Records from 2005 to 2021. Most recent: inspection, 26 July 2021.
Inspection history · 16
26 July 2021
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7268091
26 July 2021
Deficiency Check · Administrative Inspection · COC-TVE Renew · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7268298
23 January 2019
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6619606
1 June 2018
Deficiency Check · ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6424338
30 May 2018
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6429499
29 February 2016
Deficiency Check · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5823768
3 February 2016
Ballast Water Examination · COC-TVE Renew · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5808590
10 August 2014
COC-TVE Renew · ISPS II Exam · Ballast Water Examination · COE-Offshore
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4949630
5 August 2014
COE-Offshore
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4945150
1 December 2011
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4199633
5 October 2010
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3863538
30 July 2009
COC-TVE Annual · ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3550947
11 July 2008
MARPOL Annex I Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3266392
21 September 2006
Ballast Water Examination · COC-TVE Annual · ISPS II Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2783010
23 June 2005
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2429460
20 June 2005
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2419472
14 - Pollution Prevention › 141 - MARPOL Annex I › Load, unload & clean proc. for cargo sp.(tankers)
Issued 26 July 2021
Resolved
14120 - Load, unload & clean proc. for cargo sp. (tankers) - Each tank ship with VCS must be fitted with a pressire sensing device that activates a high pressure alarm when the pressure of not more than 90% of the lowest pressure relief valve setting. The breather valve was the lowest pressure relief valve setting. The breather valve was the lowest pressure relief valve and has a setting of 1200. Alarm set point was found at 1260mmWG. Alarm set point was adjusted. Relevant manuals and plans should be amended to the changes. 33 CFR 155.750(d) and 46 CFR 39.2013.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 August 2021
Resolution: Vessel provided revised VECS manual amending the new setting of 1080 mm wg (90%of the beather valve) Class approved and will endorse the manual during the next Class attendance.
Electrical › Lighting (service) › Lighting Fixture
Issued 1 June 2018
Resolved
No electrical equipment shall be installed in any space where flammable mixtures are liable to collect including those on board tankers unless the adminnistration is satisfied that such equipment is of a type which will not ignite the mixture concerned and appropriate to the space concerned.
PSCOs observed 24 of 29 explosion proof lighting in the cargo pump room and 2 of 2 explosion proof lighting in SOPEP locker with cracks in housing, compromising the integrity of the fixture.
74 SOLAS (04 cons) II-1/45.10
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 July 2018
Resolution: Vessel provided recipts and pictures of lighting fixtures being replace. Class attended vessel and found lighting fixtures to be satisfactory
Deck/Cargo › Cargo Stowage › General
Issued 1 June 2018
Resolved
The tank overfill alarm required by paragraph (g) of this section must activate a visual and audible alarm so that it can be seen and heard on the vessel where cargo transfer is controlled. PSCO observed #4S cargo tank was filled exeeding the overfill set point for the tank with no visual or audio alarms indicating within the cargo control room.
46 CFR 39.2007(d)(3)
Action required: 10 - Deficiency Rectified
Resolved 1 June 2018
Resolution: Vessel's electrician adjusted overfill alarm set point (i.e. magnetic reed switch) and #4S cargo tank overfill alarm is now activated.
Documentation › Manuals/Policy Documentation › Cargo/Ballast System Instruction Manual
Issued 1 June 2018
Resolved
Instructions as to the operation of system (ODME) shall be in accordance with an opperational manual approved by the Administration. Ship's ODME manual is not approved by current flag state (Singapore) or RO (LR). It is only approved by previous class society/RO (ABS).
MARPOL I/31.4
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2018
Resolved 1 July 2018
Resolution: Vessel provided class report approving previous ODME manual under LR and updating IOPP form B.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 1 June 2018
Resolved
In tankers of 20,000 DWT and above, the protection of cargo tanks shall be achieved by a fixed inert gas system in accordance with the requirements of the FSS Code. For inert gas systems of both the flue gas and IGG type (vessel has IGG) audible and visual alarms shall be provided to indicate [.9] high gas pressure.
PSCOs requested to witness test of high gas pressure alarm as part of IGG checks. It took approxamately 2 hours for the ship to deminstrate the high gas pressure audible and visual alarm.
74SOLAS (04 cons) II-2/4.5.5.1.1 ref. 2007 FSS 15.2.4.3.1.9
Action required: 10 - Deficiency Rectified
Resolved 1 June 2018
Resolution: Ship's crew was able satisfactorily demonstrate the alarm prior to completion of exam.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 6 February 2016
Resolved
0660: All lifesavig appliances shall comply with the applicable requirements of the Code. An adult lifejacket shall be constructed that a method of securing the lifejacket to the wearer has a quick and positive means of closure that do not require tying of knots. Vessel's lifejackets are constructed so that the method of securing requires tying of knots. 74SOLAS(14)III/34/LSA/2.2.1.5.4 / 40b
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 February 2016
Resolution: PSC Miami received Lloyds report stating as per Res. MSC 81(70) the vessel is authorized to keep current life jackets onboard as long as they remain suitable for service. Deficiency is rectified.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Location
Issued 10 August 2014
No resolution recorded
0725- After any survey of the ship under regulations 7, 8, 9, or 10 has completed, no change shall be made. Ship's secondary fixed fire fighting hypermist system found inoperable in machinery space. Submit class report prior to departure. 74SOLAS(09Cons)I/11(b)
Action required: 705 - Other - as specified
Due 30 September 2014 — due date passed with no resolution recorded
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 30 July 2009
Resolved
Port State Control Officers discovered oily rags placed in the vicinity of the #1cargo pump mechanical seal, which raised doubts with regards to the proper operation of the pump. This equipment must be properly tested to the satisfaction of the attending marine inspector or port state control officer. The Ships Master has agreed not to operate the #1cargo pump until deficiency has been rectified.
Action required: 705 - Other - as specified
Due 6 August 2009
Resolved 6 August 2009
Resolution: The vessel submitted a declaration from Master stating that on the 3rd and 4th of August 2009, the #1 cargo pump was overhauled, mechanical seals replaced, and pump tested and found in good working condition.