13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 September 2024
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must:
(1) Be maintained to ensure proper operation;
(2) Be suitable for route and service; and
(3) Have suitable propulsion controls to provide the operator full control at each operating station.
The crew reported that the vessel lost propulsion due to mechanical failure in the port main engine while underway, approximately 12 miles SW of Tinian. The starboard engine was reported to be operational. Make necessary repairs so that the port main engine is suitable for route and service. Contact USCG MSU Saipan for an examination of repairs.
46 CFR 143.205 (c)
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 September 2024
Resolved 6 November 2024
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 11 July 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. While underway and shifting berths, vessel experienced a loss of pressure from the main air compressor and pneumatic delivery system for pneumatic steering, resulting in a loss of steering. After appropriate repairs are made, conduct sea trials to the satisfaction of attending Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Due 11 July 2024
Resolved 15 July 2024
Resolution: Attended, sea trials conducted, all sat.
10 - Safety of Navigation › N/A - No Subsystem › Echo sounder
Issued 14 June 2024
Resolved
Towing vessels must be equipped with the following equipment, as applicable to the area of operation: (a) Fathometer. Fathometer onboard does not read correct depth either at the dock or underway. Additionally, fathometer is not operational as required under emergency battery power.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 June 2024
Resolved 17 June 2024
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 14 June 2024
Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space. There are no emergency lighting to illuminate the engine room's escape ladder to upper deck and laundry room to facilitate egress out in an event of an emergency.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 June 2024
Resolved 17 June 2024
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 14 June 2024
Resolved
Means must be provided for stopping each fan in a ventilation system serving machinery spaces and for closing, in case of fire, each doorway, ventilator, and annular space around funnels and other openings in such spaces. The engine room port side exhaust dampener does not fully seal when in the closed position.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 June 2024
Resolved 17 June 2024
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 14 June 2024
Resolved
Towing vessels must be equipped with the following equipment, as applicable to the area of operation: Search light, controllable from the vessel's operating station and capable of illuminating objects at a distance of at least two times the length of the tow. Aft search light is not operational, vessel is restricted from towing operations at night.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 17 June 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 June 2024
Resolved
Each owner or managing operator must develop procedures to routinely examine, maintain, and replace capstans, winches, and other machinery used to connect the towing vessel to the tow. The forward tow winch is not operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2024
Resolved 17 March 2025
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 June 2024
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists, or an essential system develops problems that require attention. The high bilge level alarm for steering gear room is activated on the alarm panel on the bridge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 2 July 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 June 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The fire pump is missing the guard to protect personnel from rotating machinery.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 2 July 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 June 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The engine room breaker panels current condition poses a potential risk to the crew.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 2 July 2024
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 14 June 2024
Resolved
The owner or managing operator must implement procedures to identify and mitigate health and safety hazards. The overhead light outboard of the starboard main engine is extinguished.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 2 July 2024
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 14 June 2024
Resolved
Towing vessels must be equipped with the following equipment, as applicable to the area of operation: Illuminated magnetic compass or an illuminated swing-meter (Western Rivers vessels only). The compass or swing-meter must be readable from each operating station. Compass light is extinguished and not visible during reduced visibility or during operations at night.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 17 June 2024
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 14 June 2024
Resolved
The master must ensure that all hatches, door, and other openings designed to be watertight or weathertight function properly. The pilot house starboard side quick acting watertight door’s upper dog is missing hardware and not properly tighten.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 6 November 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 June 2024
Resolved
Electrical conductors passing through watertight bulkheads must be installed so that the bulkhead remains watertight. Two port side deck lightings on the 01 deck have wires passing through bulkheads that are not watertight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 9 July 2024
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 June 2024
Resolved
Fixed fire-extinguishing system must be inspected and tested, as required by table 142.240 of this section. The paint locker fixed fire-extinguishing bottle’s bracket is severely wasted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 31 July 2024
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 14 June 2024
Resolved
A towing vessel must carry adequate and up-to-date charts, maps, and nautical publications for the intended voyage, including: “U.S. Coast Pilot” or similar publication. The coast pilot onboard is not current.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2024
Resolved 2 July 2024
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 29 June 2023
Resolved
Stbd side pilothouse water tight door not fully closing
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 11 July 2023
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 29 June 2023
Resolved
Port E/R exhaust dampener not securing completely
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 20 July 2023
