Inspection history · 40
6 February 2026
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8307340
24 June 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8210929
14 March 2025
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8094107
2 March 2025
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8086827
3 February 2025
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8072011
17 October 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8020833
6 September 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8006087
4 January 2024
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7845656
27 July 2023
Drydock Exam · Construction Oversight
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7844979
3 November 2022
Periodic Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7588436
29 October 2021
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7403539
4 October 2021
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7327307
26 August 2021
Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7297149
9 June 2021
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7220976
28 January 2021
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7132616
26 January 2021
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7131359
2 January 2021
Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7118532
2 January 2021
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7120059
26 October 2020
Administrative Inspection · Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7084719
23 October 2020
Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7084666
23 October 2020
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7092574
28 September 2020
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7066556
20 August 2020
Drydock Exam · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7044161
3 August 2020
Plan Review (Other than "T")
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7036871
25 July 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7015825
12 July 2020
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7092678
4 December 2019
In-Service Inspection · Deficiency Check · COI Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6866793
6 November 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6851633
15 August 2019
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6784929
9 August 2019
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6778282
22 May 2019
Administrative Inspection · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6690827
22 May 2019
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6698847
2 May 2019
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6675636
5 April 2019
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6656646
4 April 2019
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6660093
2 April 2019
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6655391
7 December 2018
In-Service Inspection · COI Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6591538
28 August 2018
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6587155
27 March 2017
Plan Review (Other than "T") · Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6112225
20 January 2017
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6587163
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 16 July 2025
Resolved
Vessels in ocean, coastwise, or Great Lakes service, except unmanned barges, shall be fitted with anchors, chains, and hawsers in general agreement with the Standards established by the American Bureau of Shipping . (c)Tugs, under 200 feet (61 meters)in length, shall have at least one anchor of one-half the tabular weight listed int eh applicable standards. Vessel's bow winch that controls the anchor was damaged during dry dock. Replace bow winch prior to operating in commercial service.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 July 2025
Resolved 19 September 2025
Resolution: Attended vessel and witness proper operation the bow winch and installation of the anchors.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 4 January 2024
Resolved
Test procedure documents must be in a step-by-step or checkoff list format. Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm set points, the procedure to be followed, and the expected test result. The port ME oil mist detection light failed to illuminate as described in the test procedure. Repair faulty light and prove proper operation to the satisfaction of the attending MI.
46 CFR 61.40-10(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2024
Resolved 12 March 2024
Resolution: Corrected.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 4 January 2024
Resolved
Test procedure documents must be in a step-by-step or checkoff list format. Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm set points, the procedure to be followed, and the expected test result. Port and stbd fuel leak detection alarm procedure was triggered by an artificial signal, which is not the approved PSTP procedure. Tested as described in the approved procedure, but the fuel return line from the leak detection canister is missing an isolation valve to successfully complete the test. Install the proper isolation valve to the satisfaction of the attending MI.
46 CFR 61.40-10(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2024
Resolved 3 February 2025
Resolution: PSTP Change 9 was submitted. Corrected.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 4 January 2024
Resolved
Test procedure documents must be in a step-by-step or checkoff list format. Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm set points, the procedure to be followed, and the expected test result. Port and stbd high lube oil differential pressure alarm test procedure was triggered by an artificial signal, which is not the approved PSTP procedure. Hatton technician could not test as described in the approved procedure due to not having the required test fitting adapter. Provide the correct test fitting adapter to the satisfaction of the attending MI.
46 CFR 61.40-10(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2024
Resolved 3 February 2025
Resolution: PSTP Change 9 was submitted. Corrected.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 January 2024
Resolved
Each clean agent fire extinguishing alarm must be conspicuously marked: “WHEN ALARM SOUNDS VACATE AT ONCE. CLEAN AGENT BEING RELEASED.” Placard is mounted on exterior of QAWTD leading into the machinery space. Identify alarm in engine room overhead by marking as described above at the location of the alarm to the satisfaction of the attending MI.
46 CFR 97.37-9
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2024
Resolved 12 March 2024
Resolution: Corrected.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 4 January 2024
Resolved
Instrumentation details. Demand instrumentation displays must be clearly readable and immediately available to the operator. Alarms. (1) All alarms must clearly distinguish among - Normal, alarm, and acknowledged alarm conditions; and fire, general alarm, carbon dioxide/Halon 1301/clean agent fire extinguishing system, vital machinery, flooding, engineers' assistance-needed, and non-vital alarms. The machinery audible alarm is also the general audible alarm. As described above, make the audible side of the general alarm a separate audible alarm so it is clearly distinguishable from the machinery and other normal alarms to the satisfaction of the attending MI.
