Inspection history · 56
6 February 2026
Appeal
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8317300
9 January 2026
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8294057
2 December 2025
Cargo Tank Internal · Administrative Inspection · Internal Structural Exam · COI Inspection · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8277862
11 August 2025
Administrative Inspection · Deficiency Check · Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8207864
10 August 2025
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8209461
11 March 2025
Examination of Repairs · Administrative Inspection · Damage Survey · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8092708
10 December 2024
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8046705
10 October 2024
Damage Survey · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8019232
30 July 2024
Bulk Liquid Transfer Monitor
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8005204
30 May 2024
Administrative Inspection · Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7923714
7 February 2024
Internal Structural Exam · Administrative Inspection · Hull Examination · Cargo Tank Internal
Physical examination · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 7859443
19 July 2023
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7752283
19 July 2023
Administrative Inspection · Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7763602
17 May 2023
Administrative Inspection · MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7689918
21 April 2022
Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7426903
13 April 2021
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7235869
21 January 2021
Drydock Exam · Internal Structural Exam · In-Service Inspection · Administrative Inspection · Examination of Repairs
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7127879
16 June 2020
Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6978709
17 April 2020
Administrative Inspection · Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6972470
8 April 2020
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6937166
6 May 2019
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6684204
13 February 2019
Examination of Repairs
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6650880
12 September 2018
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6542680
4 May 2018
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6406088
30 August 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6256239
29 August 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6265480
9 May 2017
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6229909
22 March 2017
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6134794
26 April 2016
MTSA Verification · Administrative Inspection · Drydock Exam · Internal Structural Exam · Examination of Repairs · Cargo Tank Internal · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5862408
27 April 2015
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5102314
27 March 2015
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5752257
17 October 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5008638
14 October 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5005843
6 October 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4998581
1 October 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4994817
26 September 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4990103
21 September 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4987368
28 August 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4991837
23 August 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4991907
20 August 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5000219
17 August 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5000237
15 August 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5000276
12 August 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5000175
7 August 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4995305
4 August 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4995313
9 June 2014
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4884245
7 May 2014
Deficiency Check · Periodic Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4864598
18 February 2014
Examination of Repairs · Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4801619
11 October 2013
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4739215
13 August 2013
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4684210
19 July 2013
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4658157
28 June 2013
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4661528
19 June 2013
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4627179
5 November 2012
MTSA Verification · MARPOL Annex I Examination · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 4479574
1 September 2011
Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4130821
16 June 2011
MTSA Verification · Initial Certification · Drydock Exam · Cargo Tank Internal
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3964188
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 April 2026
No resolution recorded
Only approved intrinsically safe, explosion proof, or purged and pressurized electrical equipment (Class I, Division 1 [Zone 1]) may be installed within 10 feet of a cargo tank vent outlet, cargo tank ullage opening, cargo pipe flange, cargo valve, cargo handling room entrance, or cargo handling room ventilation opening. Explosionproof lights on the forward side of the machinery space and tankerman space superstructures are within 10 feet of cargo valves, cargo pipe flanges, and cargo tank ullage openings but are rated for Class I, Division 2 use.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 May 2026 — due date passed with no resolution recorded
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 21 April 2026
Resolved
An unmanned ship subject to the SOPEP regulations must carry the notification list required in § 151.26(b)(3) on board in the documentation container, and an unmanned tank barge shall ensure that one English language copy of the Vessel Response Plan on board notification checklist and emergency procedures is maintained aboard the barge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 May 2026
Resolved 30 April 2026
Resolution: onboard
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 April 2026
