Records from 2015 to 2025. Most recent: inspection, 9 October 2025.
Inspection history · 11
9 October 2025
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8249968
22 August 2025
Bulk Liquid Transfer Monitor
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8215729
21 October 2020
Internal Structural Exam · MTSA/ISPS Verification · COI Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7081643
29 October 2019
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6846455
24 October 2018
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6568978
6 December 2017
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6322499
24 May 2017
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 6161442
11 December 2016
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6055874
31 October 2016
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6033333
7 January 2016
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 5795502
11 December 2015
Administrative Inspection
Administrative · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 5779763
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 October 2018
Resolved
Generator showed signs of diesel fuel leakage. Correct prior to opearation.
Action required: 10 - Deficiency Rectified
Resolved 26 October 2018
Resolution: Leak on injector corrected.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 24 October 2018
Resolved
Each high-level indicating device couldn't visually indicate the liquid level due to discoloration.
Action required: 10 - Deficiency Rectified
Resolved 26 October 2018
Resolution: Vessel's high-level indicating devices were replaced.
Construction/Loadline › Hull › Double Hull
Issued 16 December 2015
Resolved
All damage is located in the #2 wing void. Buck frame damaged 3' of 8" channel and 5' of 6" channel.deep floor damaged 32"x5/16"x82" floor is upset 6' between frame 32 and 33. 9'x1/2"x12' (4) of floor angles damaged and (2) hull side angles. Knuckle is upset 6" between frame 32 and 33. aft watertight bulkead, replace P-1 plate.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 February 2016
Resolved 16 March 2016
Resolution: repairs completed in Paducah and inspected sat