MAURY USCG vessel records
← All vessels

MILLIE

MILLIE is a 2011 towing vessel. The Coast Guard has recorded 18 inspections since 2011, most recently in May 2026, along with 52 deficiencies — 2 with no resolution recorded — and 1 casualty investigation in 2013.

Records from 2011 to 2026. Most recent: inspection, 13 May 2026.

Built
2011
Last inspected
13 May 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Inspection record

Last inspected 13 May 2026
…with no type recorded2
…past their stated due date1
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2011–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDM3082
1109582
Flag
UNITED STATES
Maury page id
psix-1109582

Documentation record

Registered dimensions (L × B × D)88.1 ft × 36.0 ft × 8.5 ft
Registered tonnagegross 165 / net 112
ITC dimensions (L × B × D)88.1 ft × 36.0 ft × 8.5 ft
ITC tonnagegross 268 / net 80
BuilderFRED WAHL MARINE CONSTRUCTION INC · REEDSPORT, OR, UNITED STATES · built 2011
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portDILLINGHAM, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 9 April 2026 · expires 31 May 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it112 - Regulatory (Subpart C or D), Net Ton
80 - Convention (Subpart B), Net Ton
165 - Regulatory (Subpart C or D), Gross Ton
268 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

18 inspections, each with its date, unit and type; 52 deficiencies with the resolution recorded against each; 3 vessels inspected with it, by name and date; 1 other recorded name, with years; 1 casualty investigation, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1980 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 3

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

ARI CRUZ Towing Vessel · MISLE 419594 · 24 November 2013 · activity 5114221CAVEK Towing Vessel · MISLE 1108651 · 24 November 2013 · activity 5114221MISS ILA Towing Vessel · MISLE 80201 · 26 August 2013 · activity 4736339

Inspection history · 18

13 May 2026 Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8372769
30 April 2026 Damage Survey · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8358426
18 December 2025 Examination of Repairs · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8286454
14 May 2025 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8136221
17 January 2025 Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8064889
21 August 2024 Administrative Inspection · Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7986898
7 May 2024 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7908734
8 February 2024 Administrative Inspection · Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7861758
25 April 2023 MTSA Verification · Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7675806
7 June 2022 Deficiency Check · Annual Inspection · Administrative Inspection · MTSA Verification · DAPI Audit
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7471561
30 April 2021 Administrative Inspection · Deficiency Check · Initial Certification · MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7190212
15 April 2021 Administrative Inspection · Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7199207
6 December 2019 Spot Check · Internal Structural Exam · Administrative Inspection · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6868396
22 December 2017 Administrative Inspection
Administrative · Navigation Center · Activity 6327838
2 May 2017 Spot Check (Safety)
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6308495
24 November 2013 Type not recorded
No type recorded · Suspension & Revocation National Center of Expertise · Activity 5114221
26 August 2013 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4736339
20 June 2011 Industry Initiated Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4051426

