Records from 2008 to 2025. Most recent: inspection, 28 October 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 13.0 ft
Registered tonnagegross 1,754 / net 1,754
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC PLANT 296 · ASHLAND CITY, TN, UNITED STATES · built 2008
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 June 2026 · expires 31 July 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1754 - Simplified, Net Ton
1754 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 25
28 October 2025
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8256983
24 February 2025
Damage Survey · Deficiency Check
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8084022
24 February 2025
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8100857
18 November 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8033485
10 October 2023
Examination of Repairs · COI Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7802031
9 August 2022
Annual Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7529362
15 September 2021
Periodic Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7313920
3 September 2020
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7049392
28 August 2020
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7044713
27 August 2019
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6797459
28 June 2018
Examination of Repairs · Damage Survey · Cargo Tank Internal · MTSA Verification · Internal Structural Exam · Administrative Inspection · COI Inspection · Drydock Exam
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6458700
5 April 2017
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6118433
22 August 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5976115
9 April 2015
Deficiency Check · Administrative Inspection · Periodic Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5100497
24 September 2014
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4991080
14 January 2014
Administrative Inspection
Administrative · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4782680
12 June 2013
Examination of Repairs · In-Service Inspection · COI Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4618364
15 August 2012
Damage Survey
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4411578
14 August 2012
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4411748
2 July 2012
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4364979
28 July 2011
Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4089164
25 August 2010
Annual Inspection · Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3823221
5 June 2009
Deficiency Check · MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3495865
29 September 2008
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3335082
30 June 2008
Internal Structural Exam · Cargo Tank Internal · Administrative Inspection · Initial Certification · MTSA Verification · Hull Examination · Initial Construction-Excluding Oversight
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3252432
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 24 February 2025
Resolved
The inspection shall be such as to insure that the vessel, as regards the structure, piping, and other equipment is in satisfactory condition and fit for the service for which it is intended.
Vessel has the following damage after bridge-allision:
In way of the bow compartment, commencing at the port bow corner and extending inboard 31’6”, the forward 25’0” of the bow compartment was set in from 0” to 17’0” and holed in way. The bow void was flooded to river level with water tight bulkheads intact.
In way of the starboard No. 4 wing tank, commencing 15’0” aft the forward bulkhead and extending aft 13’0”, the formed deck and gunwale outboard radius was set in from 0” to 4” over an area of 13’0” x 4’6” with the adjacent internals distorted to conform.
Vessel will conduct barge-to-barge lightering operations at MM 658.1 and is authorized to proceed to Greenville, Mississippi for permanent repairs, in accordance with approved transit plan.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2025
Resolution: Satisfactory air test of all required repairs completed.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 28 August 2020
Resolved
No Benzene signage posted. The frame holding signage broke and was lying on the deck.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 3 September 2020
Resolution: Benzene sign posted
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 9 April 2015
Resolved
Prove proper operation of overfill protection devices (dip stick variety) on # 3 port and starboard cargo tanks (2) prior to loading cargo.
Action required: 705 - Other - as specified
Due 9 May 2015
Resolved 16 April 2015
Resolution: Once cargo unloaded, vessel rep removed devices, extracted broken parts from device internals, re-installed devices and installed new dip sticks.
Deck/Cargo › Cargo Heating › General
Issued 9 April 2015
Resolved
On vessel's thermal fluid heater prove proper operation of low combustion air sensor. Visual alarm indicator (flashing red light) also found to be inoperable.
Action required: 705 - Other - as specified
Due 9 April 2015
Resolved 9 April 2015
Resolution: Sensor replaced and performed satisfactorily. Light fixture replaced and operated satisfactorily.
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 August 2012
Resolved
Replace cargo pump engine wiring harness NLT 01 NOV 2015 or IAW D8 letter dated 05 NOV 2010.
Action required: 705 - Other - as specified
Due 1 November 2015
Resolved 28 June 2013
Resolution: Relocated Engine outside class 1 Div 1 hazardous zone.
Deck/Cargo › Cargo Heating › General
Issued 25 August 2010
Resolved
Faulty thermal fluid heater alarm relay. Replace and test to the satisfaction of the attending marine inspector prior to thermal fluid heater operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 August 2010
Resolution: New TFH alarms relay installed and tested sat.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 5 June 2009
Resolved
Replace matting w/ approved DECK COVERING as per 46CFR111.30-11.
Condition: Improper Installation
Due 5 June 2009
Resolved 5 June 2009
Resolution: Corrected on the spot.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 30 June 2008
Resolved
Prior to loading cargo provide VRP approval letter on board as well as pertinent parts of VRP on board.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 July 2008
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 June 2008
Resolved
Replace cargo pump engine wiring harness NLT 01 Aug 08 or in compliance with submitted D8 plan as per D8 policy letter 02-2007.
Action required: 705 - Other - as specified
Due 18 June 2010
Resolved 14 August 2012
Resolution: New CG 835 issued, extending due date to 1 NOV 2015.