MAURY USCG vessel records
← All vessels

VS PRIDE

VS PRIDE is a 2006 tank ship. The Coast Guard has recorded 26 inspections since 2016, most recently in June 2026, along with 26 deficiencies and 2 operational controls.

Records from 2016 to 2026. Most recent: inspection, 2 June 2026.

Built
2006
Last inspected
2 June 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

9351414
873339
Flag
ISLE OF MAN
Maury page id
psix-873339

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspections, by type

…with no type recorded4
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Tonnage as PSIX records it42010 - Regulatory (Subpart C or D), Gross Ton
42010 - Convention (Subpart B), Gross Ton
22444 - Regulatory (Subpart C or D), Net Ton
22444 - Convention (Subpart B), Net Ton
73727 - Dead Weight, Metric Ton
89343 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

What it gives that this page does not: the whole record in one dated, citable document — every line with its Coast Guard activity id, the retrieval date on the cover, built to print to PDF with its page breaks — that a surveyor can attach and a lender can file. The same facts as this page, complete and in one file.

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

A request, not a checkout: leave an email and Maury replies once, with the dated document for this hull and a Stripe invoice for $299. Nothing is charged before the document is in your hands.

Inspected as a tow unit · 3

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

JOHN QUIGG Towing Vessel · MISLE 664067 · 11 February 2026 · activity 8312778CAPT. HARRY Towing Vessel · MISLE 38600 · 25 January 2021 · activity 7130089SONIE Towing Vessel · MISLE 820201 · 25 January 2021 · activity 7130089

Inspection history · 26

2 June 2026 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8387522
11 February 2026 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8312778
11 August 2025 COC-TVE Renew · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8207486
28 October 2024 In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8026071
25 October 2024 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8024513
4 June 2024 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7926709
26 April 2024 COC-TVE Renew
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7899485
23 August 2023 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7774995
19 June 2023 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7718364
20 May 2023 Administrative Inspection · COC-TVE Annual · PSC B
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7692661
23 November 2022 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7599071
9 April 2022 COC-TVE Renew · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7424191
10 July 2021 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7251298
25 January 2021 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7130089
24 January 2021 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7129608
8 January 2021 PSC B · Ballast Water Examination · COC-TVE Annual
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7120812
6 March 2020 Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6922149
10 January 2020 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6891705
10 January 2020 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6891712
7 January 2020 Ballast Water Examination · COC-TVE Renew · ISPS II Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6882398
22 May 2019 Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6690792
2 December 2018 ISPS II Exam · COC-TVE Annual · Ballast Water Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6582135
27 November 2018 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6587247
26 December 2017 ISPS II Exam · Ballast Water Examination · Deficiency Check · COC-TVE Renew
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6327427
26 December 2016 Ballast Water Examination · Deficiency Check · COC-TVE Annual · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6062480
28 March 2016 Deficiency Check · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5842387

