Records from 2007 to 2026. Most recent: inspection, 3 June 2026.
Documentation record
Registered dimensions (L × B × D)345.9 ft × 60.0 ft × 29.0 ft
Registered tonnagegross 5,778 / net 5,778
ITC dimensions (L × B × D)345.9 ft × 60.0 ft × 29.0 ft
ITC tonnagegross 4,946 / net 2,852
BuilderBOLLINGER MARINE FABRICATORS LLC · AMELIA, LA, UNITED STATES · built 2007
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 9 January 2026 · expires 28 February 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it4946 - Convention (Subpart B), Gross Ton
5778 - Regulatory (Subpart C or D), Gross Ton
2852 - Convention (Subpart B), Net Ton
5778 - Regulatory (Subpart C or D), Net Ton
10044 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 51
3 June 2026
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8368647
7 April 2025
Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8103917
6 March 2025
Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8089213
4 April 2024
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7890438
10 May 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7685533
5 April 2023
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7679533
7 July 2022
Administrative Inspection · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7499354
7 July 2022
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7500656
2 June 2022
Administrative Inspection · Equivalency
Administrative · Commandant (CG-CVC) · Activity 7466380
2 March 2022
COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7406084
11 March 2021
Annual Inspection · MTSA Verification · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7154525
24 February 2020
MARPOL Annex VI Survey · MARPOL Annex I Examination · Deficiency Check · Periodic Inspection · MTSA Verification · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6914258
13 March 2019
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6641612
15 December 2018
Administrative Inspection · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6598178
5 November 2018
Examination of Repairs · Damage Survey · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6575040
13 October 2018
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6564568
6 February 2018
MARPOL Annex IV Survey · MARPOL Annex I Examination · MARPOL Annex II Examination · Annual Inspection · MTSA Verification · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6350677
14 August 2017
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6240694
8 February 2017
Internal Structural Exam · MARPOL Annex VI Survey · Drydock Exam · MARPOL Annex II Examination · COI Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6084498
19 October 2016
MARPOL Annex VI Survey · MARPOL Annex I Examination · MARPOL Annex IV Survey · Annual Inspection · Administrative Inspection · MARPOL Annex II Examination · MTSA/ISPS Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6049843
6 June 2016
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5899549
10 September 2015
Periodic Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5722565
12 May 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5124625
16 March 2015
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5084566
16 March 2015
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5085071
17 December 2014
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5040893
1 December 2014
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5031990
22 October 2014
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5008372
1 October 2014
Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 4994958
18 May 2014
Type not recorded
No type recorded · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 4865216
22 January 2014
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4787565
17 January 2014
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 4788266
2 December 2013
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4762832
7 November 2013
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4749136
4 November 2013
MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4746643
6 July 2013
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4646832
2 August 2012
MTSA/ISPS Verification · MARPOL Annex V Examination · MARPOL Annex VI Survey · MARPOL Annex II Examination · COI Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 4399011
17 May 2012
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 4314087
21 February 2012
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4248346
24 November 2011
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4195323
24 November 2011
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4206392
6 October 2011
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 4162162
19 September 2011
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 4149354
18 June 2011
Annual Inspection
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 4168188
23 August 2010
Annual Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3831905
13 March 2009
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3438396
1 December 2008
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3372015
13 November 2008
Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3360687
30 April 2008
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3196275
25 March 2008
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3171785
13 August 2007
Hull Examination · MARPOL Annex I Examination · MTSA Verification · Cargo Tank Internal · Internal Structural Exam · Construction Oversight · Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3027037
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 11 March 2021
Resolved
Each liferaft or group of liferafts must be arranged for float-free launching. The arrangement must ensure that liferaft or liferafts, when released, are not dragged under by the sinking vessel.
Vessels 6 man liferaft was not correctly attached to the Hydrostatic weak link. Rectified on scene. No further action required.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 12 March 2021
Resolved 12 March 2021
Resolution: Corrected on the spot. No further action required.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 11 March 2021
Resolved
Entries shall be made in the Oil Record Book on each occasion, on a tank to tank basis if appropriate, whenever any of the following cargo/ballast operations take place on any oil tanker to which this section applies. (1) Loading of Oil Cargo. (2) Internal transfer of oil cargo during voyage. (3) Unloading of Oil cargo.
