Inspection history · 31
29 May 2025
Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8135149
3 April 2025
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8104084
28 May 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7921257
27 June 2023
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7724522
16 June 2022
COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7471952
11 May 2022
Drydock Exam · Internal Structural Exam · Administrative Inspection · Cargo Tank Internal
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7448576
7 June 2021
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7218461
10 April 2020
MTSA Verification · Administrative Inspection · Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6937881
10 June 2019
MTSA Verification · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6709993
14 June 2018
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6443862
25 July 2017
COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6220711
5 April 2017
Drydock Exam · Internal Structural Exam · Deficiency Check · Cargo Tank Internal · In-Service Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6109420
22 August 2016
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5979499
3 August 2015
MTSA Verification · Periodic Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5204708
28 July 2014
MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4936418
22 October 2013
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4744831
21 August 2013
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4694003
7 August 2013
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4677450
31 December 2012
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4510136
2 August 2012
Internal Structural Exam · Drydock Exam · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4403667
22 May 2012
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4349995
16 May 2012
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4313212
2 December 2011
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4200479
17 August 2011
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4118243
13 September 2010
MTSA Verification · Deficiency Check · Periodic Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3848701
2 March 2010
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3688780
9 January 2010
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3663358
26 August 2009
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3583539
30 March 2009
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3442737
10 September 2008
MARPOL Annex V Examination · MARPOL Annex I Examination · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3321547
16 August 2007
Construction Oversight · MTSA Verification · Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3029725
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 10 June 2019
Resolved
On all tank vessels, where cargo pump shafts pierce gas tight bulkheads, stuffing boxes with readily accessible gas tight glands shall be provided.
The starboard bellows that pierces the bulkhead between the starboard cargo pump prime mover and the starboard cargo pump is not gas tight.
Rectify deficiency prior to operation of the starboard cargo pump.
Action required: 705 - Other - as specified
Due 24 June 2019
Resolved 12 June 2019
Resolution: Installed new bellows creating vapor tight seal.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 10 June 2019
Resolved
Where the plans and arrangements will possibly permit, all passageways leading to living quarters, shall be provided with not less than two means of escape.
The emergency escape hatch from the accommodation space was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 June 2019
Resolution: Emergency escape hatch has been serviced and is fully operational.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 10 June 2019
Resolved
Liferafts must be readily transferable for launching on either side of the vessel or supplemented with additional liferafts to bring the total capacity of the liferafts available on each side of the vessel to at least 100% of the total persons on board.
Only one liferaft was installed on top of the accommodation space preventing side to side transfer.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2019
Resolved 17 October 2019
Resolution: See Notes for agreed upon conditions. Liferaft to be relocated to suitable position at next drydock.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 June 2019
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use.
The lifebuoys on the starboard bow and port quarter are not serviceable. The grab lines, retro and plugs are deteriorated.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 June 2019
Resolution: Installed new life rings.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 June 2019
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use.
The lights attached to the life jackets are inop.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 June 2019
Resolution: Installed new lights on the lifejackets.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 June 2019
Resolved
When operating a vessel on a body of water where the discharge of treated or untreated sewage is prohibited by the EPA, the operator must secure each type I, II, or II device in a manner which prevents discharge of treated or untreated sewage.
Please provide approval documentation for the type MSD installed on the vessel. No documentation was provided at the time of inspection. No locking device was visible at time of inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 June 2019
Resolution: Provided proof of approved Type II MSD.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 26 July 2017
Resolved
Loss of power alarm on overfill protection is inoperable. To be corrected prior to cargo operations.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2017
Resolution: Loss of power alarm is now operating correctly.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 12 April 2017
Resolved
Replace 03 P/V valves in kind (Set points: 2.0 PSI Pressure, .5PSI Vacuum. Failed initial testing.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 April 2017
Resolution: Vessel obtained replacement parts in kind, bench tested 03 under required pressure/vacuum set points at shipyard, all sat.
Construction/Loadline › Hull › Weld
Issued 5 April 2017
Resolved
3P, SSL#6, Bay 1/2, vee and weld crack in SSL and vertical stiffener.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 April 2017
Resolution: V/W completed to satisifaction of CG.
Construction/Loadline › Hull › Weld
Issued 5 April 2017
Resolved
3P, SSL#3, Bay 2/3, vee and weld crack in SSL and vertical stiffener.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 April 2017
Resolution: V/W to satisfaction of CG.
