Records from 2005 to 2026. Most recent: inspection, 13 January 2026.
Inspection history · 50
13 January 2026
COI Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8295533
17 November 2025
Hull Examination · Drydock Extension · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8269698
8 January 2025
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8060024
23 November 2024
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8042703
8 October 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8016347
25 November 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7848621
24 October 2023
Periodic Inspection · Internal Structural Exam · MTSA Verification · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7802883
12 October 2022
MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7575865
19 January 2022
Bulk Liquid Transfer Monitor
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7382486
27 October 2021
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7340499
14 July 2021
Bulk Liquid Transfer Monitor
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7255686
5 November 2020
COI Inspection · Administrative Inspection · Cargo Tank Internal · Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7089454
9 December 2019
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6869972
19 September 2019
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6816032
13 September 2019
Examination of Repairs · Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6811126
28 November 2018
Deficiency Check · Periodic Inspection · Administrative Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6588034
5 February 2018
Annual Inspection · MTSA Verification · MARPOL Annex I Examination · MARPOL Annex II Examination · MARPOL Annex IV Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6349462
12 December 2016
MARPOL Annex VI Survey · Annual Inspection · MTSA/ISPS Verification · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6056608
3 October 2016
Damage Survey · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6015107
11 March 2016
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5831589
23 November 2015
MTSA Verification · COI Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5767941
21 October 2015
Cargo Tank Internal · Internal Structural Exam · Construction Oversight · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5746356
3 December 2014
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5033383
12 June 2014
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4886644
15 March 2014
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4817242
11 February 2014
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4798536
19 November 2013
Internal Structural Exam · COI Inspection · Periodic Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4755229
23 July 2013
MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4662650
5 June 2013
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4662279
29 November 2011
Annual Inspection · MTSA Verification · SIP Inspection/Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4197318
6 September 2011
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 4137095
22 December 2010
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3911745
23 November 2010
Hull Examination · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3897398
19 March 2010
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3698566
19 July 2009
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3540488
15 January 2009
MTSA Verification · Annual Inspection · SIP Inspection/Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3393817
15 October 2008
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3345292
29 May 2008
Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3220962
6 December 2007
SIP Initial Entry
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3176075
9 November 2007
MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3094693
29 August 2007
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3042103
16 August 2007
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3033466
8 May 2007
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2924977
8 May 2007
SIP Initial Entry
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3176012
5 April 2007
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2902853
6 March 2007
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2883373
20 October 2006
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2821995
12 July 2006
SIP Initial Entry
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3175951
18 November 2005
Hull Examination · Initial Certification · MTSA Verification · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2566333
23 September 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2499507
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 22 January 2026
Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station. Cargo pump was inoperable at the time of inspection and could not test. Test shutdown prior to
cargo operation using stbd pump.
46 CFR 32.50-35(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2026
Resolution: Witnessed successful operation of Cargo pump and shutdown.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 22 January 2026
Resolved
The last 1.0 meter (3.3 feet) of vapor piping upstream of the vessel vapor connection and each end of a vapor hose must be, Painted in the sequence of red/yellow/red. MI Observed at the time of inspection the vapor piping system was not painted correctly.
46 CFR 39.2001(h)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2026
Resolved 27 January 2026
Resolution: Witness properly painted VCS Line.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 January 2025
Resolved
(a) An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts.
Vsl had a ground in it's distribution panel located fwd of the gen room. The source of the grounded seem to be the accommodation house panel.
Vsl is required to fix/repair the ground and supply CG with a tech report identifying the issue and what was done to resolve the ground.
46 cfr 111.05-3
16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2025
Resolved 15 January 2025
Resolution: Tech report received. No indication of ground fault found, however fuse for ground detection panel light was out.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 25 November 2023
Resolved
All tank vessels, the construction or conversion of which is started on or after July 1, 1951, shall conform to the requirements in this subpart in construction of hulls.