46 CFR 62.25-20(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 March 2024
Resolved 12 March 2024
Resolution: Cleared, deficiency was verified and opened in error.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 3 August 2023
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual and periodic inspections within the periods specified in § 91.27–1 (a) and (b) and your Certificate of Inspection must be endorsed. Vessel missed annual inspection. Need to submit an Application of Inspection and conduct COI prior to conducting commercial operations.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 4 January 2024
Resolved 12 March 2024
Resolution: COI completed.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 4 October 2021
Resolved
Indication of the rudder angle must be provided both at the main steering station in the pilothouse and in the steering-gear compartment. Steering unit #1 and #2 rudder angle indicator off by five degrees to port. Calibrate or replace and prove proper operation tot he satisfaction of the attending MI.
46 CFR 58.25-25
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2021
Resolved 10 January 2022
Resolution: Repairs made. Steering test including emergency steering rudder angle indicators completed; all sat.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 4 October 2021
Resolved
Automatic bilge pumps must -
(1) Be provided with bilge high level alarms that annunciate in the machinery spaces and at a manned control location and are independent of the pump controls. The steering room bilge pump failed to alarm when tested.
46 CFR 62.35-10(a)(1)
Action required: 10 - Deficiency Rectified
Due 4 October 2021
Resolved 4 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › UMS - Ship
Issued 4 October 2021
Resolved
Test procedure documents must be in a step-by-step or checkoff list format. Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm setpoints, the procedure to be followed, and the expected test result. Test procedure used for generator over speed is not the approved PSTP as described in Appendix 1-7 - Over speed Test Procedures, Step A7.4.2. Additionally, the diesel generator test result sheet requires changing the over speed shutdown from @ ECM (75%) 1553 RPM to @ ECM (100%) 1800 RPM. Submit updated PSTP to MSC for approval and provide documention to the attending MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2021
Resolved 3 February 2025
Resolution: PSTP Change 9 was submitted. Corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2021
Resolved
Each receptacle outlet must be suitable for the environment in which it is installed and constructed to the appropriate NEMA or IEC protection standard. A “surge protector” was installed in the engine room powered by a flexible cord. Remove temporary cord and surge protector.
46 CFR 111.60-13; 46 CFR 111.79-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2021
Resolved 28 October 2021
Resolution: Temporary cord and surge protector removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2021
Resolved
Temporary or flexible cord may not be used for permanent installations. Two flexible cords were being utilized in permanent service in the engine room. Remove temporary flexible cords.
46 CFR 111.60-13(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2021
Resolved 28 October 2021
Resolution: Temporary flexible cords removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2021
Resolved
Each electrical cable installations must meet Sections 25 of IEEE 45-2002. Electrical cable for old main engine monitoring system was left installed and the wires were dead-ended and bare. Properly terminate or remove these wires.
46 CFR 111.60-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2021
Resolved 28 October 2021
Resolution: Dead end wires removed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 October 2021
Resolved
The time delay device must be pneumatically operated and have an accuracy of -0/+20 percent of the rated time delay period. Vessel's clean agent fire suppression system time delay is rated for 34 seconds but actuated the system at 43 seconds, exceeding the +20% maximum allowable tolerance range. Replace time delay to the satisfaction of the attending marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2021
Resolved 28 October 2021
Resolution: New time delay installed. Tested at 43 seconds again; approved all sat.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 4 October 2021
Resolved
Fire detection systems are not required except in special cases; but if installed, the system must meet the applicable requirements of 46 CFR, part 76 of Subchapter H. Smoke detector in the crew mess was not operational.
46 CFR 95.05-1(a)
Action required: 10 - Deficiency Rectified
Due 4 October 2021
Resolved 4 October 2021
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 4 October 2021
Resolved
Each liferaft or group of liferafts must be arranged for float free launching. Vessel's stbd liferaft painter was attached to something other than the weak link which would have prevented the liferaft from floating free if the vessel sank.
46 CFR 199.130(c)(7)
Action required: 10 - Deficiency Rectified
Due 4 October 2021
Resolved 4 October 2021
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 4 October 2021
Resolved
Batteries must be constructed to take into account the environmental conditions of marine installation, including temperature, vibration, and shock. Non-permanent type connectors found on batteries atop pilot house.