Construction/Loadline › Hull › Stiffener
Issued 5 April 2017
Resolved
5P, Bay 5 from ffwd, 1 from top, C/R SSV C channel as marked.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 April 2017
Resolution: C/R to original, all sat by CG.
Construction/Loadline › Hull › Stiffener
Issued 5 April 2017
Resolved
Void 4, Bay 4 from fwd, #1 SSL from deck, V/W, as marked and vertical stiffener.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 April 2017
Resolution: V/W completed to satisfaction of CG.
Electrical › Electric Generation Source (service) › Ground Detection
Issued 28 July 2014
Resolved
Each ungrounded system must be provided with a ground detection system located at the respective switchboard which provides continuous indication of circuit status to ground. Ground detection bulb is out, vessel must repair bulb ensuring there are no grounds on board. (46CFR111.05-25)
Due 12 August 2014
Resolved 29 July 2014
Resolution: Vessel repaired fuse associated with ground detection panel. All ground detection indicating bulbs operating as designed.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 7 August 2013
Resolved
Cargo Pump House #2 located on the cargo block has unapproved electrical outlet and wire connections installed.
Due 21 August 2013
Resolved 21 August 2013
Resolution: Witness the installation repair of the marine grade electrical outlet located in the cargo pump house.
Deck/Cargo › Vapor Control Systems › Liquid Overfill Protection
Issued 7 August 2013
Resolved
Vapor Recovery System power failure audible/visual alarm (Blue Light) inoperable.
Due 21 August 2013
Resolved 21 August 2013
Resolution: Satisfactory tested the vapor recovery system power failure audible/visual alarm.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 7 August 2013
Resolved
Cargo Pump Engine #1 and #2 Bellows are not properly secured or clamped down.
Due 21 August 2013
Resolved 21 August 2013
Resolution: Vessel properly secured with clamps cargo pump engine #1 and #2 Bellows.
Construction/Loadline › Hull › Transverse Frame
Issued 13 September 2010
Resolved
V/W #2 side shell transverse frame IWO #6 side shell long in #4 port double bottom Bay #2.
Due 13 October 2010
Resolved 23 September 2010
Construction/Loadline › Hull › Bottom Plating
Issued 13 September 2010
Resolved
Pit found in tank bottom of #3 stbd double bottom, bay 11 on centerline with evidence of leakage of cargo on deck. Prove #3 stbd cargo tank is not leaking prior to conducting cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 September 2010
Construction/Loadline › Hull › Transverse Frame
Issued 13 September 2010
Resolved
V/W #7 side shell transverse frame A/M IWO #3 side shell long in #3 stbd double bottom.
Due 13 October 2010
Resolved 23 September 2010
Construction/Loadline › Hull › Stiffener
Issued 13 September 2010
Resolved
C/R horizontal support frame IWO #6 side shell transverse frame A/M in #3 stbd double bottom.
Due 13 October 2010
Resolved 23 September 2010
Construction/Loadline › Hull › Transverse Frame
Issued 13 September 2010
Resolved
V/W #6 side shell transverse frame IWO #3 side shell long in #3 stbd double bottom.
Due 13 October 2010
Resolved 23 September 2010
Construction/Loadline › Hull › Transverse Frame
Issued 13 September 2010
Resolved
V/W #1 Side shell long IWO #10 side shell transverse frame in #3 port double bottom.
Due 13 October 2010
Resolved 23 September 2010
Construction/Loadline › Hull › Transverse Frame
Issued 13 September 2010
Resolved
V/W #1 side shell long IWO #9 side shell transverse frame in #3 port double bottom.
Due 13 October 2010
Resolved 23 September 2010
Construction/Loadline › Hull › Transverse Frame
Issued 13 September 2010
Resolved
V/W #2 side shell long counting from bottom up IWO of #6 side shell transverse frame in #2 port double bottom.
Due 13 October 2010
Resolved 23 September 2010
Engineering › Generator (propulsion/auxiliary-electric) › Circuit Board
Issued 13 September 2010
Resolved
Demonstrate Low Lube oil shutdowns on both generators.
Due 23 October 2010
Resolved 20 October 2010
Electrical › Lighting (service) › Ground Detection
Issued 13 September 2010
Resolved
Ground detection system not operational. All 03 lights are out. Repair ground detection system on flood lights panel.
Due 7 October 2010
Resolved 20 October 2010