Records from 2005 to 2025. Most recent: inspection, 27 February 2025.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJEFFBOAT LLC · JEFFERSONVILLE, IN, UNITED STATES · built 2005
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 February 2026 · expires 31 March 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Gross Ton
735 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
27 February 2025
Bulk Liquid Transfer Monitor
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8085811
23 March 2023
Hull Examination · Deficiency Check · COI Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7641300
27 February 2019
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6635000
7 March 2018
COI Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6375435
17 May 2017
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6235662
22 February 2016
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5831473
2 April 2015
Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5094732
23 March 2015
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5089098
22 April 2014
Damage Survey
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4847632
11 April 2014
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4863574
18 November 2013
Deficiency Check · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4749581
22 October 2013
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4739076
22 October 2013
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4739702
27 April 2012
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4296794
27 June 2011
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4059306
30 August 2010
Administrative Inspection
Administrative · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3837923
3 May 2010
COI Inspection · MTSA Verification · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3725303
24 March 2009
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3436959
5 June 2008
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3185607
3 July 2007
Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2974896
21 June 2006
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2687072
16 May 2005
Hull Examination · MTSA Verification · Cargo Tank Internal · Internal Structural Exam · Initial Certification
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2358924
9 February 2005
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2289464
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 23 March 2023
Resolved
Pumps or other acceptable means shall be used to discharge cargo from gravity type cargo tanks vented at gauge pressures of 4 pounds per square inch or less. The vessels cargo pump prime mover is not installed on the vessel. Install prime mover, complete operational test for leaks and operational test of the remote manual shut down to the satisfaction of an attending Marine Inspector.
The vessel is restricted from cargo operations until this 835 is satisfied.
46 CFR 32.50-3(a)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 March 2023
Resolved 8 May 2023
Resolution: Objective evidence provided for the installation and testing.
Construction/Loadline › Hull › Hull Plating
Issued 30 April 2014
Resolved
Bow center kevel pulled from deck, make permanent repairs.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 June 2014
Resolved 2 April 2015
Construction/Loadline › Hull › Hull Plating
Issued 22 October 2013
Resolved
Proceed directly to repair facility and make permanant repairs to the 20' x 8' x 5' damage/hole in the headlog and bow. NO FURTHER CARGO OPERATIONS ARE AUTHORIZED.
Action required: 705 - Other - as specified
Resolved 18 November 2013
Resolution: Witnessed air testing and observed welds and internal repairs. Cleared CG-835.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 21 June 2006
Resolved
Prove proper operaton of the emergency shutdown on the cargo pump engine.
Due 28 June 2006
Resolved 22 June 2006