Records from 2005 to 2022. Most recent: inspection, 25 February 2022.
Documentation record
Registered dimensions (L × B × D)46.1 ft × 17.9 ft × 4.6 ft
Registered tonnagegross 34 / net 23
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHUMBOLDT BOAT SERVICE · ST LOUIS, MO, UNITED STATES · built 1959
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 June 2026 · expires 31 July 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it34 - Regulatory (Subpart C or D), Gross Ton
23 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 8
25 February 2022
Deficiency Check · Initial Certification · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7402003
12 December 2021
TPO Audit
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7385581
25 February 2015
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5074609
11 February 2015
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5074541
3 May 2013
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4585367
14 June 2012
Industry Initiated Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4342752
29 October 2009
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3624765
6 May 2005
Administrative Inspection
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2350817
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 April 2022
Resolved
Each towing vessel must carry at least one appropriately-sized lifejacket, approved under approval series 160.002, 160.005, 160.055, 160.155, or 160.176, for each person on board. Three PFDs were found missing. Vessel is limited to seven persons total until corrected.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: Sufficient numbers of PFDs were onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 April 2022
Resolved
Each lifebuoy with a floating electric water light must have a lanyard of at least 910 millimeters (3 feet) in length, but not more than 1,830 millimeters (6 feet), securing the water light around the body of the lifebuoy. The starboard lifebuoy water light lanyard is badly deteriorated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: Lanyard replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 April 2022
Resolved
At least one lifebuoy must have a lifeline, secured around the body of the lifebuoy. If more than one lifebuoy is carried, at least one must not have a lifeline attached. Both ring buoys are fitted with life lines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: One life line removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2022
Resolved
All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquid, as those terms are defined in 46 CFR subpart 30.10, into the machinery space. The generator windings were found saturated in oil.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: Windings have been cleaned.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 April 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions.
Both propulsion engines have numerous oiled areas; however, no active leaks noted.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: Engines were wiped down and no apparent leaks exist.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 April 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions.
Starboard engine return fuel hose was found to be badly deteriorated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: Hose was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2022
Resolved
Each remote fuel valve control must be marked in clearly legible letters, at least 25 millimeters (1 inch) high, indicating the purpose of the valve and the way to operate it. The fuel shut down sign is incorrect. Sign indicates for port engine; however, remote pull shuts down fuel to all three engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: Shutdown pulls properly labeled.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 5 April 2022
Resolved
A 40-B portable fire extinguisher must be located near the storage room or cabinet.Fire extinguisher not located in vicinity of flammable materials storage, port main deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: Portable fire extinguisher located near flam locker.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 5 April 2022
Resolved
The frame or support of any semi-portable fire extinguisher fitted with wheels must be welded or otherwise permanently attached to a steel bulkhead or deck to prevent it from rolling under heavy sea conditions. 160:B semi portable fire extinguisher not properly secured to vessel and required to move to a location where hose can better access all points in engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: Extinguisher properly secured.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 5 April 2022
Resolved
Rails or equivalent protection must be installed near the periphery of all decks accessible to crew. Equivalent protection may include lifelines, wire rope, chains, and bulwarks that provide strength and support equivalent to fixed rails. Large areas of the vessel have no handrails.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 19 May 2022
Resolution: Handrails were added.