Resolved
Stbd Aft Rake - 04 lights were not mounted
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 May 2026
Resolved 14 May 2026
Resolution: Lights are mounted
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 January 2026
No resolution recorded
On all tank vessels, the construction or conversion of which is started on or after July 1, 1951, the cargo piping shall be: A fixed cargo piping system shall be installed on a tank vessel carrying Grade A, B, or C cargo. A portable diesel engine-driven cargo pump is being utilized within a hazardous location, and portable cargo hoses are being used for cargo transfer operations. This arrangement does not comply with the regulatory requirements for hazardous area installations and fixed cargo piping systems on tank barges carrying Grade A, B, or C cargo. *Complete prior to operating in 2026.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 January 2026 — due date passed with no resolution recorded
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 2 December 2025
Resolved
Ensure the stern light is operational. Barge restricted to day light ops and during periods of good visibility.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 May 2026
Resolved 30 April 2026
Resolution: operational
12 - Dangerous Goods › N/A - No Subsystem › Special requirement
Issued 2 December 2025
No resolution recorded
Ensure the bravo light is properly mounted before next fuel transfer or hazardous material operations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 May 2026 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 December 2025
Resolved
Renew #11 bottom long in way of ladder in port aft void prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 7 May 2026
Resolution: ABS issued loadline
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 11 August 2025
Resolved
When minor alterations or minor repairs of tank vessels become necessary such work shall be under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect at the time the vessel was contracted for or built. On August 11, 2025, a vertical crack measuring approximately 4 inches was observed on the hawsepipe, extending from the hull to the weld seam. The fracture measures approximately 4 inches vertically from the hull plating to a weld seam on the hawsepipe, where it has propagated approximately 3 inches to either side along the weld seam. Vessel is to complete temporary repairs in Kotzebue, AK prior to departure.
46 CFR 30.01-10
Action required: 705 - Other - as specified
Resolved 19 August 2025
Resolution: Temp repair completed using cemet box patch.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 30 May 2024
Resolved
High level and overfill alarms must be identified in black letters, 2 inches high on a white background. High level and overfill alarms were not identified.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 June 2024
Resolved 19 August 2025
Resolution: High level and overfill alarms labled
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 May 2023
Resolved
Electrical equipment located within the hazardous zone must be intrinsically safe or explosion proof. The rated electrical conduit for the High Level Alarm system is broken in multiple locations and needs to be repaired prior to cargo ops.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2023
Resolution: Electrical conduit renewed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 May 2023
Resolved
No person may use any of the equipment listed in 33 CFR
156.170 for transfer operations,unless the required tests and inspections have been completed. Cargo piping must be tested to 1.5 times the maximum working pressure annually or provide proof of a working pressure test.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2023
Resolution: Piping tested and marked.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 17 May 2023
Resolved
No person may use any of the equipment listed in 33 CFR
156.170 for transfer operations, unless the required tests and inspections have been completed. Cargo pump pressure relief valves must open at or below the pressure it is set to open. Provide report certifying relief valves have been tested satisfactorily.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2023
Resolution: PRV Tested sat.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 17 May 2023
Resolved
No person may use any of the equipment listed in 33 CFR
156.170 for transfer operations, unless the required tests and inspections have been completed. Cargo transfer pressure gauges must show within 10 percent of the actual pressure. Provide test report certifying gauges meet have been tested.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2023
Resolution: New guages installed onboard.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 May 2023
Resolved
Bow cargo ramp supports have broken through the support frame of the ramp and prevent safe securing of the ramp for sea. Make permanent repairs prior to operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2023
Resolution: Support brackets repaired.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 May 2023
No resolution recorded
In hazardous areas machinery and electrical equipment must be approved for the installation by MSC. The portable diesel engine driven cargo pump must be approved for operation within the hazardous zone or modified to place the engine and electrical components outside the hazardous zone (10 ft). Due to be completed no later than December 1, 2023**
Action required: 705 - Other - as specified
Due 1 December 2023 — due date passed with no resolution recorded
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 17 May 2023
Resolved
Make starboard forward rake access hatch watertight. Hatch has 2 broken dogs and will not seal.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2023
Resolution: Dawgs repaired and hatch seals.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 May 2023
Resolved
Vessels exposed to saltwater for more than 6 months in any 12 month period are subject to the drydock and internal structural exam schedule listed in table 46 CFR 31.10-21(a). The barge was granted a 5 year freshwater drydock cycle in April 2021 and has since been exceeding the 6 months in saltwater. The new drydock and internal structural exam due date will be April 30, 2024. The DD/ISE cycle will be twice in 5 years and be reflected on the amended COI.
