Records from 2011 to 2026. Most recent: inspection, 17 April 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 April 2026
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. The valve must be operable from a safe place outside the space where the valve is installed. Port engine room fuel shut off pull cable found broken rendering remote shut off inoperable.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 April 2026
Resolution: repaired
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 20 April 2026
Resolved
The master of a towing vessel must ensure that drills are conducted and instructions are given to ensure that all crewmembers are capable of performing the duties expected of them during emergencies. This includes abandoning the vessel, recovering persons from the water, responding to onboard fires and flooding, Vsl is required to conduct fire, man overboard, and abandon ship drills to the satisfaction of the attending Marine Inspector prior to operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2026
Resolution: Conducted drills pierside
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 20 April 2026
Resolved
A power driven vessel underway shall exhibit a stern light. Stern light found inoperable. Vessel restricted to daylight and periods of good visibility operations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2026
Resolved 30 April 2026
Resolution: repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 April 2026
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. MI found the following: exposed wire in space beneath wheelhouse, unsecure fiddley outlet, and missing cover on bunkroom outlet.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2026
Resolved 30 April 2026
Resolution: repaired
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 20 April 2026
Resolved
Towing vessels must be equipped with the following equipment, as applicable to the area of operation: Search light, controllable from the vessel’s operating station and capable of illuminating objects at a distance of at least two times the length of the tow. Vsl’s search light found inoperable.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2026
Resolved 30 April 2026
Resolution: repaired
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 20 April 2026
Resolved
Each escape hatch and emergency exit used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: ‘‘EMERGENCY EXIT, KEEP CLEAR’’. MI identified multiple locations missing labels.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2026
Resolved 6 May 2026
Resolution: labeled
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 20 April 2026
Resolved
Each watertight door and watertight hatch must be marked on both sides in clearly legible letters at least 25 millimeters (1 inch) high: ‘‘WATERTIGHT DOOR—KEEP CLOSED’’ or ‘‘WATERTIGHT HATCH—KEEP CLOSED’’. MI identified multiple locations missing labels.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2026
Resolved 6 May 2026
Resolution: labeled
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 24 April 2025
Resolved
Prove proper operation of bridge navigational watch alert system.
Action required: 10 - Deficiency Rectified
Resolved 24 April 2025
Resolution: captain figured out how to operate system
10 - Safety of Navigation › N/A - No Subsystem › Voyage or passage plan
Issued 24 April 2025
Resolved
Ensure navigational assessments are conducted and maintained. No past nav assessments could be produced.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2025
Resolution: navigational was completed for upcoming trip
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 24 April 2025
Resolved
Fresh water pump was leaking at pipe connections, repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 April 2025
Resolution: repaired
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 24 April 2025
Resolved
Gauge on fire pump was inaccurate, repair/renew
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2025
Resolved 28 April 2025
Resolution: renewed
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 15 May 2024
Resolved
Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or higher class license. Vessel's mariners do not have any FCC license for operating a maritime station. 47 CFR 80.163
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 15 May 2024
Resolved 30 May 2024
Resolution: FCC Licenses were present.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 15 May 2024
Resolved
Each towing vessel must be equipped with an industrial type first aid cabinet or kit, appropriate to the size of the crew and operating conditions. Each towing vessel operating on oceans, coastwise, or Great Lakes routes must have a means to take blood pressure readings, splint broken bones, and apply large bandages for serious wounds. Medications on board are all expired. 46 CFR 140.435