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 29 June 2023
Resolved
Port and Starboard upper stack closures not securing properly
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 18 August 2023
Resolution: The crew welded a threaded stud and used a wingnut to tighten the dampner. The installation was found to be satisfactory.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 29 June 2023
Resolved
Aft searchlight is inoperative
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 11 July 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 29 June 2023
Resolved
Port main engine lube oil temp gauge is cracked
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 11 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 June 2023
Resolved
Port main engine fuel oil duplex secondary filters are leaking
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 18 September 2023
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 29 June 2023
Resolved
Port and starboard potable watr tank cover missing washers and not properly secured
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 20 July 2023
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 29 June 2023
Resolved
Forward emergency escape hatch is leaking from the wheel handle packing
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 11 July 2023
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 29 June 2023
Resolved
Starboard shaft water overboard piping needs to be properly secured
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 11 July 2023
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 29 June 2023
Resolved
Relocate lube oil fill hose and nozzle from main switch board
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2023
Resolved 11 July 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 June 2022
Resolved
AFT Generator is out of service due to damaged cylinder head gasket.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 21 June 2022
Resolution: AFT generator has been satisfactory repaired and load tested.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 8 June 2022
Resolved
Crew were not able to demonstrate how to test cooling water temperature alarm for forward generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 8 June 2022
Resolved
Crew were not able to demonstrate how to test low lubricating oil pressure alarm for forward generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 8 June 2022
Resolved
Crew were not able to demonstrate how to test cooling water temperature alarm for port & STBD main propulsion engines.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 8 June 2022
Resolved
Installed communication system between pilothouse, engine room and galley are inoperable. Communication with portable radio between engine room and pilothouse was not satisfactory, unclear and distorted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
Resolution: VSL have portable radios.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 8 June 2022
Resolved
Heat-detection system in the galley is inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 June 2022
Resolved
Several fuel remote shut-off valves on exterior of main deck are unmarked.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 June 2022
Resolved
Oil leaking from fitting flange inboard of STBD engine that is connected to exhaust pipe.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 June 2022
Resolved
With AFT generator out of service, the panel for navigation light has only one source of electricity (generator). Panel is not connected to 12V nor the 24V systems.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 June 2022
Resolved
Found flammable materials ( paints, primers) stored in engine room and through out the vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 June 2022
Resolved
Oil accumulation in engine room bilge area below generators.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 June 2022
Resolved
Diesel fuel leak on port engine's secondary fuel filters.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 June 2022
Resolved
VSL's engineer was not sure of how the essential loads are energized by two independent sources of electricity. VSL electrical system has been heavily modified with no electrical schematic drawing on board to verify .
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2022
Resolved 21 June 2022
01 - Certificates & Documentation › 012 - Crew Certificates › Manning specified by the minimum safe manning doc
Issued 8 June 2022
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 702 - Prior to embarking on international voyage
Due 8 July 2022
Resolved 21 June 2022
Resolution: Vessel rep provided an appropriate chief engineer and Master.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 8 June 2022
Resolved
A towing vessel must carry adequate and up-to-date charts, maps, and nautical publications for the intended voyage, including: Charts, including electronic charts acceptable to the Coast Guard, of appropriate scale to
make safe navigation possible.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2022
Resolved 21 June 2022
Resolution: Vessel rep provided updated paper charts
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 June 2022
Resolved
Any vessel over 300 gross tons using the navigable waters of the United States must have a valid COFR on board, the COFR on board was expired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2022
Resolved 21 June 2022
Resolution: Vessel rep provided an updated COFR.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 June 2022
Resolved
Each Towing vessel must be operated in compliance with the Maritime Transportation Security Act of 2002 and 33CFR 101-104. Vessel did not have an onboard master that was ready for the security assessment.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2022
Resolved 21 June 2022
Resolution: Vessel rep provided a certified VSO for the vessel during its follow-up inspection.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 8 June 2022
Resolved
Vessel LLC has the incorrect call sign. LL symbol needs to be repainted on the side of the ship hull.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2022
Resolved 21 June 2022
Resolution: Vessel rep notified ABS to update the call sign.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 8 June 2022
Resolved
Each Vessel going on an international voyage must have no less than 12 rocket parachute flares approved under 46CFR160.136 and stow the flares on or near the vessel's navigation bridge.
Action required: 702 - Prior to embarking on international voyage
Resolved 6 July 2023
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 8 June 2022
Resolved
Vessel is restricted from operating above 32 degrees north and below 32 degrees south latitude unless the appropriate amount of immersion suits are provided for the total persons on board plus an additional suit at each watch station, work station, and industrial work site.
