Records from 2017 to 2025. Most recent: inspection, 17 September 2025.
Inspection history · 13
17 September 2025
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8236047
24 August 2025
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8215957
20 January 2024
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7852038
23 September 2022
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7565199
23 September 2022
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7566613
30 May 2022
PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7463141
9 October 2020
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7066714
16 April 2018
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6392813
12 February 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6348572
15 November 2017
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6305454
17 March 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6106578
3 February 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6082468
9 January 2017
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6063856
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 24 August 2025
Resolved
Following installation the master, owner, operatoring agent for person in charge of the vessel subject to this part must properly maintain the BWMS in accordance with all manufacturer specifications. PSCO was informed by vessel master that the vessels BWMS is inoperable and would be repiared prior to departure from US.
33CFR151.2025(a)a()
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 September 2025
Resolution: Provided satisfactory tech report, see documents.
Operations/Management › Pollution › Ballast Water Management
Issued 10 January 2017
Resolved
9800-other clearly not hazardous.Owner, operator, agent or person in charge of a vessel shall Removal fouling organisms from the vessel's hull, piping, and tanks on a regular basis and dispose of any removed substances in accordance with local State and Federal regulations. PSCO noted excessive marine growth on the vessels hull. 33CFR151.2050(f) 40a
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 March 2017
Resolution: PSC NOLA received propper documentation satisfying the requirement.
Fire Fighting › Fixed Fire Detection System › Flame Detectors
Issued 10 January 2017
Resolved
0715- Detection. Maintenance, testing and inspections shall be carried out based on guidelines developed by the Organization, and in a manner having due regard to ensure the reliability of fire fighting systems. Vessel is equipped with flame, heat, and smoke detectors and could not provide evidence that flame detectors can be tested with an open flame. 74SOLAS(14) II-2/14.2.2 50a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2017
Resolved 3 February 2017
Resolution: PSC NOLA received a proper documentation satisfying the requirement.
Construction/Loadline › Markings › Load Line Mark
Issued 10 January 2017
Resolved
1299- Other Loadline. Details of load line markings. The rings, lines and letters shall be painted white or yellow on a dark ground. The marks shall be plainly visible. PSCO observed that the vessel has two permanent load-lines neither of which was painted in a contrasting color to indicate which was active. 66 ICLL I/8 50a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2017
Resolved 3 February 2017
Resolution: PSC NOLA received a proper documentation satisfying the requirement.
Fire Fighting › Combustible Materials › Insulation
Issued 10 January 2017
Resolved
1430- Auxiliary Engines. Surfaces with temperatures above 220 degrees C shall be properly insulated. PSCO noted that heated HFO lines near the steam heaters had failing insulation, additionally the #1 & #2 ships service generator had missing insulation around the turbochargers. 74SOLAS(14) II-2/4.2.2.6.1 16a
Action required: 705 - Other - as specified
Due 24 January 2017
Resolved 13 January 2017
Resolution: Recieved Documented Images from the vessel attesting to repairs of failed insulation.