Records from 2010 to 2026. Most recent: inspection, 22 April 2026.
Documentation record
Registered dimensions (L × B × D)70.0 ft × 28.0 ft × 12.0 ft
Registered tonnagegross 157 / net 126
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderB & B BOAT BUILDERS · BAYOU LA BATRE, AL, UNITED STATES · built 2009
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 23 December 2025 · expires 31 December 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it157 - Simplified, Gross Ton
126 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 17
22 April 2026
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8354076
12 August 2025
Administrative Inspection · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8208048
22 August 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8068905
19 July 2023
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7748577
18 July 2023
Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7746548
8 September 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7307696
24 August 2021
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7294386
24 July 2021
Administrative Inspection · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7268179
14 July 2021
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7268822
27 October 2020
Administrative Inspection · Initial Certification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7089668
11 September 2019
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6809346
5 November 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6574500
2 November 2017
Administration · Industry Initiated Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6305881
21 February 2015
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5074510
13 November 2013
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4778400
24 June 2013
MARPOL · Industry Initiated Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4631223
7 December 2010
Industry Initiated Exam · Deficiency Check · MARPOL
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3909583
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 18 July 2023
Resolved
Machinery adn electrical systems must be designated and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Vessel reported loss of rudder. Provide evidence of repairs via technician report and approval letter from TPO.
46 CFR 143.205(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2023
Resolution: provided TPO report attesting to repairs
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 July 2021
Resolved
Vessel SAFETY FOREVER reported to the USCG that at mile marker 48 on the Black Warrior River, potentially lost its port rudder. Vessel company notified TPO and has diver enroute to assess situation. Vessel shall not proceed until USCG is provided information regarding vessel status with potential loss of port rudder.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 July 2021
Resolution: Received report and confirmation of loss of port rudder from diver, followed up with a second CG 835V to allow transit for repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 July 2021
Resolved
Vessel SAFETY FOREVER reported to the USCG that at mile marker 48 on the black warrior river, it potentially lost its port ruder. Vessel company notified TPO according to its TSMS. Diver on scene confirmed vessel lost its port rudder. The vessel SAFETY FOREVER may proceed to Blakely Boat works in Mobile, AL for repairs. The vessel may only transit during daylight hours due to its hindered status. Once at Blakely boat works, the vessel shall not depart the shipyard until USCG receives a TPO report regarding satisfactory repair of the port rudder and test of the port rudder.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 7 September 2021
Resolution: TPO provided corrective action report.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 11 September 2019
Resolved
Vessel reported a steering system casualty that impaired the normal maneuverability characteristics of the vessel. Repair steering system to ensure full functionality and normal maneuverability of vessel are restored. Deadship tow is authorized to Blakely Boatworks to complete repairs.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 September 2019
Resolved 17 September 2019
Resolution: Vessel representative provided sufficient technician report indicating the steering system had been repaired and was fully functiona;.
13 November 2013Routine · role: Transiting Vicinity of Primary Subject · activity 4778400
14 July 2021Routine · role: Involved in a Marine Investigation (non-casualty) · serious marine incident, as classified · 1 injured · activity 7268822
24 August 2021Routine · role: Involved in a Marine Casualty · activity 7294386
19 July 2023Routine · role: Involved in a Marine Casualty · activity 7748577
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source:
IIR, through 2026.