Action required: 705 - Other - as specified
Resolved 6 July 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 June 2022
Resolved
Each lifebuoy on a towing vessel must be marked in block capital letters with the name of the vessel. The aft operating station buoy was not marked with the name of the vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2022
Resolved 21 June 2022
Resolution: Vessel rep stenciled the appropriate name onto the lifering.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 8 June 2022
Resolved
Each towing vessel operating in oceans and coastwise service must have a line throwing appliance approved under approval series 160.040. Vessel only had one out of 4 rockets and lines on board.
Action required: 705 - Other - as specified
Resolved 6 July 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 8 June 2022
Resolved
All portable fire extinguishers and semi-portable extinguish systems must be inspected or tested at least once every 12 months. Vessel portable and semi portable extinguishers did not have proper servicing documentation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2022
Resolved 16 August 2022
Resolution: Vessel provided evidence for the annual servicing of their portable extinguishers.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 June 2022
Resolved
All flammable/combustible products kept on board must be kept to minimize fire hazard. Vessel stored flammable product outside of the paint locker.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2022
Resolved 21 June 2022
Resolution: Vessel rep removed the flammable/combustible product and stored it in a properly approved location.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 June 2022
Resolved
Vessel did not have screen on the galley stove vent. Vessel shall minimize fire hazard on board. The Galley vent was catching grease well within the vent fan.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2022
Resolved 21 June 2022
Resolution: Vessel rep installed a grease trapper.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 June 2022
Resolved
Each towing vessel must be equipped with an industrial first aid cabinet or kit, appropriate to the size of the crew and operating conditions. There were expired medical equipment on board.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2022
Resolved 21 June 2022
Resolution: Vessel rep rempoved/replaced expired medications on board.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 8 June 2022
Resolved
The master must ensure that all hatches, doors, and other openings designed too be watertight or weather-tight function properly. The vessel had multiple WTD pins missing the cotter pin.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2022
Resolved 21 June 2022
Resolution: Vessel rep provided cotter pins for the WTD Pins.
14 - Pollution Prevention › 142 - MARPOL Annex II › Other (MARPOL Annex II)
Issued 8 June 2022
Resolved
Vessels carrying oil as secondary cargo must carry appropriate equipment and supplies for the containment and removal of on-deck oil cargo spills of at least one-half barrel. Vessel oil spill response kit had missing equipment.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2022
Resolved 21 June 2022
Resolution: Vessel rep provided a full pollution response kit for the vessel.
01 - Certificates & Documentation › 011 - Ships Certificates › Minimum Safe Manning Document
Issued 17 February 2022
Resolved
EACH TOWING VESSEL CERTIFICATED UNDER THE PROVISIONS OF THIS SUBCHAPTER MUST BE IN FULL COMPLIANCE WITH THE TERMS OF THE COI. THE ITV ENDEAVOR IS NOT PROPERLY MANNED AS PER THE VESSEL'S COI FOR THE REQUIRED DECK OFFICERS (MASTER/MATES) HAVING THE PROPER LICENSE/ENDORSEMENT AS PER 46CFR15.910.
Action required: 60 - Rectify deficiencies prior to movement
Due 18 February 2022
Resolved 18 February 2022
Resolution: Cabras Marine Corp. added a mariner with a Master of Towing to meet the manning requirements on the COI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 September 2021
Resolved
The owner, master, or operator of each vessel towing astern shall ensure that the strength of each towline is adequate for its intended service. Tow wire parted while the vessel was conducting towing operation. Vessel is to affect permanent repairs or provide a tow wire for the intended towing operations to the satisfaction of the attending CG MI prior to conducting astern towing operations.
Action required: 705 - Other - as specified
Due 9 October 2021
Resolved 27 September 2021
Resolution: Vessel conducted permanent repairs to the tow wire.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 May 2021
Resolved
There must be an installed or portable bilge pump for emergency dewatering. Any portable pump must have sufficient hose length and pumping capability. All installed bilge piping must have a check/foot valve in each bilge suction that prevents unintended backflooding through bilge piping. There is a leak in the bilge piping manifold, make repairs to the piping system prior to movement.
