Records from 2005 to 2025. Most recent: inspection, 20 October 2025.
Documentation record
Registered dimensions (L × B × D)105.8 ft × 64.5 ft × 9.0 ft
Registered tonnagegross 173 / net 139
ITC dimensions (L × B × D)105.8 ft × 64.5 ft × 9.0 ft
ITC tonnagegross 440 / net 132
BuilderHALIMAR SHIPYARD LLC · MORGAN CITY, LA, UNITED STATES · built 2006
Hull materialSteel
PropulsionDiesel
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationExpired · issued 2 October 2006
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it440 - Convention (Subpart B), Gross Ton
173 - Regulatory (Subpart C or D), Gross Ton
132 - Convention (Subpart B), Net Ton
139 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 29
20 October 2025
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8255443
2 January 2025
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 8076287
21 November 2024
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 8039843
15 February 2024
Periodic Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7866273
7 February 2024
Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7862327
19 January 2023
Deficiency Check
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7626230
17 January 2023
Annual Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7622790
20 January 2022
Deficiency Check
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7383377
18 January 2022
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7376951
9 December 2021
Hull Examination · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7364594
14 January 2021
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7124304
7 November 2019
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6859201
6 November 2019
Deficiency Check · Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6851550
26 September 2019
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6822126
17 January 2019
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6611450
22 February 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6359437
12 January 2018
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6338305
14 November 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6306440
4 November 2016
Drydock Exam · MTSA Verification · COI Inspection · Internal Structural Exam · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6035367
19 January 2016
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5803542
10 January 2011
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3922619
23 February 2009
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3422363
29 December 2008
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3372299
19 July 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3295866
22 January 2008
MTSA Verification · Re-Inspection · Ballast Water Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3134069
26 October 2006
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2819833
26 October 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2839515
2 October 2006
MTSA Verification · Initial Construction-Excluding Oversight · Ballast Water Examination · Administrative Inspection · Initial Certification · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2791655
15 August 2005
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3139609
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 January 2023
Resolved
Liftboat jacking systems are vital systems and must comply with Sections 4/1.13.1 through 4/1.13.3 of the ABS's “Rules for Building and Classing Mobile Offshore Drilling Units” as well as meet the applicable requirements of part 128 of this subchapter. Aft leg gear rack approx 50' from pad showed a missing tooth. Vessel and shipyard to repair. 46 CFR 134.150(a).
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 January 2023
Resolution: Damaged rack on aft leg was cropped out and renewed.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 17 January 2023
Resolved
Except as provided for liftboats by § 134.180 of this sub chapter, each fitting, flange, valve, and run of piping must meet the applicable requirements of part 128 of this subchapter. Piping must be Hot-dip galvanized; at least extra-heavy schedule; or of a suitable corrosion-resistant material. Port main deck fire station stand pipe was temporarily repaired due to wastage. Vessel to renew section of piping and test at max working pressure for leaks. 46 CFR 132.110(a).
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 January 2023
Resolution: Firemain pipe on port fire station was repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 January 2022
Resolved
Lifebuoys must have the following attachments and fittings: At least one lifebuoy on each side of the OSV fitted with a buoyant lifeline that is - (A) At least as long as twice the height where it is stowed above the waterline in the lightest seagoing condition, or 30 meters (100 feet), whichever is the greater. Both lifebuoys on the port and starboard side (02 deck) had lifelines less than 50'. Vessel shall install proper length lifelines prior to departure.46CFR133.70(a)(4)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2022
Resolution: Life rings lines were replaced with line throwing bag/line of adequate length.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 January 2022
Resolved
Electrical equipment on a vessel must be designed, installed, and maintained to protect crew members, offshore workers, and the vessel from electrical hazards. Outlet installed in port side crew cabin was cracked and showed evidence of failure/burning. Vessel shall make necessary repairs to return outlet to safe condition prior to departure. 46CFR129.200(b)
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2022
Resolution: Outlet was replaced.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 18 January 2022
Resolved
At least one abandon-ship drill each 3 months must be held at night, unless the master determines it unsafe. Vessel was not conducting abandon ship drills at night. Vessel shall incorporate nightly drills into schedule as required by regulation. 46CFR131.530(b)(9)
Action required: 10 - Deficiency Rectified
Resolved 20 January 2022
Resolution: Next abandon ship drill will be completed at night.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 January 2021
Resolved
Seven fuel filter bowls on the MDE's, SSDG's and Crane engines need to be changed to the approved metal type.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2021
Resolved 20 January 2021
Resolution: Replaced fuel filter bowls.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 14 January 2021
Resolved
Port air reciever gauge had the improper range.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 14 February 2021
Resolved 14 January 2021
Resolution: Gauge was replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 14 January 2021
Resolved
Painters on two of the three lifeboat installations were rigged incorrectly.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 14 January 2021
Resolved 14 January 2021
Resolution: Vsl corrected the improperly rigged painters during the inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 January 2021
Resolved
Two of the Vsls lifebuoys had lights that did not operate
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 14 January 2021
Resolution: Replaced both lifebuoy lights.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 14 January 2021
Resolved
Retro was worn and needed to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 14 January 2021
Resolved 14 January 2021
Resolution: Replaced retro.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 November 2019
Resolved
Each vessel must be equipped with at least two operable, portable, battery-powered lights. One of these lights must be located in the pilothouse, another at the access to the engine room. Portable flashlight was missing in pilothouse.
46 CFR 129.450
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 November 2019
Resolved 7 November 2019
Resolution: Portable light was provided in the pilothouse.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 6 November 2019
Resolved
The group of life floats must not be stowed in more than four tiers. When stowed in tiers, the separate units must be kept apart by spacers. Spacers between the life floats were missing. 46 CFR 133.130(c)(3)
(iv)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 November 2019
Resolved 7 November 2019
Resolution: Spacers for life floats were installed.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 6 November 2019
Resolved
Valves installed on the outside of oil tanks must be arranged with a means of remote control from a readily accessible and safe location outside of the compartment in which the valves are located. Remote fuel shutoff for the port fuel tank required repair to make operational. 46 CFR 56.60-50(d)(1)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2019
Resolution: Remote valve handle attachment was repaired.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 6 November 2019
Resolved
Vent outlets from all tanks which may emit flammable or combustible vapors must be fitted with a single screen of corrosion-resistant wire of at least 30 by 30 mesh, or two screens of at least 20 by 20 mesh spaced not less than one-half inch nor more than 1 1/2 inches apart. Vessel's flammable/combustible tank vent screens were not installed correctly allowing exposed gaps in the vent pipe.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 November 2019
Resolution: Flame screens were installed correctly.
Lifesaving › Hand Flares › Approval
Issued 19 January 2016
Resolved
Equipped with handheld flares versus required rocket parachutes
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 January 2016
Resolved 20 January 2016
Resolution: Placed correct signals onboard
Lifesaving › Rescue Boat › Propulsion Engine
Issued 29 December 2008
Resolved
Perform maintenance on rescue boat engine as per manufacturers maintenance procedures
Due 29 January 2009
Resolved 13 January 2009
Communications › Public Address System › Amplifier
Issued 29 December 2008
Resolved
Demonstrate proper operation of PA on Emergency Power.
Due 29 January 2009
Resolved 13 January 2009