Inspection history · 42
15 July 2025
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8163252
30 April 2025
Cargo Tank Internal · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8123256
29 October 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8025861
19 July 2023
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7747313
22 June 2023
MTSA Verification · Periodic Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7720556
28 July 2022
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7518742
27 July 2021
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7269753
11 August 2020
MTSA Verification · COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7029368
17 June 2020
Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6979687
6 December 2019
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6868614
5 November 2019
MTSA Verification · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6850048
29 July 2019
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6766372
9 October 2018
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6572042
18 October 2017
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6290349
30 January 2017
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6080126
26 October 2016
Cargo Tank Internal · MTSA Verification · Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6027194
10 December 2015
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5778833
12 September 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5717967
14 August 2015
Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5216003
2 July 2015
Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5170575
8 May 2015
Cargo Tank Internal
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5155816
19 March 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5089884
17 February 2015
Load Line/Change of Employment
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5070047
29 October 2014
MTSA Verification · Periodic Inspection · Deficiency Check · Administrative Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5013827
1 April 2014
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4826868
25 January 2014
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4789782
8 January 2014
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4778751
11 October 2012
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4462005
2 December 2011
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4200412
3 November 2011
Internal Structural Exam · Administrative Inspection · Deficiency Check · COI Inspection · Plan Review (Other than "T")
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4181468
22 December 2010
Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3914688
15 October 2010
Examination of Repairs · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3872102
7 October 2010
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3907121
24 March 2010
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3702832
18 December 2008
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3381729
13 November 2007
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3097388
24 August 2007
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3037055
1 February 2007
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 2865657
4 January 2007
COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2849921
20 December 2006
Administrative Inspection · Load Line/Change of Employment
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2843767
30 November 2006
Cargo Tank Internal · Internal Structural Exam · Construction Oversight · Hull Examination · Initial Certification · MTSA Verification
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 2831419
1 November 2006
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2812378
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 15 July 2025
Resolved
...all rotating machinery capable of injurying personnel must be provided with adequate covers or guards. Observed 02 exhaust fans in the thermal fluid heater space and 01 exhaust fan in the generator space with no protective casings or guards with rotating fan blades.
46 CFR 32.35-1
46 CFR 58.01-20
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 August 2025
Resolution: Received photo evidence of rectification.
04 - Emergency Systems › N/A - No Subsystem › Safe areas
Issued 22 June 2023
Resolved
Electric installations on vessels must ensure:
(1) Maintenance of services necessary for safety under normal and emergency conditions.
Number 2 generator appears to be missing an e-stop. Provide evidence accordingly
46CFR111.01-1
Prior to Cargo Operations
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 June 2023
Resolved 23 June 2023
Resolution: Vessel sent attached evidence of e-stop repair
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2023
Resolved
Electric installations on vessels must ensure:
(1) Maintenance of services necessary for safety under normal and emergency conditions.
Air Receiver's contactor was found faulty and requires repair.
Prior to Cargo Operations
46CFR111.01-1
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 29 June 2023
Resolved 23 June 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2023
Resolved
All safety and relief valves for use on pressure vessels or piping systems shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the “maximum allowable working pressure” of the pressure vessel or piping system.
No gauge to tell what pressure the air receiver is relieving at.
Prior to Cargo Operations
46CFR54.15-10
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 29 June 2023
Resolved 23 June 2023
Resolution: Vessel submitted evidenve of repair.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 22 June 2023
Resolved
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society.
A pinhole was found in the goose neck vent pipe that requires temporary repair.
46 CFR 32.60-1
Prior to Cargo Operations
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 29 June 2023
Resolved 25 June 2023
Resolution: Repair on pinhole has been effected as discussed previously.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 28 July 2022
Resolved
replace all gaskets on void spaces
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2022
Resolved 26 August 2022
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 28 July 2022
Resolved
33 cfr 83.20, make nav lights functional and intrinsically safe.
Action required: 705 - Other - as specified
Due 28 July 2022
Resolved 29 July 2022
Resolution: prior to carrying cargo of a flash point 140 degrees or below.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 28 July 2022
Resolved
46 cfr 111.105-31/17- make all connections within the hazardous zone intrinsically safe.
Action required: 705 - Other - as specified
Due 28 July 2022
Resolved 29 July 2022
Resolution: Prior to carrying cargo of a flash point 140 degrees or below vessel must make all connection within the hazardous zone intrinsically safe.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 11 August 2020
Resolved
Stations in the maritime service must be licensed by the FCC either individually or by fleet.
Vessel's radio station was not licensed.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 August 2020
Resolution: Proof of valid certificate received.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 August 2020
Resolved
On all tank vessels, cargo pumps shall be designed and installed as to minimize the possibility of sparking.