Action required: 10 - Deficiency Rectified
Resolved 24 May 2021
Resolution: Valve replaced and system tested.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 24 May 2021
Resolved
Each towing vessel must be equipped with an industrial type first aid cabinet or kit, appropriate to the size of the crew and operating conditions. Replace the expired contents of the first aid kit.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 June 2021
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 24 May 2021
Resolved
Each towing vessel must be equipped with an industrial type first aid cabinet or kit, appropriate to the size of the crew and operating conditions. Replaced the expired eye bottles in the ships main interior passageway.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 June 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 May 2021
Resolved
Towing machinery used to connect the towing vessel to the tow must be suitable for its intended service. It must be capable of withstanding exposure to the marine environment, likely mechanical damage, static and dynamic loads expected during intended service, the towing vessel's horsepower, and arrangement of the tow. The vessels starboard aft tow winch was not operational at the time of the inspection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2021
Resolved 4 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 May 2021
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. Although the starboard aft fuel oil storage tank does not supply fuel directly to a propulsion engine or generator prime mover, the remote mechanism has been removed and needs to be replaced as designed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2021
Resolved 14 September 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 24 May 2021
Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weather-tight function properly. Make repairs/adjustments to the port and starboard watertight doors in the pilot house. Both doors require the use of extension bar to open and close normally and ensure that they are weather-tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2021
Resolved 28 July 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 May 2021
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. Although the 3 center fuel oil storage tank does not supply fuel directly to a propulsion engine or generator prime mover, the remote mechanism has been removed and needs to be replaced as designed.
Action required: 10 - Deficiency Rectified
Resolved 24 May 2021
Resolution: Deficiency rectified.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 24 May 2021
Resolved
At least two lifebuoys on a towing vessel greater than 26 feet must be fitted with a floating electric water light approved under approval series 161.010 or 161.110, unless the towing vessel is limited to daytime operation, in which case no floating electric water light is required. The batteries in both floating electric water lights were expired.
Action required: 10 - Deficiency Rectified
Resolved 24 May 2021
Resolution: Batteries replaced.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 19 May 2020
Resolved
Service all portable extinguishers onboard IAW 46 CFR 142.240(a).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 May 2020
Resolution: Extinguishers serviced.
11 - Life Saving Appliances › N/A - No Subsystem › Means of rescue
Issued 19 May 2020
Resolved
Install a man over board recovery device IAW 46 CFR 141.230.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 May 2020
Resolution: Rescue net installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2020
Resolved
Make repairs to the excessive water ingress through the rudder post packing IAW 46 CFR 143.205(a).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 May 2020
Resolution: Rudder post packing tightened.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 May 2020
Resolved
Replace gasket for the port side pilot house water tight door IAW 46 CFR 144.320(b).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 May 2020
Resolution: Water tight door gasket replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 May 2020
Resolved
Diagnose and make repairs the the starter / gearing issues on both main propulsion engines IAW 46 CFR 143.205(a).
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 May 2020
Resolution: Repairs made to the flywheel gearing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 May 2020
Resolved
Make permanent repairs to the temporary soft patch on the bilge / ballast piping system IAW 46 CFR 143.245(a).
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 June 2020
Resolution: Repairs made.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 16 March 2020
Resolved
Each water tight door must be marked on both sides in 1 inch letters "WATERTIGHT DOOR-KEEP CLOSED".
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 20 March 2020
Resolution: All watertight doors marked.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 March 2020
Resolved
Provide certification for pressure vessel gauges.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 20 March 2020
Resolution: Calibrated gauges provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 March 2020
Resolved
Complete testing of pressure vessel relief valves.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 20 March 2020
Resolution: Tested PV and relief valves.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2020
Resolved
Secure air leak at shaft brake valve stem.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 20 March 2020
Resolution: Air leak stopped.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 March 2020
Resolved
Hard wire emergency lighting in engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 20 March 2020
Resolution: Emergency light hard wired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 March 2020
Resolved
Repack port side shaft packing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 20 March 2020
Resolution: Port packing repacked.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 March 2020
Resolved
Provide check valves at all bilge foots. Starboard engineroom bilge piping missing check valve.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 20 March 2020
Resolution: Check valves installed up line.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 16 March 2020
Resolved
Provide guard for spinning machinery on dirty oil pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 20 March 2020
Resolution: Guard provided.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 16 March 2020
Resolved
Make engine room emergency escape ladder stable and make lower rungs avalible.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2020
Resolved 20 March 2020
Resolution: New ladder provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 March 2020
Resolved
Test main engine and aux generator low lube oil and high temperature alarms.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 March 2020
Resolution: All alarms tested.