Deficiency record · 26

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 October 2024 Resolved
NO ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN ANY SPACE WHERE FLAMMABLE MISTURESARE LIABLE TO COLLECT INCLUDNG THESE ONBOARD TANKERS OR IN COMPARTMENTS ASSIGNED PRINCIPALLY TO ACCUMUATORBATTERIES, IN PAINT LOCKERS, ALETYLYNE STORES, OR SIMILIAR SPACES UNLESS THE ADMINISTRATION IS SATISFIED. SUCH EQUIPMENT IS: OF A TYPE WHICHWILL NOT IGNITE THE MIXTURE CONCERNED. PSCO OBSERVED 3 EXPLOSION PROOFLIGHTS ON FORWARD SUPERSTRUCTURE BULKHEAD WITH BROKEN FIXTURES AND/OR MISSING/COMPRIMISED GLANDS. ADDITIONALLY PSCO OBSERVED 1 EXPLOSION PROOF LIGHT IN THE PUMP ROOM AND, EXPLOSION PROOF LIGHT ON THE CATWALKS FORWARD OF COT 1 WITH COMPRIMISED GLANDS. 74 SOLAS (2004) II-I 45.10.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2024
Resolution: Recieved ABS Class Report.
12 - Dangerous Goods › N/A - No Subsystem › Other (tankers)
Issued 28 October 2024 Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM W/ THE PROVISSIONS OF THE PRESENT REGULATIONSNTO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA W/O DANGER TO THE SHIP OR PERSONS ON BOARD. PSCO OBSERVED MULTIPLE PENETRATIONS IN THE FIXED GAS SAMPLING CABINET JEOPARDIZING THE CABINETS GAS TIGHTNESS. ADDITIONALLY, [name withheld] NOT SAMPLING WBTS DESPITE MULTIPLE TANKS RATING EMPTY. 74 SOLAS (20) I(II a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2024
Resolution: Recieved ABS Class Report.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 28 October 2024 Resolved
FIREFIGHTING SYSTEMS AND APPLIANCES SHALL BE KEPT IN GOOD WORKING ORDER AND READILY AVAILIBLE FOR IMMEDIATE USE. PSCO OBSERVED FIXED FIRE FIGHTING SYSTEM (WATER SPRINKLER) INOPERABLE FOR THE CARGO SAMPLE LOCKER LACTED ON THE CARGO DECK. 74 SOLAS (20) II-2 14.2.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2024
Resolution: Recieved ABS Class Report.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 October 2024 Resolved
THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PURPOSE, THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMALE LIQUIDS. PSCO OBSERVED CARGO SAMPLES INCLUDING LEAKING FUEL OIL SAMPLES LYING ON THE DECK IN THE CARGO SAMPLE LOCKER. 74 SOLAS (20) II-2 4.1.1
Action required: 10 - Deficiency Rectified
Resolved 29 October 2024
Resolution: Recieved ABS Class Report.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 28 October 2024 Resolved
MAINTENANCE, TESTING, AND INSPECTIONS SHALL BE CARRIED OUT BASED ON THE GUIDELINES DEVELOPED BY THE ORGANIZATION AND IN MANNER HAVING DUE REGARD TO ENSURING RELIABILITY OF FIRE-FIGHITNG SYSTEMS AND MANUALS. PSCO OBSERVED VESSELS FIXED CO2 PILOT CYLINDERS HAVE NOT BEEN HYDROSTATICALLY TESETED SINCE 2005. PER THE VESSELS SMS, THEY FOLOW MSC.LPRC 1432 WHICH CALLS FOR 10% OF STORAGE CYLINDER AND PILOT CYLINDERS TO BE HYDRODED EVERY 10 YEARS.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 October 2024
Resolution: Recieved ABS Class Report.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 28 October 2024 Resolved
IN THE EVENT OF SUCH DISCHARGE OF OI OR OILY MIXTURE AS IS REFERRED TO IN REGULATION 4 OF THIS ANNEX OR IN THE EVENT OF ACCIDENTAL OR OTHER EXCEPTIONAL DISCHARGE OF OIL BUT EXCEPTED BY THE REGULATION, A STATEMENT SHALL BE MADE IN THE OIL RECORD BOOK PART 1 OF THE CIRCUMSTANCES, AND THE REASON FOR THE DISCHARGE. EACH OPERATION DESCRIBED IN THE PARAGRAPH 2 OF THIS REGULATION SHALL BE FULLY RECORDED W/O DELA IN THE OIL RECORD BOOK PART 1, SO THAT ALL ENTRIES IN THE BOOK APPORPRIATE TO THAT OPERATION ARE COMPLETED. EACH COMPLETED OPERATION SHALL BE SIGNED BY THE OFFICER OF THE OFFICERS IN CHARGE OF THE OPERATIONS CONCERNED AND EACH COMPLETED PAGE SHALL BE SIGNED BY THE MASTER OF THE SHIP. PSCO OBSERVED OIL RECORD BOOK PART 1-2 MISSING ENTRIES RALTING TO DISCHARGE OF OIL ON 24OCT2024 AT PEMEX IN DEER PARK, TX. ADDITIONALLY, MULTIPLEPAGES OF PART 1-2 WEREN'T SIGNED BY THE MASTER.
Action required: 10 - Deficiency Rectified
Resolved 29 October 2024
Resolution: Recieved ABS Class Report.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Certification, verification and control
Issued 28 October 2024 Resolved
THE COMPANY SHOULD ESTABLISH PROCEDURES TO ENSURE THAT THE SHIP IS MAINTAINED IN CONFORMITY WITH THE PROVISIONS IF THE RELEVANT RULES AND REGULATIONS AND WITH ANY ADDITIONAL REQUIREMENTS WHICH MAY BE ESTABLISHED BY THE COMPANY. THE TECHNICAL AND/OR OPERATIONAL NATURE OF THE DEFICIENCIES ABOVE PROVIDE OBJECTIVE EVIDENCE OF A FAILURE OF THE IMPLEMENTATION OF THE ISM CODE. AND INTERNAL AUDIT IS RECOMMENDED TO BE CONDUCTED WITH 90 DAYS. 74 SOLAS (20) IX/3.1 ISM CODE 10.1
Action required: 705 - Other - as specified
Resolved 31 October 2024
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 April 2024 Resolved
No electrical equipment shall be installed in any space where flammable mixtures are liable to collect... unless the administration is satisfied that such equipment is: of a type that will not ignite the mixture concerned. PSCO identified 4 cracked explosion proof lenses in the pump room. Crew isolated electrical circuits with broken lights. vessel is permitted to continue cargo operations as long as broken lights stay secured. 74 SOLAS (04) II-1/45.10.2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2024