Deficiency record · 52

07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 May 2026 Resolved
The fire main system must be charged, and sufficient pressure must be verified at the most remote and highest outlets. Excessive amounts of water was observed to be leaking from the fire pump shaft, pressure side.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: tested sat
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 May 2026 Resolved
Portable and semi-portable fire extinguishers must be inspected, maintained, and tested in accordance with the inspection, maintenance procedures, and hydrostatic pressure tests required by Chapters 7 and 8 of NFPA 10, Standard for Portable Fire Extinguishers (incorporated by reference, see § 136.112 of this subchapter), with the frequency specified by NFPA 10. No servicing records were available proving annual servicing of the semi-portable fire extinguisher.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: provided
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 19 May 2026 Resolved
Means must be provided for stopping each fan in a ventilation system serving machinery spaces and for closing, in case of fire, each doorway, ventilator, and annular space around funnels and other openings into such spaces. Machinery space ventilation damper on starboard side found with spring closure device disconnected.
Action required: 10 - Deficiency Rectified
Resolved 19 May 2026
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 19 May 2026 Resolved
All lifesaving equipment must be tested and maintained in accordance with the minimum requirements of § 199.190 of this chapter, as applicable, and the vessel's TSMS, if the vessel has a TSMS. The starboard rigid life raft has expired seasickness medication and expired water packages and floating ring life buoy light has expired battery.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: renewed
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 May 2026 Resolved
Lifejackets must be readily accessible. The lower AB state room was missing (01) lifejacket and the ENG stateroom was missing (02) lifejackets.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: provided
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 19 May 2026 Resolved
All fire-detection equipment and systems on board a towing vessel must be maintained in accordance with the attached nameplate and manufacturer's approved design manual. The fire detection system is inoperable; the alarm panel is displaying “system trouble” and “PSU trouble” alarms.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: battery renewed, no trouble light
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 May 2026 Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must: Be maintained to ensure proper operation. An exhaust leak was observed on the port and starboard generator.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 May 2026 No resolution recorded
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Aft “house” generator found with excessive oil build up and rear leaking main seal. **26MAY26** changed action to 705 - prior to use as vsl crew stated they do not use during operating season and plan to renew house generator
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2026 Resolved
Repairs and minor alterations to existing towing vessels must be made in accordance with this part. Remove sump pump installed in the “decanting” tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: pump removed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2026 Resolved
All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquid, as those terms are defined in 46 CFR subpart 30.10, into the machinery space. Day tank stripping valve found leaking fuel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: drain capped
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2026 Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must: Be maintained to ensure proper operation. Port main engine found with unsecured lagging on turbo.
Action required: 10 - Deficiency Rectified
Resolved 19 May 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2026 Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. The aft starboard ballast tank goose neck vent guard found unsecured.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: repaired
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 19 May 2026 Resolved
Each towing vessel must be equipped with an industrial type first aid cabinet or kit, appropriate to the size of the crew and operating conditions. First aid kit found with expired medication and eyewash station in engine room found with unknown last date of service.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2026
Resolved 26 May 2026
Resolution: renewed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 May 2026 Resolved
Electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Dead end wires were found near port shaft on aft engine room bulkhead.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: wires placed in j-box
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 19 May 2026 Resolved
Except as provided in paragraph (d) or (e) of this section, a towing vessel with overnight accommodations and alternating watches (shift work), when pulling, pushing or hauling alongside one or more barges, must have a system to detect when its master or mate (pilot) becomes incapacitated. The vessel does not have a pilothouse alerter system installed onboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2026
Resolved 10 July 2026
Resolution: Vsl installed alerter system.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 May 2026 Resolved
Each watertight door and watertight hatch must be marked on both sides in clearly legible letters at least 25 millimeters (1 inch) high: “WATERTIGHT DOOR—KEEP CLOSED” or “WATERTIGHT HATCH—KEEP CLOSED”. The watertight doors on the main deck and the watertight hatch were not labeled.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2026
Resolved 26 May 2026
Resolution: labeled
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 19 May 2026 No resolution recorded
Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space. Engine room emergency lighting did not light emergency escape path.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2026 — due date passed with no resolution recorded
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 May 2026 Resolved
In each crew berthing area, sexual assault and sexual harassment information, as required by 46USC11101, must be posted. Required information was not posted onboard. 46 USC 11101 (MISLE not updated with applicable code)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2026
Resolved 26 May 2026
Resolution: posted
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 May 2026 Resolved
Chemical testing of personnel must be conducted as required by this subpart and in accordance with the procedures detailed in 49 CFR part 40. No records could be provided of crew enrollment or testing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2026
Resolved 26 May 2026
Resolution: provided
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 19 May 2026 Resolved
Where practicable, each space where crew may be quartered or normally employed must have at least two means of escape. The forward emergency escape ladder on the starboard side was blocked.
Action required: 10 - Deficiency Rectified
Resolved 19 May 2026
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 May 2026 Resolved
Each towing vessel must be equipped with shapes in accordance with the 33CFR84. Day shapes for anchoring were missing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2026
Resolved 26 May 2026
Resolution: provided
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 19 May 2026 Resolved
Records, unless required to be maintained for a longer period by statute or other federal regulation, must be retained for at least 1 year after the date of the latest entry. The crew was unable to provide Towing Vessel Record entries for various items to be recorded under 46 CFR 140.915, such as navigation assessments, oil residue discharges, inspection of towing gear, etc.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2026
Resolved 26 May 2026
Resolution: being kept electronically
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 May 2026 Resolved
A 40-B portable fire extinguisher must be located near the storage room or cabinet. This is in addition to the the portable fire extinguishers required by tables 142.230(a) and 142.230(b) of this part. Portable 40-B extinguishers missing near engine room flammable locker and (02) deck flammable locker.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 June 2026
Resolved 26 May 2026
Resolution: provided
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 19 May 2026 Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. Main engine, generator, and hydraulic steering gear system alarms were not operable. **26MAY26** updated action to 50 as the vessel has to order alarm
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 July 2026
Resolution: Vsl provided tech report, mains and gens alarm tests sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2026 Resolved
Each towing vessel must perform the applicable tests in Table 143.245(b) of this section. Pressure vessel relief valves were unable to be tested by ship’s crew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: tested to 165 psi
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2026 Resolved
Each towing vessel must be operated in compliance with Parts 151, 155, and 156, of 33 CFR, as applicable. Port side small discharge containment missing plug.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2026
Resolved 26 May 2026
Resolution: plug provided
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 May 2026 Resolved
It is the responsibility of the crew to comply with the applicable provisions of this subchapter. Crew was unfamiliar with operation and testing of remote fuel shutoff valve.
Action required: 10 - Deficiency Rectified
Resolved 19 May 2026
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 May 2026 Resolved
A 40-B portable fire extinguisher must be located near the storage room or cabinet. This is in addition to the portable fire extinguishers required by tables 142.230(a) and 142.230(b) of this part. Portable 40-B extinguishers missing near engine room flammable locker and (02) deck flammable locker.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2026
Resolution: provided
08 - Alarms › N/A - No Subsystem › General alarm
Issued 14 May 2025 Resolved
The general alarm was not functional on e-power nor ship's power. Ensure general alarm is operational to include audibly and visually.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2025
Resolution: Tested general alarm.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 May 2025 Resolved
Non of the high water alarms in the laz were operational. Ensure all high water alarms in the laz are operational.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2025
Resolution: Tested high level alarms.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 14 May 2025 Resolved
Ensure the first aid chest is up-to-date.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2025
Resolved 22 May 2025
Resolution: All sat.
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 14 May 2025 Resolved
Ensure the vessel is equipped with a pilothouse alerter system prior to the completion of next scheduled drydock.
Action required: 705 - Other - as specified
Resolved 18 July 2025
Resolution: Updated company policy to reflect two person bridge watch.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 14 May 2025 Resolved
The design of the system and its installation on the towing vessel is certified and inspected by a registered professional engineer with experience in fire-detection system design, by a technician with qualifications as a National Institute for Certification in Engineering Technologies (NICET) level IV fire alarm engineering technician, or by an authorized classification society with equivalent experience, to comply with paragraphs (a)(1) through (6) of this section. The vsl installed a new fire detection panel. Provide proof that the system was installed by an approved person.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2025