Oil was leaking near the turbo mount on the port aft cargo pump engine.
Rectify prior to using pump during operations.
Action required: 705 - Other - as specified
Resolved 12 August 2020
Resolution: Gasket was changed and no leak was discovered while running the engine.
Construction/Loadline › Penetrations › Gasket
Issued 26 October 2016
Resolved
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams shall be at least equivalent to the requirements of the American Bureau of Shipping. During the inspection several of the gaskets for the hatches on the void spaces were found deteriorated or missing. 46 CFR 32.60-1(a)
Action required: 705 - Other - as specified
Due 9 November 2016
Resolved 7 November 2016
Resolution: Rep sent shipping papers for replacement gaskets for void hatches. Cleared.
Electrical › Electric Generation Source (service) › Generator
Issued 26 October 2016
Resolved
Each generator prime mover must have an overspeed device that is independent of the normal operating governor and adjusted so the speed cannot exceed the maximum rated speed by more than 15%. Each prime mover must shut down automatically upon loss of lubricating pressure to the generator bearings if the generator is directly coupled to the engine. 46 CFR 111.12-1
Action required: 705 - Other - as specified
Due 2 November 2016
Resolved 2 November 2016
Resolution: Witnessed lube oil and overspeed shutdowns on (01) of the generators.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 10 December 2015
Resolved
Cargo pump relief valves shall be tested at least once each year to determine that they function satisfactorily at the pressure at which they are set to open. Relief valve tests were overdue. Test and provide documentation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 January 2016
Resolved 31 December 2015
Resolution: Received test report.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 10 December 2015
Resolved
Cargo pump pressure gage shall be tested at least once a year for accuracy. Cargo pump pressure gage tests were overdue. Test and provide documentation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 January 2016
Resolved 31 December 2015
Resolution: Received calibration receipt.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 10 December 2015
Resolved
There must be ground detection for each power or lighting system that is isolated from the ship's service power. Ground detection lights were burned out at the 240-V distribution panel (barge house) and at the 120-v panel (generator room). Replace bulbs in kind and verify functionality of ground detection unit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 January 2016
Resolved 18 December 2015
Resolution: Verified ground detection is working properly.
Construction/Loadline › Hull › Girder
Issued 2 July 2015
Resolved
NAW01 Make proper permanent repairs to buckled web in fwd stbd rake to satisfaction of CG MI
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 July 2015
Resolution: Web crop & renew satisfactory.
Construction/Loadline › Hull › Bottom Plating
Issued 2 July 2015
Resolved
NAW02: Make proper permanent repairs to inset in bottom plating on stbd void #1 2nd bay fwd from aft manhole to satisfaction of CGMI.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 July 2015
Resolution: Insert plate in bottom plating was installed.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 October 2014
Resolved
Complete ISE work list items dated 10/29/2014 prior to next credit drydock on 06/30/2015.
Due 30 June 2015
Resolved 13 July 2015
Resolution: ISE items completed at Philly Shipyard
Engineering › Pressure Vessel › Relief Valve
Issued 28 October 2014
Resolved
The markings shall be IAW this chapter for devices covered by 46 CFR 54.15-10. The relief device on the pressure vessel is not marked with its MAWP. 46CFR 54.15-1(b).
Due 12 November 2014
Resolved 19 December 2014
Resolution: Vessel provided documentation showing that they received a new pressure relief valve and conducted a satisfactory test.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 8 January 2014
Resolved
Vessel must ensure the 120v panel on the main switchboard has operable ground detection. Provide electricians report, identifying cause and resolution to the electrical problem. 46CFR111.05-21
Must be corrected prior to operating in Restricted Vis.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2014
Resolution: The technician found that an improperly installed retaining screw on the pauluhn plug which fed the light caused a bond between one leg and the ground.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 8 January 2014
Resolved
Vessel must show proper operation of emergency manual shutdown on FWD STBD engine. 46CFR32.50-35
Prior to using pump for cargo ops.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 January 2014
Resolution: Witnessed operational testing of emergency shutdown of the forward starboard cargo pump. Satisfactory test completed.
Electrical › Lighting (service) › Lighting Fixture
Issued 8 January 2014
Resolved
Vessel must ensure that all stern lights and all anchor lights are operational. 33CFR83.24(e)(2) & 33CFR83.30(a)
Prior to operating in restricted vis.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2014
Resolution: GME provided report stating that navigation lights are operational and burning brightly.
Electrical › Lighting (service) › Lighting Fixture
Issued 8 January 2014
Resolved
Ensure all deck lights are operational and provide electrician report addressing ongoing light failure.
Condition: Improper Installation
Due 8 February 2014
Resolved 9 January 2014
Resolution: Vessel deck lights are all energized and burning brightly. Vessel is going to change out deck lighting configuration to LED type lights which is more durable and better suited for that particular barge.