Action required: 10 - Deficiency Rectified
Resolved 17 May 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 13 April 2021
Resolved
Each vessel subject to load line requirements shall carry on board a valid certificate attesting to compliance with such requirements. Vessel does not have a current/issued Load Line Certificate.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 23 June 2021
Resolution: Received confirmation/copy of Load Line Certificate
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 13 April 2021
Resolved
The owner or operator of all unmanned tank barges shall ensure that one English language copy of the plan section listed in paragraph (c)(9) of this section and the Coast Guard approval letter is maintained aboard the barge. No approval letter was available on board.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 23 June 2021
Resolution: Received confirmation that VRP approval is on board
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 13 April 2021
Resolved
An unmanned ship subject to this regulation must carry the SOPEP notification list required in § 151.26(b)(3) on board in the documentation container. Vessel did not have notification list or even approval letter.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 23 June 2021
Resolution: Received confirmation of SOPEP document on board
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 13 April 2021
Resolved
The operator of a vessel with a capacity of 250 or more barrels of oil shall provide transfer procedures that meet the requirements of this part and part 156 of this chapter for transferring. Vessel did not have available transfer procedures.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 23 June 2021
Resolution: Received confirmation/copy of transfer procedures that are on board
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 April 2021
Resolved
Electric installations on vessels must ensure protection of passengers, crew, and the vessel from electrical hazards. Distribution panel was missing knockouts.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 23 June 2021
Resolution: Received photographic evidence of replacement of knockouts
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 13 April 2021
Resolved
The vessel operator shall keep a written record available for inspection by the COTP or OCMI of the date and result of the most recent test and inspection of each item tested or inspected as required by § 156.170 of this chapter, including each transfer system relief valve. Vessel did not have relief valve test records.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 16 July 2021
Resolution: Test were performed
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 13 April 2021
Resolved
Each transfer pipe system must not leak under static liquid pressure at least 1 1/2 times the maximum allowable working pressure, tested at least annually or as part of the biennial and mid-period inspections. Alternative test pressures of not less than 100% MAWP may be used for in-service annual cargo piping tests, provided that a 150% MAWP test of the cargo piping is conducted at least twice in any 5-year period. Pipeline pressure test had not been completed.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 16 July 2021
Resolution: Tests were performed
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 13 April 2021
Resolved
Tank barges may be permitted to transport deck cargoes directly over bulk cargo spaces when the nature of such deck cargoes and the methods of loading and unloading same do not create an undue hazard. Intermodal portable tank with flammable liquid is being carried as additional cargo.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 23 June 2021
Resolution: Received confirmation from management that the ISO tank was used in the yard only for fueling yard equipment
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 13 April 2021
Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked. Emergency shut down is not marked or labeled.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 23 June 2021
Resolution: Received photographic evidence of marking of emergency shut off
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 16 June 2020
Resolved
Cracks in containment/expansion dome #5 Port.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 June 2020
Resolution: Crackes Drill stopped, welded, and pressure tested.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 16 June 2020
Resolved
Cracks in containment/expansion dome #4 Stbd.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 June 2020
Resolution: Crackes Drill stopped, welded, and pressure tested.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 16 June 2020
Resolved
Cracks in containment/expansion dome #3 Port.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 June 2020
Resolution: Crackes Drill stopped, welded, and pressure tested.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 6 May 2019
Resolved
Remove exercise equipment from aft rake. Space not authorized for manned attendance.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 May 2019
Resolution: Items removed from vessel prior to inspection completion.
