Records from 2011 to 2025. Most recent: inspection, 13 August 2025.
Documentation record
Registered dimensions (L × B × D)31.0 ft × 10.5 ft × 6.0 ft
Registered tonnagegross 13 / net 10
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCOMMERCIAL WATER SPORTS INC · CLERMONT, NJ, UNITED STATES · built 2005
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portORANGE BEACH, AL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 May 2025 · expires 30 June 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it13 - Simplified, Gross Ton
10 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 5
13 August 2025
Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8209355
1 March 2024
Drydock Exam · COI Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7979582
26 May 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7700695
7 April 2022
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7426276
23 March 2022
Administrative Inspection · Drydock Exam · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7417501
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 August 2024
Resolved
Shutoff valves, installed so as to close against the
fuel flow, must be fitted in the fuel supply lines... At
time of inspection, fuel shut off valves were operable,
but port side shut off rotated too far, allowing valve
to open past closure. Shutoff valve to be adjusted such
that it closes fully without reopening when operated.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 September 2024
Resolved 4 September 2024
Resolution: Stop installed to keep fuel shutoff valve from rotating past closed position.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 21 August 2024
Resolved
A visual indicator must be provided at the operating
station to indicate when any automatic bilge pump is
operating. Aft remote bilge operation light not
functioning with activation of aft bilge pump. Bilge
pump operable. Vessel owner and deckhands to repair light and observe space for water intrusion between voyages until repaired.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 September 2024
Resolved 4 September 2024
Resolution: Bilge pump lights repaired and operational.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 21 August 2024
Resolved
Each watertight bulkhead must be of sufficient strength
to be capable of remaining watertight with a head of
water to the top of the bulkhead. Engine room forward
hatch/ through-hull penetrations not sealed. Vessel owner to seal 03 through-hull penetrations to watertight.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 September 2024
Resolved 4 September 2024
Resolution: Through-hull penetrations sealed satisfactorily.
10 - Safety of Navigation › N/A - No Subsystem › GNSS receiver/terrestrial radio navigation system
Issued 21 August 2024
Resolved
All GMDSS equipment capable of transmitting an automatic
distress alert which includes position of the ship must
have an integral navigation receiver or capability of being connected to an external navigation receiver.
Radio GPS non-functioning at time of inspection. To be amended.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 September 2024
Resolved 4 September 2024
Resolution: Radio GPS repaired, FCC license updated from tech.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 August 2024
Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. Vessel is overdue for drydock as of 01APR2024 and restricted from operating until satisfactorily completed.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 19 August 2024
Resolved 21 August 2024
Resolution: Completed satisfactory drydock and COI inspections.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 31 March 2024
Resolved
A vessel to which this subchapter applies may not be operated without having on board a valid USCG Certificate of Inspection. Vessel is overdue for annual inspection and restricted from operating until COI is satisfactorily completed.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 August 2024
Resolution: Completed satisfactory drydock and COI inspections.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 April 2022
Resolved
Ring life buoy must be fitted with a lifeline and be of at least 60 feet in length. Lifeline on ring buoy was shorter than 60 feet. Replace with correct length lifeline.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 April 2022
Resolution: Photo evidence rcvd new life ring line installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 April 2022
Resolved
Vessel is required to have one 10 B:C and one 40 B:C fire extinguisher. Missing 40 B:C fire extinguisher. Provide require number of fire extinguishers installed in the correct bracket.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 April 2022
Resolution: Photo evidence rcvd new fire extinguisher provided
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 7 April 2022
Resolved
Bilge pumps used for separate spaces must have a light or other visual means at the control point to indicate operation. Bilge visual indicator at operating station was not operating. Repair bilge visual indicator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 April 2022
Resolved 22 April 2022
Resolution: Video rcvd of bilge visual indicator in operation.