Resolved 3 June 2024
Resolution: Technical department provided photographic evidence of replaced EX lights in the Cargo Pump Room.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 May 2023 Resolved
No electrical equipment shall be installed in any space where flammable mixtures are liable to collect. There are 05 cracked lenses on explosion-proof lights in the cargo pump room; 03 were replaced. - 74 SOLAS '04 II-1/45.10
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 June 2023
Resolution: 03 lenses replaced during inspection 02 lenses replaecd prior to departure
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 May 2023 Resolved
Terminations and joints in all conductors shall be so made as to retain the original electrical properties of the cable. There is an exposed dead-end wire in the ship's sample locker. - 74 SOLAS '04 II-1/45.5.6
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 June 2023
Resolution: The wire was deenergized and not connected to any circuit. The dead end wire was secured inside the explosive-proof switch box of the sample locker fan, to the satisfaction of the attending class surveyor
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 May 2023 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed jacket water actively leaking from #5 cylinder on main engine.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 June 2023
Resolution: Crew replaced O rings stopping J/W leak
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 30 May 2023 Resolved
The machinery shall be so installed to reduce to a minimum any danger to persons on board. On the main engine second deck, going from starboard to forward, there is a location with no fall protection adjacent to the ladder. - 74 SOLAS '04 II-1/26.1
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 June 2023
Resolution: Vessel fabricated ladder railing using a 4 foot length of 1 inch OD steel tubing. Vessel securely bolted and installed railing in way of the ladder on the Main Engine Second Deck.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 30 May 2023 Resolved
SOPEP - The equipment and supplies must include non-sparking hand scoops, shovels, and buckets. On deck there was a steel shovel in the SOPEP barrel next to the discharge manifold. Deficiency rectified on the spot. - 33 CFR 155.205(b)(2)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 May 2023
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 May 2023 Resolved
Vapor collection piping must be electrically bonded to the hull and must be electronically continuous. One bonding wire on the IG main was wasted and disconnected. Deficiency rectified on the spot. - 46 CFR 39.2001(c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 May 2023
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 30 May 2023 Resolved
Each vessel vapor connection flange face must have a permanent stud. The port forward vapor manifold reducer was not affixed with a vapor stud. - 46 CFR 39.2001(j)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 July 2023
Resolution: Received Class Report indicating stud on vapor control line was replaced.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 9 April 2022 Resolved
For Tankers of 20,000 tonnes deadweight and upwards constructed on or after 01July 2002, but before 01 January 2016, the protection of the cargo tanks shall be achieved by a fixed inert gas system in accordance with the requirements of the Fire Safety Systems Code. Fire Safety [name withheld] states the system shall be designed to ensure that if the oxygen content exceeds 5% by volume, the inert gas shall be automatically vented to the atmosphere. PSCO during the testing of the inert gas system observed valve not automatically venting to atmosphere when above 5% volume. Prior to conducting discharge operations of cargo inert gas system shall be fully operational and meet all above requirements. 74SOLAS (20) II-2/5.5.1.1 FSS Chapter 15.2.2.2.4
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 11 April 2022
Resolution: Company technician provided test protocol/procedute and parameter settings guide to C/E on how to trouble shoot and rectify IG System main inert gas delivery and purge valve. Class surveyor confirmed system operating as designed.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 9 April 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed fixed gas sampling detection system not operating as per designed. Conduct repairs prior to loading Cargo’s that require a gas detection system 74SOLAS (20) I/11.a
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 11 April 2022
Resolution: Recieved class report stating that class surveyor ensured that vessel personnel had 02 calibrated portable RKK GS 8000 multiple gas meters and necessary equimment/accessories to take O2 content readings from any ballast tank.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 January 2021 Resolved