01 - Certificates & Documentation › 013 - Documents › STS Operation Plan and Records of STS Operations
Issued 10 May 2018
Resolved
STS Manual was not available on this date
33CFR156.400
Action required: 705 - Other - as specified
Resolved 26 June 2018
Resolution: Received email with ABS approved STS plan
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 May 2018
Resolved
Annual pipe and hose testing had not yet been completed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 June 2018
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 9 May 2017
Resolved
Provide proof of annual cargo piping working pressure test.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 May 2017
Resolved 12 May 2017
Resolution: Records received
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 9 May 2017
Resolved
Provide hose test records for all cargo hoses.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 May 2017
Resolved 12 May 2017
Resolution: Hose test records received.
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 9 May 2017
Resolved
Remove gas powered air compressor from barge or move outside of the hazardous gas zone.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 May 2017
Resolved 12 May 2017
Resolution: Compressor moved.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 9 May 2017
Resolved
Provide exhaust lagging for generator and cargo pump engine exhaust manifolds and turbos.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 12 May 2017
Resolution: Lagging installed.
Engineering › Fuel Oil Service System › Gauge
Issued 7 May 2016
Resolved
Repair or replace oil pressure gauge on generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 June 2016
Resolved 7 June 2016
Resolution: Gauge replaced.
Documentation › Safety Management System › Safety/Environmental Protection Policy
Issued 7 May 2016
Resolved
Provide evidence that company is following the Benzene Monitoring Program as required by 46CFR197, Subpart C.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 June 2016
Resolved 7 June 2016
Resolution: Proper documentation provided.
Construction/Loadline › Hull › Transverse Frame
Issued 26 April 2016
Resolved
CT #3S - C/R transverse deep web #3 IWO BL #3.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 7 May 2016
Resolution: Repairs satisfactory.
Construction/Loadline › Hull › Hull Plating
Issued 26 April 2016
Resolved
Complete repairs identified per AVEC-183, AVEC-208 List of discrepancies.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 7 May 2016
Resolution: Repairs were completed satisfactorily and tanks air tested.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 26 April 2016
Resolved
Remark draft marks & loadline marks.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 7 May 2016
Resolution: Markings renewed and Loadline Certificate issued by ABS.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 26 April 2016
Resolved
Complete 1.5 times MAWP static liquid test of cargo piping prior to cargo ops.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 April 2016
Resolved 11 August 2016
Resolution: Statement of satisfactory testing completed on 5/13/16.
Stability › Incline Test › General
Issued 26 April 2016
Resolved
Prove aggregate weight change does not exceed 2% of lightship & LCG does not shift by more than 1% of barge LBP in regard to spud removal.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 6 May 2016
Resolution: Received letter from Jensen Naval Architects dated May 6, 2016 stating the lightship change is 0.20% and the LCG is 0.08%.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 May 2014
Resolved
Remove unapproved extension cord from tankerman's deck house and if outlet is desired for use, install using good marine practice using approved wiring practices for the location served.
Action required: 705 - Other - as specified
Due 30 May 2014
Resolved 30 May 2014
Resolution: Received pictures of deck house showing removal of improperly run extension cord.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 7 May 2014
Resolved
Provide data plate for missing plate on PV Valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2014
Resolution: Vessel provided photo showing data plate on PV.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 1 September 2011
Resolved
Amend transfer procedures to include list of each product transferred to or from vessel & their characteristics.
Due 1 October 2011
Resolved 30 September 2011
Resolution: Rcvd e-mail w/ amended procedures. Examined/cleared.
Documentation › Markings/Placards › Warning Signs
Issued 1 September 2011
Resolved
Install benzene sign at each access to regulated area.
Due 1 October 2011
Resolved 10 October 2011
Resolution: Rcvd e-mail picture indicating sign painted on side of pump house. Examined/cleared.