Records from 2008 to 2026. Most recent: inspection, 7 January 2026.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · ASHLAND CITY, TN, UNITED STATES · built 2008
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 18 December 2025 · expires 31 January 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 28
7 January 2026
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8290111
27 December 2025
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8287761
3 July 2024
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7943913
10 May 2024
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7908566
27 June 2023
Examination of Repairs · MTSA Verification · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7719082
3 March 2022
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7405316
25 February 2022
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7403360
9 August 2018
Examination of Repairs · Internal Structural Exam · Hull Examination · COI Inspection · Cargo Tank Internal · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6499783
1 December 2017
Bulk Liquid Transfer Monitor
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6316540
12 July 2017
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6224242
17 January 2017
Examination of Repairs
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6072242
9 September 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5996437
26 July 2016
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5949240
9 April 2015
MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5099828
22 July 2014
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4930619
9 July 2014
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4915520
21 June 2013
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4726259
19 October 2011
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4171669
28 December 2010
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3916970
6 March 2010
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3691113
9 February 2010
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3677807
8 February 2010
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3676794
12 January 2010
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3662802
11 December 2009
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3649753
11 December 2009
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3664573
2 June 2009
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3537227
7 March 2009
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3434070
27 October 2008
Initial Certification · Cargo Tank Internal · MTSA Verification · Hull Examination · Initial Construction-Excluding Oversight · Internal Structural Exam · Administrative Inspection · Deadweight Survey
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3352390
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 27 December 2025
Resolved
When minor alterations or minor repairs of tank vessels become necessary such work shall be under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect at the time the vessel was contracted for or built, or in accordance with the regulations in effect for new construction insofar as possible. Pinhole leak in vapor header IVO #1 P/S "T" connection in vapor line. Epoxy and pipe patch installed. Proceed to VLS Port Arthur for permanent repairs to the satisfaction of CG Marine Inspector.
Action required: 705 - Other - as specified
Due 27 December 2025
Resolved 7 January 2026
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 25 February 2022
Resolved
Cargo piping systems shall be arranged and fabricated IAW this section and subchapter F. Reports of the Barge vapor line indicate there is a noticable leak on the vapor line via a hole. Barge is authorized a one-time temporary repair to transit to lake charles to discharge cargo at Calcasieu Refinery and then make permanent repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2022
Resolved 3 March 2022
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Pump
Issued 9 July 2014
Resolved
Provide documentation for cargo pump pressure relief valve. Annual testing has not been conducted.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 August 2014
Resolved 22 July 2014
Resolution: Releif valve was tested by third party. See attached documentation