Vessel receives its machinery fuel from the tug. When asked to produce records of that transfer, consistent record keeping was not presented. Most recent transfer was not documented.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2021
Resolved 18 March 2021
Resolution: Operator showed updating of internal communications to ensure a more thorough passdown and understanding of expectations with regards to internal oil xfr and record keeping. No further Action is required at this time.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 February 2020
Resolved
Electric installations must ensure protection of crew from electrical hazards. Several of the battery charger connections are exposed located in the generator space posing an electrical hazard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 March 2020
Resolved 4 March 2020
Resolution: protective covering installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 February 2020
Resolved
Lifebuoys located on the port bow and starboard aft of the accommodation space must be replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 March 2020
Resolved 4 March 2020
Resolution: Life buoys replaced
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 24 February 2020
Resolved
At least one-half the total number of life buoys must each be fitted with a self-igniting light approved under 161.010. The self-igniting lights may not be attached to the life buoys fitted with lifelines. Vessel only had two self-igniting lights and is required to have five.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 March 2020
Resolved 4 March 2020
Resolution: Correct amount of lights on board
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 24 February 2020
Resolved
At least two life buoys on the vessel must be each fitted with a self-activating smoke signal approved under 160.157. Life buoys fitted with smoke signals must also be fitted with lights. Vessel did not have self-activating smoke signals. Vessel is restricted to a coast-wise route until smoke signals are on board and properly installed.
Action required: 705 - Other - as specified
Resolved 4 March 2020
Resolution: smoke signals on board
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 13 March 2019
Resolved
Ground fault indicated on the 110v pnl in the galley.
46 CFR 111.105-25
Condition: Improper Installation
Due 13 March 2019
Resolved 13 March 2019
Resolution: VSL rep sent video of proper operation of the 110v Ground Det in the galley area.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 December 2018
Resolved
GT01: Prepare and submit for review and approval a plan to properly remove all excess oily water located in the forward rake. Plan approval must be given prior to commencing discharge operations.
All cargo operations are now secured. Once all oily water is removed from the forward rake, an attending Coast Guard Marine Inspector must ensure barge's fitness for route and service prior to operations. 46 CFR 31.10-25
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 December 2018
Resolution: Visually inspected condition of fwd rake and operationally tested the local bilge water pump. All Sat.
Electrical › Electric Generation Source (service) › Generator
Issued 10 September 2015
Resolved
Caterpillar Diesel generators could not be test engine shutdowns IAW manufacturer’s recommendations to meet applicable regulations. Demonstrate Low Lube Oil and Over-speed shutdowns to attending USCG Marine Inspector within 21 days.
Action required: 705 - Other - as specified
Due 8 October 2015
Resolved 5 October 2015
Resolution: Received Tech report from vessel rep that the emergency shutdowns for the gen sets were completed satisfactorily.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 10 September 2015
Resolved
Back up battery for emergency lighting was not serviceable. Replace battery within 7 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 September 2015
Resolved 10 September 2015
Resolution: Battery was replaced before the CG departed the vessel; corrected on the spot.
Electrical › Electrical Distribution System (service) › Switch
Issued 1 October 2014
Resolved
Identified multiple broken bolts on the intrinsically safe fittings for the winch control boxes, located fore and aft. Replace broken bolts. (46CFR111.105)
Action required: 705 - Other - as specified
Due 31 December 2014
Resolved 22 October 2014
Resolution: All hardware on affected control boxes has been renewed and upgraded to zinc plated steel.
Electrical › Electric Supply System (service) › Battery Installation
Issued 1 October 2014
Resolved
Discovered that the batteries in the generator space were in need of bracing and blocking in their respective storage boxes, and had temporary-style terminal connectors installed. Properly brace/block batteries, and install permanent-type terminal connectors. (46CFR111.105)
Action required: 705 - Other - as specified
Due 15 October 2014
Resolved 2 October 2014
Resolution: Corrected and verified while still in Port of Toledo, OH.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 5 November 2013
Resolved
Vessel must provide permanent resolution of the temporary solution of limiting the cargo pump maximum discharge pressure (<145 psi) by reducing the speed of the cargo pump motors to 1460 RPMs. Resolution shall be to the satisfaction of ABS and USCG. 46 CFR 56.07-10. Extended due date from 05DEC to 18DEC. Extended due date from 18DEC to 10JAN2014.
