATION LICENSE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 March 2006
Resolved 13 March 2006
Documentation › Logs/Records › Logbook (official)
Issued 6 March 2006
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE ALL OFFICIAL LOG BOOKS FOR THE VESSEL.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 March 2006
Resolved 13 March 2006
Fire Fighting › Fire Bucket › Quantity
Issued 6 March 2006
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE TWO (2) ADDITIONAL FIRE BUCKETS IN ACCORDANCE WITH 46 CFR 181.610
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 March 2006
Resolved 13 March 2006
Electrical › Electric Supply System (service) › Battery Installation
Issued 6 March 2006
Resolved
PRIOR TO CARRYING PASSENGERS, RENEW ALL PROPULSION ENGINE STARTING BATTERIES AS PER ENGINE MANUFACTURER'S SPECIFICATION.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 March 2006
Resolved 13 March 2006
Documentation › Certificates/Documents › FCC SSL
Issued 20 December 2004
Resolved
PROVIDE FCC SAFETY RADIOTELEPHONY CERTIFICATE.
Action required: 705 - Other - as specified
Due 24 January 2005
Resolved 7 February 2005
Communications › Radio Communications › EPIRB
Issued 20 December 2004
Resolved
PROVIDE PROOF OF EPIRB REGISTRATION.
Action required: 705 - Other - as specified
Due 24 January 2005
Resolved 7 February 2005
Lifesaving › Lifebuoys › Stowage
Issued 20 December 2004
Resolved
ENABLE RING LIFE BUOY INSTALLATION FOR RAPID DEPLOYMENT.
Action required: 705 - Other - as specified
Due 4 January 2005
Resolved 7 February 2005