46 CFR 32.60-1 (a)
Action required: 705 - Other - as specified
Resolved 30 November 2023
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 24 October 2023
Resolved
Thermal fluid was not ready for inspection. Make repairs to thermal fluid heater in accordance with manufacturer's instructions prior to carrying heated cargo.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 November 2023
Resolved 1 December 2023
Resolution: Thermal fluid heater properly tested
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 October 2023
Resolved
In generator room, light bulb was out on the 220v distribution ground detector. Make repairs in accordance with manufacturer's instructions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 November 2023
Resolved 28 November 2023
Resolution: Witnessed corrected item.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 October 2023
Resolved
Grabline on aft lifebuoy was deteriorating and needed replacement.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 November 2023
Resolved 28 November 2023
Resolution: Witnessed corrected item.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 27 October 2021
Resolved
High/overfill alarm system is inoperable
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 October 2021
Resolution: Barge was able to prove proper operation prior to completion of the inspection.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 October 2021
Resolved
Portable fire extinguisher located in the generator space is out of service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 December 2019
Resolved
STBD cargo pump was inoperative due to repairs. Repair starboard cargo pump and conduct satisfactory operational test including emergency shutdown prior to cargo operations.
Action required: 705 - Other - as specified
Resolved 13 December 2019
Resolution: Received video showing proper operation of satisfactory emergency shutdown
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 10 December 2019
Resolved
Identified the starboard vapor line manifold extension is not fitted with a stud, and the outermost flange had a stud located at the bottom. Install studs at the topmost position of the vapor line.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 December 2019
Resolution: Recieved picture showing stud installed at top-center position.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 December 2019
Resolved
Ring buoy waterlight aft of accommodation house was inoperative. Repair or replace waterlight. Vessel limited to daytime operations.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 December 2019
Resolution: Received video showing operating waterlight.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 December 2019
Resolved
Identified unsecured thermal fluid heater alarm wiring on top of the machinery house. Repair alarm or secure loose wiring.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 December 2019
Resolution: Wiring secured
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 December 2019
Resolved
Identified the breaker index for both the 120V and 240V distribution panels in the machinery house did not match the installed breakers. Verify breakers installed are IAW the approved electrical drawings.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 December 2019
Resolution: Indexes for both panels updated to include spare breakers installed in panel.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 December 2019
Resolved
Electrical conduit junction boxes above the #2 cargo tanks to be repaired as discussed.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 December 2019
Resolution: New covers installed on junction boxes.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 December 2019
Resolved
Identified wire shielding for the deck light cable above the accommodation house has slid down and is no longer attached to the cable termination. Correctly attach cable to the light fixture
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 December 2019
Resolution: renewed wire junction into light so shielding reaches all the way to fixture.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 December 2019
Resolved
Identified caps not installed on port cargo pump engine RACOR filters. Install caps on RACOR filter.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 December 2019
Resolution: Cap installed on RACOR filter
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 December 2019
Resolved
Hydrostatic release for EPRIB does not have the expiration date marked. Mark expiration date on hydrostatic release label.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 December 2019
Resolution: Expiration date marked
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 10 December 2019
Resolved
Crew was unable to provide documentation showing completion of quarterly MTSA drills. Crew conducted satisfactory drills during inspection.
Action required: 10 - Deficiency Rectified
Resolved 10 December 2019
Resolution: Conducted satisfactory security drill during inspection.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 13 September 2019
Resolved
Cargo discharged from the #3 port cargo tank PV valve and sprayed onto the deck as well as the #3 starboard cargo tank PV valve. Remove the PV valves and bench test to the satisfaction of an attending marine inspector.
Action required: 705 - Other - as specified
Resolved 13 September 2019
Resolution: Tested new PV valves and received picture of the installation.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 13 September 2019
Resolved
The #3 port cargo tank high level alarm was not functioning properly. Provide a technician report attesting to the satisfactory condition of all high level and overfill alarms prior to loading cargo.