Action required: 705 - Other - as specified
Due 10 January 2014
Resolved 14 January 2014
Resolution: ABS witnessed hydrostatic pressure test of cargo piping and (06) cargo hoses at 330psi. The MAWP of the cargo pumps is 220psi. This hydro test is 1.5x that MAWP. This is a satisfactory resolution of the temporary solution. See ABS report #NY2523917.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 4 November 2013
Resolved
Cargo Pump pressure gauges are piped into the tanker man control room, which is not a Class 1division 1 space.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 November 2013
Resolved 5 November 2013
Resolution: Pressure gauge piping located in the tanker man control room was removed and secure, not allowing gas vapors from the hazardous area to penetrate the space.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 4 November 2013
Resolved
Cargo Pumps emergency shutdown test need to be conducted on cargo pumps #1, #2 and #3.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 November 2013
Resolved 5 November 2013
Resolution: Conducted satisfactory emergency shut down test on the #1, #2 and #3 Cargo Pumps.
Engineering › Fuel Oil Service System › Hose
Issued 4 November 2013
Resolved
Nonmetallic flexible hose may be used in fuel oil systems in lengths not exceeding 30 inches. Fuel oil systems on all 3 generator prime movers exceed the 30 inch maximum. Vsl must install fixed piping to reduce flex hose length below the maximum. Flex hose must be SAE J1942 compliant. 46 CFR 56.60-25(b)(4). Extended due date from 04DEC to 18DEC. Extended due date from 18DEC to 10JAN.
Action required: 705 - Other - as specified
Due 10 January 2014
Resolved 14 January 2014
Resolution: ABS verified that the fuel oil pressure switches were repositoned, resulting in a shorter length (24 inches) of non-metallic flexible hose being needed. New flex hose is of approved type (RYCO RQP14). See ABS report #NY2523917.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 4 November 2013
Resolved
Provided documentation that all cargo pump discharge pressure gauges have been calibrated. 33 CFR 156.170(c)(3). Extended due date from 04DEC to 18DEC. Extended due date from 18DEC to 10JAN2014.
Action required: 705 - Other - as specified
Due 10 January 2014
Resolved 14 January 2014
Resolution: During hydrostatic pressure test on 14JAN, vessel verified all pressure gauges were within tolerances using a reference pressure gauge calibrated on 26SEP2013. See gauge calibration record.
Operations/Management › Pollution › Control of Volatile Organic Substances
Issued 4 November 2013
Resolved
Vessel does not have an approved Volatile Organic Compounds (VOC) Management Plan onboard. Vessel is prohibited from carrying crude oil on an international voyage. MARPOL Annex VI Reg. 15. Extended due date from 04DEC to 18DEC. Extended due date from 18DEC to 10JAN.
Action required: 705 - Other - as specified
Due 10 January 2014
Resolved 6 January 2014
Resolution: MSC has reviewed, accepted and approved the request for the VOC Management Plan. Serial: C1-1304434
Construction/Loadline › Hull › Side Shell
Issued 21 February 2012
Resolved
2 insets found in stbd bow rake, IWO frames 6 and 8, respectively at the 15' draft mark. Vessel to crop and renew to the satisfaction of ABS.
Action required: 705 - Other - as specified
Resolved 2 April 2012
Resolution: Received, reviewed, and accepted class report from ABS stating proper repair was made in stbd bow rake.
Construction/Loadline › Hull › Hull Plating
Issued 24 November 2011
Resolved
Vessel has temp repair of a 6" verticle fracture at the 15' draft mark on stbd bow that requires permanent repair during DDX in august 2012.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 August 2012
Resolved 21 February 2012
Resolution: Resolved on 02/21/2012 , verified by ABS Report
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 13 November 2008
Resolved
The electric motor for the port forward fender winch has a broken electrical fitting that enters the electric motor case. Vessel shall provide adequate repair to ensure that the fitting will not allow the entry of explosive gasses. Complete permanent repair no later than 12 Jan 2008.
Action required: 705 - Other - as specified
Due 12 January 2009
Resolved 1 December 2008