Vessel experienced a loss of propulsion. Vessel must submit a classification report providing (1) a cause and analysis concerning contributing factors that led to the loss of propulsion, (2) certifying that any necessary repairs have been satisfactorily completed, and (3) certifying the vessel is fit for its intended voyage prior to movement.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 January 2021
Resolution: Class report received. See attached.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 9 January 2020 Resolved
For tankers of 20,000 tonnes deadweight and upwards, the protection of the cargo tanks shall be achieved by a fixed inert gas system in accordance with the requirements of the Fire Systems Safety Code. Vessel's inert gas system has corroded bellows causing sea water leak in the gas supply mode and an exhaust leak in inert gas generator supply mode.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 January 2020
Resolution: Recieved ABS class report that temp repair was completed with Wencon Hi-temp two part compound. Temp repair is only good for voyage from Honolulu, HI to Richmond, CA. At which time permanent repair must be accomplished.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 9 January 2020 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. During port side lifeboat recovery, the internal launch cable became entangled and parted at the D-ring, which holds the handle to the cable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 January 2020
Resolution: Shipboard personnel were able to rectify the deficiency and demonstrate proper operation of internal launch cable.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 7 January 2020 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. Vessel's incinerator has gas leak into engine room on the top-middle of the bottom door. Metal of knife edge wasted.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2020
Resolved 4 March 2020
Resolution: Received class report dated 28FEB2020 noting satisfactory repair of incinerator.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 26 December 2017 Resolved
1899: The arrangements of the deck seal and its associated fittings shall be such that it will prevent the backflow of liquids and vapors and will ensure the proper function of the seal under operating conditions. The inter gas system deck seal is wasted and has a hole where the steam line meets the seal allowing water and vapor to escape, 74SOLAS(14)II-2/4.5.5.1.2 & FSS CODE 15.2.2.4.2, 17A/C.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 December 2017
Resolved 28 December 2017
Resolution: Addressed and corrected to the satisfaction of Class.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 26 December 2017 Resolved
2490: Personnel responsible for the operation of an incinerator installed in accordance with the requirements of paragraph 6.1 of this regulation shall be trained to implement guidance provided in the manufacturers manual as required by paragraph 7 of this regulation. Garbage chute is being held closed with a wooden block. The incinerator is unable to properly close, MARPOL VI/6.8, 17A/C.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 December 2017
Resolved 28 December 2017
Resolution: Addressed and corrected to the satisfaction of Class.
Engineering › Reduction Gearing/Clutches › Casing
Issued 26 December 2017 Resolved
2550: The condition of the ship and its equipment shall be maintained to conform the with provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or its persons on board. The #2 top bracing is completely cracked and is separated from the bulkhead, 74SOLAS(14)II-1/11, 17A/C.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 27 December 2017
Resolved 27 December 2017
Resolution: Addressed and corrected to the satisfaction of Class.
Deck/Cargo › Cargo Heating › General
Issued 3 January 2017 Resolved
The condition of the ship and its equipment shall be maintained to conform with the porvisions of the present regulations. Cargo steam heating main ling flange near cargo pump room is cracked and leaking on deck. 74SOLAS(14 cons) CH 1, Reg 2 (Code: 40 AC)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 January 2017
Resolution: Recieved class report from ABS attesting that the cargo steam heating main line flange near cargo pump room was replaced and pressure tested with no leaks by the attending surveyor.
Deck/Cargo › Vapor Control Systems › Flame Screens
Issued 26 December 2016 Resolved
The condition of the ship and its equipment shall be maintained to conform with the porvisions of the present regulations. Cargo vent screens on pressure/ vacuum valves were corroded on 04 PV valves. Screens were replaced in the presence of the PSCO. 74SOLAS(14 Cons)CH I, Reg 2 (Code: 10C)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2017
Resolved 3 January 2017

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.