Records from 1992 to 2026. Most recent: inspection, 13 August 2026.
Inspection history · 33
13 August 2026
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8443260
30 July 2025
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8157826
25 June 2024
COI Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7928831
13 September 2023
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7791082
9 August 2023
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7764348
7 April 2022
In-Service Inspection · Administrative Inspection · Initial Certification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7426533
13 June 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6443524
14 March 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6111192
9 November 2015
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5760293
20 October 2010
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3877079
16 September 2010
MTSA Verification · Industry Initiated Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3851971
27 October 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3352246
11 June 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3233619
4 June 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3232903
11 January 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3352084
22 June 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2970038
19 May 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2967062
22 January 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2861612
12 September 2006
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2776786
24 July 2006
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2723329
24 July 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2723366
22 October 2005
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2520858
18 November 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1951418
12 September 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 20535
19 November 1995
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 73550
7 June 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 758126
24 May 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 196946
27 February 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 48689
8 February 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 144224
10 February 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 150848
21 October 1993
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 665891
9 September 1993
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 64842
23 December 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 51620
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 30 July 2025
Resolved
Two self contained breathing apparatus (SCBA's) must have a minimum 30 minute air supply and full face-piece.
MI's observed both SCBA's under 30 minute air supply. Provide service record of SCBA's meeting compliance.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2025
Resolved 5 August 2025
Resolution: Vsl Rep provided service invoice for the SCBA's
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 30 July 2025
Resolved
EPIRB must maintain valid proof of registration. MI's observed EPRIB registration MMSI number not meeting FCC certificate. Provide valid EPRIB registration matching FCC MMSI number.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2025
Resolved 5 August 2025
Resolution: Vsl Rep provided registration for EPIRB, MMSI number matches vessel MMSI.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 June 2024
Resolved
Each towing vessel must be maintained and operated so as to minimize fire hazards . Marine inspector found excessive oil and dirt on the port and stbd generator windings.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: Generators were cleaned and windings painted and cleaned.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 25 June 2024
Resolved
Storage areas are kept free from accumulation of combustible and flammable materials insofar as practicable. Marine Inspector found oil and paint thinner throughout the vessel.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: Picked up and cleared all paint and oil into proper place.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 June 2024
Resolved
Decks and bulkheads designed to be watertight or weather tight must be maintained in that condition. Marine inspector found numerous holes throughout the vessels watertight bulkheads.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: Water tight hole was patched and welded.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 June 2024
Resolved
Closure devices must be provided for deck house or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. Marine inspector found multiple hatches with worn seals.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: hatch was replaced as well as seal replaced.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 June 2024
Resolved
One 40-B portable fire extinguisher fitted in the engine room for each 1,000 brake horsepower of the main engines or fraction thereof. Marine inspector found that there were only three 40-B portable extinguisher in the engine room.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: new 40b installed with temporary 160b in place until installment.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 June 2024
Resolved
A 40-B portable fire extinguisher must be located near the storage room or cabinet. Marine inspector found in sufficient number of exstinguishers near flame locker
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: flame locker removed off board neededing no fire extingisher.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 June 2024
Resolved
A fixed fire pump must be capable of: delivering water simultaneously from the two highest hydrants, at a pressure 50 psi. Marine Inspector found the fire pump gauge was only showing 45 psi during operation.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: fire pump guage replaced, pump cleaned, replaced fire hose as well.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 June 2024
Resolved
All pressure vessels must have the MAWP indicated by a stamp, nameplate, or other means visible to the crew.Marine inspector found no data plate on the pressure vessel.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: data plate and pressure relief valves were replaced.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 25 June 2024
Resolved
Each towing vessel must be equipped with navigation lights in accordance with 33 CFR 84. Marine inspector found multiple navigation lights out on the mast.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: all new NAV lights installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 June 2024
Resolved
For towing vessels with berthing aboard, a sufficient number of additional life jackets must be carried so that a life jacket is immediately available for persons at each normally manned watch station. Marine Inspector found life jacket was missing from operating station.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: added sufficient amount of required and new life jackets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 June 2024
Resolved
Each towing vessel must perform the applicable tests in Table 143.245(b) of this section. The tests required by this section must be recorded in accordance with part 140 of this sub chapter. Marine inspector found safety relief valve on pressure vessel were last tested in May 2021.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 July 2024
Resolution: safety relief valves were replaced on both air receivers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 June 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Marine inspector found alternate means of steering was non operational.
