Records from 2010 to 2024. Most recent: inspection, 25 July 2024.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · ASHLAND CITY, TN, UNITED STATES · built 2009
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 21 October 2025 · expires 30 November 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 17
25 July 2024
COI Inspection · MTSA Verification · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7964215
29 March 2023
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7689602
13 June 2019
COI Inspection · Cargo Tank Internal · Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6713091
13 July 2018
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6476387
24 January 2017
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6075421
3 June 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5904034
9 April 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5858671
24 February 2016
MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5821621
13 February 2015
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5070569
15 April 2014
Internal Structural Exam · Drydock Exam · Cargo Tank Internal · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4823440
13 January 2014
Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4782360
13 June 2013
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4619946
18 October 2012
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4477208
19 August 2011
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 4120756
30 January 2011
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3937406
22 October 2010
Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3875465
4 June 2010
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3757927
Deck/Cargo › Cargo Heating › General
Issued 18 October 2012
Resolved
Operational tests and checks must be conducted on fired thermal fluid heater in the presence of a marine inpsector prior to its operation.
Action required: 705 - Other - as specified
Resolved 28 March 2014
Resolution: Volcanic conducted full test of all safety shutdowns on the thermal fluid heater, all sat.
Deck/Cargo › Cargo Heating › General
Issued 22 October 2010
Resolved
Volcanic Thermal Fluid Heater's Cold Seal Tank does not have a flame screen on vent to atmosphere.
Due 22 October 2010
Resolved 22 October 2010
Resolution: Put 30X30 mesh flame screen on vent as required.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 22 October 2010
Resolved
Prime Mover's (a Detroit Diesel) Emergency Shutdown did not work for several times.
Due 22 October 2010
Resolved 22 October 2010
Resolution: Barge personnel worked on the emergency shutdown on the prime mover, and were able to demonstrate the proper operation of the shutdown. All Sat.