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 15 May 2024
Resolved 30 May 2024
Resolution: All expired Meds were replaced.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 15 May 2024
Resolved
Each towing vessel must be equipped with a means to detect smoke in the berthing spaces and lounges that alerts individuals in those spaces. This may be accomplished by an installed detection system, or by using individual battery-operated detectors meeting UL 217. Detection systems or individual detectors must be kept operational at all times when the crew is onboard the towing vessel. Vessel's berthing spaces on Deck 1 are missing.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 15 May 2024
Resolved 30 May 2024
Resolution: Smoke detectors were installed and tested.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 15 May 2024
Resolved
Towing vessels must be equipped with an illuminated magnetic compass. The compass must be readable from each operating station. Vessel's magnetic compass is disconnected from power necessary to illuminate the compass. 46 CFR 140.725(d)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 30 May 2024
Resolution: Proof was provided to show part was on order.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 May 2024
Resolved
At least two lifebuoys on a towing vessel greater than 26 feet must be fitted with a floating electric water light approved under approval series 161.010 or 161.110. One of the vessel's water lights on a lifebuoy was expired and inoperable. 46 CFR 141.360(c)(2)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 30 May 2024
Resolution: Water light was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 May 2024
Resolved
Piping and machinery components that exceed 220 °C (428 °F), including fittings, flanges, valves, exhaust manifolds, and turbochargers, must be insulated. Lagging on the Port MDE and Stbd MDE are missing lagging on the portions of the exhaust piping (port/stbd), while other lagging is damaged (port). 46 CFR 143.220(b)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 30 May 2024
Resolution: Custom lagging is on order but in the meantime, header tape was used.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 15 May 2024
Resolved
Each towing vessel must have a low hydraulic steering fluid level alarm, if applicable, which must be visible and audible at each operating station. Steering control panel was inoperable at the time of inspection. After replacing fuse, low hydraulic steering fluid level alarms on the #1 and #2 steering units were visible but not audible. 46 CFR 143.230(a)(6) & (b)(1)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 30 May 2024
Resolution: Alarm was tested and was audible.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 May 2024
Resolved
Each towing vessel must have a low fuel level alarm, if fitted with a day tank. Vessel's two day tanks (FO1.P and FO1.S; the port and stbd day tanks) do not have low fuel level alarms. 46 CFR 143.230(a)(7)
Extended until end of season.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2024
Resolved 24 April 2025
Resolution: installed and test sat
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 May 2024
Resolved
Flammable and combustible products must not be stored in machinery spaces, unless they are stored in a suitable container that meets the requirements of § 142.225 of this subchapter. If a storage room is provided, it may be any room or compartment that is free of ignition sources. Vessel is storing flammable/combustible products in the engine room outside of a storage cabinet and in the lazarette where lighting is not explosion proof. 46 CFR 143.220(c) & 46 CFR 142.225(b)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2024
Resolved 30 May 2024
Resolution: Flam locker was installed forward of the engine room away from sources of ignition.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 May 2024
Resolved
All installed bilge piping must have a check/foot valve in each bilge suction that prevents unintended backflooding through bilge piping. All bilge suction points are not provided with a check/foot valve. 46 CFR 143.275
Extended until end of season.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2024
Resolved 24 April 2025
Resolution: check valves installed in manifold
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 May 2024
Resolved
The frame or support of any semi-portable fire extinguisher fitted with wheels must be welded or otherwise permanently attached to a steel bulkhead or deck to prevent it from rolling under heavy sea conditions. 160-B for engine room is not secured as such. 46 CFR 142.230(c)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2024
Resolved 30 May 2024
Resolution: Semi-Portable extinguisher was bolted to frame.
