Registered dimensions (L × B × D)60.5 ft × 26.0 ft × 7.4 ft
Registered tonnagegross 77 / net 62
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderLEMAY BARGE & SUPPLY INC · GREENVILLE, MS, UNITED STATES · built 1966
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 21 January 2026 · expires 31 January 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it77 - Simplified, Gross Ton
62 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
18 November 2025
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8267291
11 October 2025
Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8250740
28 October 2024
Administrative Inspection · Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8025948
24 August 2023
Administrative Inspection · COI Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7775699
16 May 2023
In-Service Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7689656
22 June 2022
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7472827
25 March 2021
MTSA Verification · COI Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7169656
22 February 2021
Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7144204
17 February 2021
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7143292
21 November 2019
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6865437
22 October 2016
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6031375
14 April 2014
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4841992
5 July 2013
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4654800
21 May 2012
Industry Initiated Exam · Deficiency Check
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4312533
13 January 2009
Administration
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3393449
23 October 2006
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 2807137
10 January 2005
MTSA Verification
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2272315
22 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1968380
25 November 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 763287
9 November 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 205868
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 October 2025
Resolved
Following completion of Shaft replacement, the vessel back away from the dock when the shaft disconnected from the coupling, sliding back and lodging on the steering rudder. Propulsion machinery, including main engines, reductions gears, shafting, bearings, and electrical equipment must be maintained to ensure proper operation.
Prior to movement, assess extent of damages caused by this incident and affect permanent repairs to the satisfaction of the Coast Guard.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 11 October 2025
Resolved 13 October 2025
Resolution: Affected permanent repairs by reinstalling the Coupling with the washer in place. Conducted satisfactory operational testing on McKellar Lake.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 28 October 2024
Resolved
Decks and bulkheads designed to be watertight or weathertight must be maintained in that condition. There was an 2" open penetration found on the deck of the aft void and 12" of water found in the void. Install threaded plug in the open collar. If threads are too damaged to make a watertight seal, the use of a marine grade epoxy is authorized. If epoxy is used, permanent repairs will be required at next scheduled drydock. Remove water from void space and make space available for inspection to ensure there is no water intrusion from a breach in the hull or rudder seals.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 October 2024
Resolution: Received photographic evidence that penetration was capped.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 May 2023
Resolved
General. (a) Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions.
Starboard main engine out of service.
Return starboard main engine to normal operation.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 August 2023
Resolution: Renewed starboard main engine and conducted power trials; engine trials witnessed by SLMR MIs.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 24 May 2023
Resolved
Vessel stability. (b) A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised.
Fractures identified on port and starboard sheer strakes, along rub-rail, at forward void.
Make the forward void available for inspection by an attending Marine Inspector. Space must be gas-free and inspected by a Certified Marine Chemist prior to Marine Inspectors entering the space.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2023
Resolution: Damage was found and repaired under CG oversight
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 22 June 2022
Resolved
Each towing vessel must be maintained and operated so as to minimize fire hazards and to ensure the following: (a) All bilges and void spaces are kept free from accumulation of combustible and flammable materials and liquids insofar as practicable.
Prior to operating, remove excess oily waste from engine room bilges.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 June 2022
Resolution: Oily waste has been removed from engine room bilge.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 June 2022
Resolved
Pressure vessels over 5 cubic feet in volume and over 15 pounds per square inch maximum allowable working pressure (MAWP) must be equipped with an indicating pressure gauge (in a readily visible location) and with one or more spring-loaded relief valves. The total relieving capacity of such relief valves must prevent pressure from exceeding the MAWP, as established by the manufacturer, by more than 10 percent.
Pressure vessel in engine room has a MAWP of 200 psi; the relief valve on the pressure vessel is set to relieve at 250 psi.
Prior to operating, provide a relief valve not exceeding the MAWP of the pressure vessel.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 June 2022
Resolution: Pressure safety relief vavle has been replaced with one rated at 150 psi.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 22 June 2022
Resolved
A towing vessel must carry a combination of day and night visual distress signals indicated in table 141.370.
Vessel does not have the required visual distress signals on-board.
Vessel is temporarily authorized to operate in a limited geographic area on a short run limited to approximately 30 minutes away from the dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 5 July 2022
Resolution: The required visual distress signals have been placed onboard.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 22 June 2022
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. The following alarms must be provided:
High bilge levels. Alarms must be visible and audible at each operating station.
Vessel has an audible alarm heard outside of the operating station. While the visual and audible alarms are being added to the operating station, the vessel is permitted to operate only when an hourly round of the engine room is made by the crew.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 14 July 2022
Resolution: Witnessed video evidence of bilge high level audible and visual alarms at operating station.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 June 2022
Resolved
Electrical systems and equipment must function properly
and minimize system failures and fire and shock hazards.
Provide blanks for engine room electrical distribution
panel openings.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2022
Resolved 14 July 2022
Resolution: Received photo evidence of a cover placed over the blanks on the engine room electrical panel.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 22 February 2021
Resolved
Center rudder inoperable due to sheared shaft that shifted aft and came to rest on center rudder.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2021
Resolved 4 March 2021
Resolution: Shaft replaced.