Action required: 66 - Prior to drilling or production operations
Resolved 31 July 2024
Resolution: verified steering
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 June 2024
Resolved
All towing vessels must be operated in a manner that minimizes the risk of down-flooding and progressive flooding. Overhead penetration for searchlight control was found leaking.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 July 2024
Resolution: vessel headlightt was operational and in good working order.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 25 June 2024
Resolved
Vesseles fireifghting tank had a wrong PSI low psi. guage was believed to read time of air in minutes compared to the total PSI within each tank.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 31 July 2024
Resolution: tank had proper psi and air when checked the first time as as well as def check date.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 September 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Received a report of a leak from the ballast water tank into the adjacent lube oil tank through a crack. Vessel welded a doubler over the crack as a temporary repair. An approved repair plan is required prior to permanent repairs.
46 CFR 143.205(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2023
Resolved 19 October 2023
Resolution: Vessel Rep send class report from ABS attesting to the completion of repairs.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 22 August 2023
Resolved
Each towing vessel must be equipped with navigation lights, shapes, and sound signals in accordance with the International Regulations for Prevention of Collisions at Sea or 33 CFR 84 as appropriate to its area of operation. Vessel must repair/replace all broken navigation lights.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 August 2023
Resolution: Vessel sent photo of masthead lights functioning properly.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 22 August 2023
Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route. Vessel must repair hull penetrations for search lights, both are leaking.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 September 2023
Resolved 21 September 2023
Resolution: Operator's port engineer attended to determine cause. The packing requires grease to form the water tight seal. It was discovered that the bushing was lacking the proper amount of grease to form a watertight seal. Penetrations and packing glands serviced.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 9 August 2023
Resolved
Each towing vessel must be fitted with a general alarm that is capable of notifying persons in any accommodation, work space, and the engine room. Vessel must ensure the general alarm activates in the engine space when activated from the bridge.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 August 2023
Resolution: Vessel sent video of bridge general alarm actuating the engine room general alarm. System functioning as intended by regulations.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 June 2022
Resolved
Each towing vessel must have either a self-priming, power-driven, fixed fire pump, a fire main, and hoses and nozzles in accordance with paragraphs (a) through (d) of this section; or a portable pump, and hoses and nozzles, in accordance with paragraphs (e) and (f) of this section. Marine Inspector observed fire pump inop pressure when hoses were in operation. Prove that the fire pump can produce the required pressure with hoses operating to the satisfaction of the attending Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 June 2022
Resolution: Received evidence of required fire pump psi
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 14 June 2022
Resolved
Each towing vessel 79 feet or more in length operating on oceans and coastwise routes that does not have an installed fixed fire-extinguishing system must have the following:(a) At least two firefighter's outfits that meet NFPA 1971 (incorporated by reference, see § 136.112 of this subchapter); and(b) Two self-contained breathing apparatus of the pressure demand, open circuit type, approved by the National Institute for Occupational Safety and Health (NIOSH), under 42 CFR part 84. The breathing apparatus must have a minimum 30-minute air supply and full facepiece. Marine Inspector observed both SCBA bottles with less than 30 minutes air supply. Recharge bottles and prove to the satisfaction of the attending Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 June 2022
Resolution: SCBA bottles received service and were filled
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 June 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing
vessel and safety of persons onboard under normal and emergency conditions. Marine Inspector observed hot water relief valve on hot water tank did not have piping to bilge installed. Pipe relief valve to bilge and prove to the satisfaction of the attending Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 June 2022
Resolution: Relief valve on hot water tank properly piped into bilge via pvc piping
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 14 June 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing
vessel and safety of persons onboard under normal and emergency conditions. Marine Inspector observed excessive water dripping from port and starboard engine shaft seals into the bilges. Ensure shaft seals are tightened per manufacturers instructions and prove that bilge has been pumped free of water to the satisfaction of the attending Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 June 2022
Resolution: Shaft seals had packing plates adjusted for normal and safe operation
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 June 2022
Resolved
A towing vessel 79 feet or more in length must carry four lifebuoys, with one lifebuoy located on each side of the operating station. Lifebuoys must be at least 610 millimeters (24 inches) in diameter. Marine Inspector observed worn and wasted lifebuoys. Prove that lifebuoys have been renewed/replaced to the satisfaction of the attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 June 2022
Resolution: Both life ring buoys on second deck were replaced