09 - Working and Living Conditions › 092 - Working Conditions › Entry dangerous spaces
Issued 15 May 2024
Resolved
A carbon dioxide system must meet the requirements of 46 CFR 78.47-11 (carbon dioxide warning signs). Vessel does not have required signage on engine room entrance for spaces protected by carbon dioxide. 46 CFR 136.110 & 46 CFR 78.47-11(b)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2024
Resolved 30 May 2024
Resolution: Signage was installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 June 2023
Resolved
Electrical connections must be suitably installed to prevent them from coming loose through vibration or accidental contact. MI found dead ended wire in engine room near steering pumps.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 May 2024
Resolution: No observed loose wiring was near steering pump motors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 June 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The sewage discharge pump was not mounted and was held in place by discharge piping. Properly mount sewage discharge pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 May 2024
Resolution: Sewage pump was mounted at the time of inspection.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 17 May 2023
Resolved
Crewmembers are required to have pre-employment drug testing with a negative result prior to assuming duties and be enrolled in a random testing program. Two crewmembers did not have pre-employment testing and were not listed on the covered employees list. Provide proof of completion prior to using members as crew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2023
Resolution: Proof of enrollment provided to MI.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 May 2023
Resolved
Vessel fuel tanks original sight glasses have been broken/abandoned and replace with an improvised clear plastic hose attached to the stripping valve and tank top with no closure device. Remove the plastic hose sight glass system, seal the tank and return all to original.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2023
Resolved 24 April 2025
Resolution: sight glassess installed with proper protection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 May 2023
Resolved
Electrical systems must provide for the safe operation of the towing vessel. Provide a tech report showing that all adjustable circuit breakers for the generators and shore tie are set not more than 115% of the rated load for each. Or provide the appropriate size circuit breaker for each component.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2023
Resolution: Tech report provided to MI.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 17 May 2023
Resolved
The fire detection system is required to have two power sources. The battery power source was identified as needing replacement on the servicing report. Provide new batteries as identified.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2023
Resolution: New batteries installed and verified.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 17 May 2023
Resolved
Fire damper for port engine room ventilation fire damper is missing actuation mechanism. Prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2023
Resolution: Fire damper operates as required.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 17 May 2023
Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting was not functioning. Prove proper operation of all emergency lights.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2023
Resolution: Emergency lighting operation proven.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 17 May 2023
Resolved
Prove proper operation of the MSD system and secure overboard valve. Prior to operations
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2023
Resolution: MSD is operating correctly.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 May 2023
Resolved
Vessel must complete the remainder of the annual exam with a Sector Anchorage Marine Inspector. Fire, abandon
ship, and man overboard drills to be completed; Testing of the fire and bilge systems; Emergency Lighting test; completion of machinery testing, etc.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 June 2023
Resolution: COI Inspection Completed.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 17 May 2023
Resolved
Essential systems or equipment must be regularly tested and examined. Tests and examination procedures must be in accordance with manufacturer's instructions. Each towing vessel must perform the alarm set point testing "twice in any five year period" (table 46 CFR 143.245 (b)). Vessel was unable to prove operation of machinery alarm set points and provided no records of testing. Make required tests during completion of annual exam.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 June 2023
Resolution: Tech report provided to MI.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 17 May 2023
Resolved
Exposed hazards such as rotating machinery must be protected by a cover, guard, or rail. The propulsion shafts are exposed with no protection and are creating a personnel hazard.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 June 2023
Resolution: Guards reinstalled in engine room.
09 - Working and Living Conditions › 092 - Working Conditions › Danger areas
Issued 17 May 2023
Resolved
Piping and machinery components that exceed 428 deg F, must be insulated. Provide insulation for missing sections of all main engine and generator exhaust systems.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 June 2023
Resolution: Lagging covered all hot surfaces.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 17 May 2023
Resolved
Provide a valid FCC Bridge to Bridge Radiotelephone Certificate as required by 47 CFR 80.1001
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 June 2023
Resolution: FCC certificate provided.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 May 2023
Resolved
Vessels exposed to saltwater for more than 6 months in any 12 month period are subject to a "twice in five year" drydock and internal structural exam schedule as required by 46 CFR 137.300(a)(1). The vessel was granted a 5 year freshwater drydock cycle in April 2019 and has since exceeded 6 months in salt water service for the past two years. The DD/ISE cycle will be changed to twice in 5 years and be reflected on the amended COI. Next DD/ISE is currently due NLT March 30, 2024.
Action required: 10 - Deficiency Rectified
Due 17 May 2023
Resolved 17 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 21 April 2022
Resolved
Machinery systems must be designed and maintained for safe operation and safety of persons onboard. Guard on main propulsion machinery is warped from heat and contacting moving machinery. Replace guards for safety of the crew.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 August 2022
Resolution: Recieved photos of guards for main engines replaced.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 21 April 2022
Resolved
Vessel must have operable navigation lights. Port and starboard running lights are not operable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 April 2022
Resolution: Received pictures of new navigation lights installed and operatable.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 April 2022
Resolved
Vessel must have two maintained lifebuoys. Both lifebuoy plugs are missing and must be replaced.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 April 2022
Resolution: Recieved pictures of plugs replaced in lifebuoys.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 12 April 2021
Resolved
Pressure vessels over 5 cubic feet must be equipped with an indicating gauge. One is missing a gauge and the other only reads to 300 psi but the MAWP is 350 psi (46 CFR 143.300(a)).
