Records from 2012 to 2022. Most recent: inspection, 24 August 2022.
Inspection history · 17
24 August 2022
COI Inspection · Internal Structural Exam · Drydock Exam · Administrative Inspection · Cargo Tank Internal · MTSA Verification
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7542539
9 February 2021
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7138046
28 February 2020
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6919149
21 February 2020
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6913016
9 April 2019
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 6659703
27 February 2019
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 6633540
2 May 2018
Administrative Inspection
Administrative · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6404134
16 January 2018
MTSA Verification · Examination of Repairs · Internal Structural Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6335409
13 June 2017
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6170651
10 May 2017
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6143169
2 May 2017
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6138827
26 April 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6132922
7 March 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6098320
26 January 2016
MTSA Verification · Periodic Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5802680
10 February 2015
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5064626
26 February 2014
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4806515
8 March 2012
MTSA Verification · Administrative Inspection · Initial Certification · Construction Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4259476
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 February 2019
Resolved
Nozzle, flanges, or other fittings for pipe connections shall be welded or brazed to the tank. Remove threaded nozzel and replace with blank flange with spray shield in accordance with 46CFR58.50-10 and referencing Policy letter CG 5213 .
Action required: 705 - Other - as specified
Resolved 9 April 2019
Resolution: Blank Fitting and spray shield were installed as required by the regulations.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 2 May 2018
Resolved
Due to Owner/Operator and Vessel Name change, the VRP on board is not currently correct. Require updated VRP to be placed onboard vessel to the satisfaction of the attending CG Marine Inspector.
Vessel authorized continued full operations, route and service with current valid COI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2018
Resolved 27 February 2019
Resolution: Owner/operator and vessel name have been changed on the updated VRP.
Construction/Loadline › Hull › Side Shell
Issued 2 May 2017
Resolved
Barge was struck in the Stbd side #3 wing void causing a 2' x 8' inset from the rub rail up. The inpact caused two holes with in the inset and a weld seam split on the rub bar.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 May 2017
Resolved 13 June 2017
Resolution: Permanent repairs are satisfactory to the Coast Guard Marine Inspector.
Engineering › Fuel Oil Service System › Valve
Issued 26 January 2016
Resolved
Valves required by 46 CFR 56.50-75 located in the cargo pump engine fuel supply line at the fuel tank and at engine were seized in the open position.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 January 2016
Resolved 26 January 2016
Resolution: Vessel personnel worked and greased valves until operational.