Resolved 22 May 2025
Resolution: Reviewed documentation.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 17 January 2025 Resolved
Aft port fuel tank - pin hole in aft bulkhead at bottom long, crop and renew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2025
Resolution: Repairs completed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 21 August 2024 Resolved
After any survey of the vessel made under §§ 42.09-25 to 42.09-40, inclusive, as applicable, has been completed and deficiencies corrected as provided in § 42.09-45, no change shall be made in the vessel's structure, equipment, arrangement, material, or scantlings as covered by such survey, without the prior specific approval of the assigning and issuing authority. A crack was discovered on the port side tank bulkhead at the bottom weld seam of the #5 Port Wing Tank and the hull plating located below the waterline. Weld repairs were made by non-certified ABS welders and no notification was made to the assigning and issuing authority (ABS). Notify ABS of the unauthorized weld repairs and provide permanent repair proposal to satisfaction of attending Marine Inspector. 05SEP2024: Received repair proposal to conduct permanent repairs in Seward, AK. Vessel rep to schedule CG attendance to verify final repairs.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2024
Resolved 20 February 2025
Resolution: repairs satisfactory
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 May 2024 Resolved
Ensure E-light next to ER ladder is operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 June 2024
Resolved 15 May 2024
Resolution: repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 May 2024 Resolved
Winter plug is missing from bilge pumps. Install plugs.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 May 2024
Resolved 15 May 2024
Resolution: repaired and tested sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 May 2024 Resolved
Ensure laz high water alarm is operational.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 May 2024
Resolution: repaired and tested sat
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 25 April 2023 Resolved
Perform tests as required by table 143.245(b). Tests must be logged IAW Part 140.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2023
Resolved 4 May 2023
Resolution: completed
14 - Pollution Prevention › N/A - No Subsystem › VGP: Records/Logs
Issued 7 June 2022 Resolved
Ensure the vessel has a valid VGP. PL 11-01
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2022
Resolved 25 August 2022
Resolution: VGP onboard
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 June 2022 Resolved
Remove or place in junction box dead end wire in the lower port stateroom.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2022
Resolved 25 August 2022
Resolution: Placed in junction box
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 7 June 2022 Resolved
Ensure first aid kit is up-to-date.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2022
Resolved 25 August 2022
Resolution: updated
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 June 2022 Resolved
Provide blank for open area in engine room switchboard
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2022
Resolved 25 August 2022
Resolution: blank provided
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 7 June 2022 Resolved
Provide oil transfer procedures.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2022
Resolved 25 August 2022
Resolution: provided
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 7 June 2022 Resolved
Ensure Type II MSD is operated IAW MSD Manual.
Action required: 10 - Deficiency Rectified
Resolved 7 June 2022
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 7 June 2022 Resolved
Ensure all crew that serve in a safety sensitive position is enrooled in a CG approved drug testing program. Vessel had 3 crew enrolled and may operate for 12 hrs or less in any 24 hour period on a voyage of less than 600 NM. Crew must be master and 2 ABs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 June 2022
Resolution: Received email of negative test results and confirmation of sending results to consortium.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 8 June 2021 Resolved
Vessel had not conducted any drills. Conduct abandon ship, MOB, fire, and flooding drills.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2021
Resolution: Drills sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 8 June 2021 Resolved
Lazarette high water alarm was inop. Repair or renew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2021
Resolution: Repaired
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 June 2021 Resolved
Remote fuel shut off valve was not operational. Repair or renew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2021
Resolution: Test sat.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 8 June 2021 Resolved
Six immersion suits did not have lights attached or were not operational. Ensure all immersion suits have approved lights. Vessel has more than needed properly outfitted immersion suits onboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2021
Resolved 10 June 2021
Resolution: Corrected
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 8 June 2021 Resolved
Two E-lights were extinguished on the main deck. Repair or renew.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2021
Resolved 10 June 2021
Resolution: Repaired
08 - Alarms › N/A - No Subsystem › General alarm
Issued 8 June 2021 Resolved
Ensure all general alarms are labeled properly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2021
Resolved 10 June 2021
Resolution: Labeled

Casualty record · 1

26 August 2013Routine · role: Transiting Vicinity of Primary Subject · activity 4736339
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

MILLIE CRUZ (2013). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.