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 May 2021
Resolved 21 April 2021
Resolution: corrected
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 12 April 2021
Resolved
Pressure vessels over 5 cubic feet must be equipped with one or more spring-loaded relief valves. Forward most air receiver missing relief valve (46 CFR 143.300(a)).
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 May 2021
Resolved 21 April 2021
Resolution: corrected
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 April 2021
Resolved
Electrical conductors passing through watertight bulkheads must be installed so the bulkhead remains watertight. Forward bulkheads of lazarette and runner room have electrical conductors passing through unprotected (46 CFR 143.400(h)).
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 21 April 2021
Resolution: corrected
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 12 April 2021
Resolved
Decks and bulkheads designed to be watertight must be maintained in that condition. Engine room forward bulkhead has fuel oil pipe going through unprotected (46 CFR 140.610(f)).
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 21 April 2021
Resolution: corrected
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 April 2021
Resolved
Fire pump must be capable of delivering 50 psi. Gauge indicated 47 psi (46 CFR 142.325(a)(1)).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2021
Resolved 9 June 2021
Resolution: Reviewed short video attached to email of the fire pump exceeding 50 psi (~57 psi).
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 12 April 2021
Resolved
Machinery must be maintained to provide for safe operation of the towing vessel and safety of person onboard. Emergency steering repeater and bridge steering indicator don't agree. Synchronize (46 CFR 143.205(a)).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 May 2021
Resolved 26 April 2021
Resolution: Rcvd attached technician rpt indicating repair/properly operating.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 May 2019
Resolved
Vessel is installing a 65 kw John Deere generator to replace a 58 kw CAT generator. New Installations must be made IAW Subpart C of 46CFR143. Submit plans to OCMI for approval.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2019
Resolved 23 May 2019
Resolution: Rcvd ltr with required info.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2019
Resolved
Bilge discharge pipe leaks between hull and valve. Repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2019
Resolved 22 May 2019
Resolution: Received letter and photos of repaired bilge piping.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 6 May 2019
Resolved
Missing lagging in engine room. Ensure all required lagging in engine room is in place.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2019
Resolved 22 May 2019
Resolution: Received letter and photos of lagging in place.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 May 2019
Resolved
Forward main deck emergency lighting was not operational. Repair.
Action required: 10 - Deficiency Rectified
Resolved 6 May 2019
Resolution: Light was repaired.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 August 2018
Resolved
Vsl required to be hauled out and inspected by the USCG.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 13 February 2019
Resolution: Vessel was hauled out.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 7 August 2018
Resolved
Crop and renew buckled portion of frame 14 IWO center tunnel (approx. 32" X 80").
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 28 March 2019
Resolution: Buckle renewed and sat NDT conducted
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 7 August 2018
Resolved
Crop and renew temp repair to bottom centerline girder.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 28 March 2019
Resolution: Permanent repairs made.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 7 August 2018
Resolved
Crop and renew temp repair to bottom longitudinals 2, 3, and 4 stbd between frames 11 and 12.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 28 March 2019
Resolution: permanent repairs made
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 7 August 2018
Resolved
Crop and renew buckled fwd bulkhead of stbd freshwater tank.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 28 March 2019
Resolution: repairs made
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 7 August 2018
Resolved
Crop and renew buckled fwd bulkhead of port freshwater tank.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 28 March 2019
Resolution: repairs made
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 7 August 2018
Resolved
Crop and renew buckled port and stbd vertical supports and webbing IWO aft bulkhead of freshwater tanks.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 28 March 2019
Resolution: verticle supports repaired