Records from 2006 to 2023. Most recent: inspection, 18 October 2023.
Documentation record
Registered dimensions (L × B × D)60.0 ft × 26.0 ft × 8.0 ft
Registered tonnagegross 83 / net 66
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSNEED SHIPBUILDING INC · ORANGE, TX, UNITED STATES · built 2006
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 13 September 2025 · expires 31 October 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it83 - Simplified, Gross Ton
66 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 31
18 October 2023
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7810601
24 April 2023
Administrative Inspection · Initial Certification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7674713
21 January 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7128105
5 November 2020
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7090098
5 November 2020
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7090159
4 August 2018
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 6500610
23 August 2017
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 6250341
29 July 2015
Industry Initiated Exam · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5200090
14 November 2013
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4757808
20 September 2012
MTSA Verification · Industry Initiated Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4446728
9 September 2012
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4436134
14 March 2012
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4263795
4 October 2011
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4161080
15 August 2011
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4131198
27 July 2011
MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4101900
8 May 2011
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4006094
10 June 2010
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3762984
23 March 2010
Industry Initiated Exam · Administration
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3701455
2 November 2009
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3626484
20 April 2009
MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3456680
7 January 2009
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3390222
13 August 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3297291
8 August 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3368394
24 July 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3277802
2 April 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3176744
28 November 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3128877
1 August 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3014668
26 April 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2916408
24 April 2007
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2914833
16 April 2007
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2909364
14 November 2006
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2820488
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 28 April 2023
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel.
The Master could not produce the valid COD during the inspection. This document must be on board the vessel. The TPO shall verify its placement on the vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2023
Resolved 6 June 2023
05 - Radio Communications › N/A - No Subsystem › Reserve source of energy
Issued 28 April 2023
Resolved
The VHF–FM radio must be installed at each operating station and connected to a functioning battery backup.
The Master was unable to conduct a radio test due to a lack of battery backup for the radios. The battery backup shall be renewed and tested to the satisfaction
of the TPO.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2023
Resolved 6 June 2023
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 April 2023
Resolved
All portable fire extinguishers, semi-portable fire-extinguishing systems. . .must be inspected or tested at least once every 12 months, as prescribed in paragraphs (a)(1) through (8) of this section, or more frequently if otherwise required by the TSMS applicable to the vessel.
The portable fire extinguisher on the bridge had not been inspected since 2020. The extinguisher shall be inspected and certified to the satisfaction of the TPO.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2023
Resolved 9 May 2023
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 28 April 2023
Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route.
The gasket on the bow compartment main deck hatch is deteriorated. Vessel shall renew the gasket to the satisfaction of the TPO.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2023
Resolved 9 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 28 April 2023
Resolved
Piping and machinery components that exceed 220 °C (428 °F), including fittings, flanges, valves, exhaust manifolds, and turbochargers, must be insulated. . .
The exhaust manifolds and turbochargers on both main engines and both generators are unlagged and easily accessible. The equipment shall be lagged and insulated to the satisfaction of the TPO.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2023
Resolved 9 May 2023