Action required: 705 - Other - as specified
Resolved 13 September 2019
Resolution: Received technician report attesting to the removal of an intermittent relay switch. Installed new relay switch and tested sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 13 September 2019
Resolved
Received report from the vessel company that oil had spilled during cargo operations. Identify and correct cause of spill prior to cargo operations
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 September 2019
Resolution: Attended vessel and cleared deficiency.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 28 November 2018
Resolved
Replace cargo ullage gaskets and ensure they are seated properly to the satisfaction of an attending CG marine inspector. Barge is restricted from cargo operations unless flame screens are installed on each ullage or there is a senior crew member supervising the openings IAW 46 CFR 35.30-10.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2018
Resolution: Replaced ullage gaskets; all sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 November 2018
Resolved
Replace the port cargo pump emergency shutdown wire and prove proper shutdown to the satisfaction of an attending CG marine inspector. The barge is restricted to only using the starboard cargo pump until the deficiency is rectified IAW 46 CFR 32.50-35.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2018
Resolution: Tested shutdown; all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 November 2018
Resolved
Replace all wasted hydraulio line valve handles and cargo pump gauge valve handles IAW 46 CFR 56.20-9(a).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2018
Resolution: Replaced 22 valve handles; all sat.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 28 November 2018
Resolved
Repair cracked weld on a longitudinal frame located in the #2 port ballast tank in the 2nd bay forward of the aft ladderwell IAW 46 CFR 31.10-21 during next drydock availability.
Action required: 705 - Other - as specified
Resolved 5 January 2021
Resolution: Repaired during DDX
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 28 November 2018
Resolved
Repair cracked weld on the bent transverse frame located in the #3 port ballast tank in the 2nd bay aft of the fwd ladderwell IAW 46 CFR 31.10-21 during next drydock availability.
Action required: 705 - Other - as specified
Due 5 January 2021
Resolved 5 January 2021
Resolution: Repaired during DDX.
Engineering › Pressure Vessel › Relief Valve
Issued 19 November 2013
Resolved
Vessel must prove proper operation of the relief valve on the air receiver. Extended due date from 20DEC2013 to 20JAN2014.
Action required: 705 - Other - as specified
Due 20 January 2014
Resolved 10 March 2014
Resolution: Witnessed the testing of the relief valve. Relief valve popped off at the prescribe pressure that is on the data plate of the relief valve.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 19 November 2013
Resolved
Vessel must replace welding cable in all battery installations with shipboard marine grade cable. Extended due date from 20DEC2013 to 20JAN2014.
Action required: 705 - Other - as specified
Due 20 March 2014
Resolved 8 May 2014
Resolution: Installed battery cable onboard the vessel was not replaced with Marine Shipboard Cable. Cable will need to be replaced with Marine Shipboard Cable at such time when cognizant OCMI determines cable is no longer in satisfactory condition.
Construction/Loadline › Hull › Hull Plating
Issued 19 November 2013
Resolved
Complete work list items from ISE dated 19NOV2013. Prior to credit dry dock.
Due 30 November 2015
Resolved 30 November 2015
Construction/Loadline › Hull › Hull Plating
Issued 15 October 2008
Resolved
Provide permanent repairs to port quarter aft rake area at next scheduled dry dock, nlt 30Nov2010. Conduct periodic internal exams of the area to ensure temp. repair is sat.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 November 2010
Resolved 15 December 2010
Resolution: Permanent repair made to port quarter aft rake; all sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 18 November 2005
Resolved
NOTE: SYSTEM IS A DRY CHEMICAL system that has not been approved for Marine use. Had been authorized in the past by local OCMI. Issued requirement for vessel owners to obtain Marine Safety Center approval for use of non-approved fixed dry chemical system located in machinery space.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 9 April 2006
Resolved 9 October 2007
Resolution: Letter dated 19 Apr 1999 from MSC approved the system.