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 January 2014
Resolved
Remove unused electrical wiring and inop battery chargers in machinery space (electrical hazard). 46CFR111.60-11
Condition: Improper Installation
Due 8 February 2014
Resolved 9 January 2014
Resolution: GME provided documentation showing the removal of old battery chargers that was creating a electrical hazard. Battery chargers and wiring have been removed from machinery space.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 8 January 2014
Resolved
240v panel in crew quarters does not have ground detection after the transformer. Submit plans to Marine Safety Center for review and install approved ground detection system. 46CFR111.05-21. Extended due date from 08FEB to 31MAR.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2014
Resolved 1 April 2014
Resolution: Inspected satisfactory repairs completed IAW MSC Plan Review.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 November 2011
Resolved
Provide plans to replace/install heat tape on overboard grey water line to remove temporary extension cord.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 30 November 2011
Resolved 17 November 2011
Resolution: Witnessed proper installation of electrical wiring to heat tape on gray water tank.
Electrical › Electric Generation Source (service) › Generator
Issued 3 November 2011
Resolved
Provide technician to conduct overspeed and low lube oil trips on generators.
Action required: 705 - Other - as specified
Due 31 January 2012
Resolved 2 December 2011
Resolution: The generators are not equipped with overspeed devices. A 6 month grace period has been granted by Cargo Branch [name withheld].
Construction/Loadline › Hull › Side Shell
Issued 15 October 2010
Resolved
C/R inset in the #3 starboard wing tank from seam to seam where damaged between bay #1 and bay #2 as discussed with the vessel representative and to the satisfaction of an attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 15 November 2010
Resolved 10 November 2010
Resolution: Visually inspected and witnessed pressure test of the affected area. the repair was performed IAW NVIC 7-68
Construction/Loadline › Hull › Transverse Frame
Issued 15 October 2010
Resolved
C/R damaged transverse web frame between bay #1 and bay #2 in the #3 starboard wing tank from above ssl #5 to the bilge knuckle as discussed with the vessel representative and to the satisfaction of an attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 15 November 2010
Resolved 10 November 2010
Resolution: Visually inspected and witnessed pressure test of the affected area. The repair was performed IAW NVIC 7-68.
Construction/Loadline › Hull › Transverse Frame
Issued 15 October 2010
Resolved
C/R damaged transverse web frame between bay #2 and bay #3 in the #3 starboard wing tank from above SSL #5 to the bilge knuckle as discussed with the vessel representative and to the satisfaction of an attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 15 November 2010
Resolved 10 November 2010
Resolution: Visually inspected and witnessed pressure test of the affected area. The repair was performed IAW NVIC 7-68.
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 October 2010
Resolved
C/R damaged SSL #5 and SSL #6 in #3 starbaord wing tank from Bay #1 to Bay #3 as discussed with the vessel representative and to the satisfaction of an attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 15 November 2010
Resolved 10 November 2010
Resolution: Visually inspected and witnessed pressure test of the affected area. The repair was performed IAW NVIC 7-68.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 1 February 2007
Resolved
The approved VRP for this T/B does not list approval for COTP Zone NY. The VRP approval letter dtd 18 Dec 06 did not include COTP Zone NY. The POC at Harley Marine Service contacted the VRP program regarding add zone COTP NY revisions received on 31 Jan 07. The revision is under review and will be completed within a 3-4 week period. (Reference VRP control #02409, Correspondence log.)
Due 1 March 2007
Resolved 13 November 2007
Resolution: Provided.
Deck/Cargo › Holds/Tanks › Portable Gas Measuring Equipment
Issued 4 January 2007
Resolved
Provide proof of combustible gas indicator onboard prior to manned operations
Due 3 February 2007
Resolved 5 January 2007
Resolution: Received copy of receipt for purchase of CGI meter and test gas
Electrical › Electric Generation Source (service) › Generator
Issued 4 January 2007
Resolved
Provide proof of operation of second generator prior to manned operations
Due 3 February 2007
Resolved 5 January 2007
Resolution: Received statement from port engineer attesting to proper operation of second engineer
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 30 November 2006
Resolved
Provide proof of cargo pump engine wiring harness and alternator meeting 46 CFR 111.105-31(l) N.E.C. class 1 / division 1 as per USCG D8(m) policy letter 02-2005 NLT 31AUG07.
Action required: 705 - Other - as specified
Due 31 August 2007
Resolved 24 August 2007
Resolution: Using guidance from MSC memorandum witch stated five options for vessel to become compliant. Cargo authority was change restricting the vessel to grade "D" cargos with aflashpoint of 140 degrees and higher, and also grade "E" cargos.