Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)277.0 ft × 78.0 ft × 24.0 ft
Registered tonnagegross 4,110 / net 2,442
ITC dimensions (L × B × D)277.0 ft × 78.0 ft × 24.0 ft
ITC tonnagegross 4,110 / net 2,442
BuilderGUNDERSON MARINE LLC · PORTLAND, OR, UNITED STATES · built 2009
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPORTLAND, OR
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 23 April 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it4110 - Convention (Subpart B), Gross Ton 2442 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 29 inspections, each with its date, unit and type; 16 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 2 other vessels inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 June 2025Resolved
All tank vessels are subject to the regulations contained in subchapter J (Electrical Engineering) of this chapter except as such regulations are modified by the regulations in this subchapter for tank vessels. Observed that electrical connections were found loose near hazardous location (wire on port side's ESD boiler connection; wires on starboard side's ESD boiler connection and fuel shut off connection). Tighten wires. (46 CFR 31.35-1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 July 2025
Resolved 2 July 2025
Resolution: The vessel sent satisfactory photos of wires secure.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 May 2023Resolved
The visual examination includes, but is not limited to the combustion chamber, heat exchanger, refractory exhaust stack, and associated pumps and piping. Marine Inspector found thermal fluid heater relief valve piping leaking.
46 CFR 61.30-15
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2023
Resolved 9 May 2023
Resolution: Vessel replaced relief valve. MI comfirmed replacement and proper operation of thermal fluid heater.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2023Resolved
Each panelboard must have a non combustible enclosure. 440v cabinet in machinery space room missing screws and bottom locking latch. 46 CFR 111.40-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2023
Resolved 9 May 2023
Resolution: MI confirmed vessel replaced screws and locking latch.
Cracked welds in #1 void at 5th down strake from sheer
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 April 2019
Resolved 11 April 2019
Resolution: Made repairs
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 April 2019Resolved
Tankerman office electrical panel had improper over current breaker protecting receptacle outlets and was mislabeled in comparison with approved electrical plans.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2019
Resolved 11 April 2019
Construction/Loadline › Structures › Rake
Issued 29 September 2011Resolved
Make all rakes and voids safe for entry as per a Marine Chemist Certificate so an ISE can be completed NLT 14OCT11.
Action required: 705 - Other - as specified
Due 14 October 2011
Resolved 12 October 2011
Resolution: Conducted ISE.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 27 June 2011Resolved
Install blank in way of hole located on Breaker panel
Action required: 705 - Other - as specified
Due 1 July 2011
Resolved 11 July 2011
Resolution: Blank installed.
Deck/Cargo › Holds/Tanks › Coaming
Issued 27 June 2011Resolved
Replace gasket-stbd forward void
Action required: 705 - Other - as specified
Due 1 July 2011
Resolved 11 July 2011
Resolution: Replaced gasket with new.
Construction/Loadline › Structures › Rake
Issued 27 June 2011Resolved
Make Aft Rake ready for inspection.
Action required: 705 - Other - as specified
Due 1 July 2011
Resolved 11 July 2011
Resolution: Aft rake found dry.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 27 June 2011Resolved
Provide proof of annual service to all gauges
Action required: 705 - Other - as specified
Due 15 July 2011
Resolved 11 July 2011
Resolution: Annual service report completed
Prove proper operation of the Thermal Fluid Heater
Action required: 705 - Other - as specified
Resolved 13 July 2010
Resolution: Conducted operational test of thermal fluid heater. tested all alarms and shutdowns.
Renew stern light on pump house that was damaged during the container accident to original specifications. Vsl has provided a temporary stern light that meet the regulations.
Action required: 705 - Other - as specified
Due 21 October 2009
Resolved 2 October 2009
Renew pump house upper deck hand rails that were damaged in the container accident to original specifications.
Action required: 705 - Other - as specified
Due 21 October 2009
Resolved 30 September 2009
Construction/Loadline › Structures › Rake
Issued 19 September 2009Resolved
Vessel to complete satisfactory damage survey and internal structural exam of the stern rake void to the satisfaction of attending marine inspector and prior to cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 September 2009
Resolved 21 September 2009
Deck/Cargo › Cargo Heating › General
Issued 19 September 2009Resolved
Vessel to prove proper operation and tests of the thermal fluid heater to the satisfaction of attending marine inspector. Vessel restricted from using thermal fluid heating system until item cleared.
Action required: 705 - Other - as specified
Due 19 September 2009
Resolved 2 October 2009
Resolution: Conducted operational testing of Thermal Fluid Heater & alarms and shutdowns.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.