46 CFR 111.15-2
Action required: 10 - Deficiency Rectified
Due 4 October 2021
Resolved 4 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 January 2021
Resolved
An inspection either general or partial depending upon the circumstances shall be made whenever any important repairs are undertaken. Vessel's Port Main engine suffered a casualty due to a Lube oil pressure alarm. Upon arrival into the Port of Honolulu, permanent repairs of the Port Main engine shall be verified satisfactory and operational tests witnessed by a CG Marine inspector prior to conducting towing operations.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 January 2021
Resolved 28 January 2021
Resolution: Leaking fuel injector pump replaced. Witnessed operational test of the port main diesel engine; all sat.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 January 2021
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 January 2021
Resolved 9 June 2021
Resolution: Found open in error. Damage survey completed in activity 7118532
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 26 October 2020
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter.
The port forward bow of the tug vessel KAPENA JACK YOUNG impacted the starboard aft corner of the AMS 250. Damage survey shows approximately a 4ft. by 4 ft. section in the forepeak that is 6 ft. above that water line that needs to be permanently repaired at drydock. Temporary repairs consisting of repaired a cracked weld and pressure testing the entire forepeak has been completed and the vessel is authorized to do a one time transit to Nawiliwili from 10/26/2020-10/27/2020. Upon return to the island of Oahu on 10/28/2020 the completion of all temporary repairs as defined by approved repair proposal KAPENA JACK YOUNG REPAIR PLAN Rev. 1 dated 10/26/2020 must be achieved prior to departure. Once approved temporary repairs are completed the KAPENA JACK YOUNG must complete permanent repairs within 120 days (Feb. 26, 2021).
Action required: 705 - Other - as specified
Due 26 February 2021
Resolved 9 June 2021
Resolution: Satisfactory reparis completed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 September 2020
Resolved
Tests must be conducted at periodic intervals specified by the Coast Guard to confirm that vital systems and safety features continue to operate in a safe, reliable manner. Note: Normally these tests are conducted annually. Vessels CG approved PSTPs state that testing will be completed annually and the test procedures were approved in March 2019. Testing has not been completed fully since PSTPs were approved 18 months ago. Complete PSTPs and provide supporting documentation.
46 CFR 61.40-6 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 26 October 2020
Resolution: Vessel completed PSTPs
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 28 September 2020
Resolved
Each generator arranged for parallel operation must have reverse power or reverse current trips. Vessel could not demonstrate reverse power trip for #3 generator. Schedule marine inspector attendance to witness testing.
46 CFR 111.12-11 (f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 26 October 2020
Resolution: Vessel demonstrated reverse power relay sat.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 25 July 2020
Resolved
The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of this chapter. Systems of this type include the following: steering systems.
The vessel's rudder post is excessively leaking water. Provide repair proposal and movement plan prior to either action.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 August 2020
Resolution: Vessel completed repairs to port and stbd rudder posts to the satisfaction of the attending Marine Inspector and ABS along with a successful sea trial with steering test.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 4 December 2019
Resolved
At each inspection for certification, periodic inspection and at other times necessary, the inspector will determine that all fire-extinguishing equipment is in suitable condition and may require any tests necessary to determine the condition of the equipment. The inspector will determine if the tests and inspections required by § 97.15-60 of this subchapter have been conducted. At each inspection for certification and periodic inspection, the inspector will check fire-extinguishing equipment with the following tests and inspections. Demonstrate the time delay, activation of pressure switches, clearing of the fixed piping and sirens are operational in presence of USCG marine inspector.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 30 December 2019
Resolution: Satifactorily witnessed testing of fixed system's time delay, pressure switches, siren and clearing of discharge line.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 4 December 2019
Resolved
Vertical ladders and deck scuttles shall not in general be considered satisfactory as one of the required means of escape. However, where it is demonstrated that the installation of a stairway would be impracticable, a vertical ladder may be used as the second means of escape. Escape hatch does not readily open. Opening handle does not rotate freely and scuttle is restricted from opening.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 30 December 2019
Resolution: Opening handle rotates freely and hatch opens without restriction.
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 4 December 2019
Resolved
Instructions in at least 1/2 inch letters and figures shall be posted in the steering engine room, relating in order, the different steps to be taken in changing to the emergency steering gear. Each clutch, gear, wheel, lever, valve, or switch which is used during the changeover shall be numbered or lettered on a metal plate or painted so that the markings can be recognized at a reasonable distance. The instructions shall indicate each clutch or pin to be “in” or “out” and each valve or switch which is to be “opened” or “closed” in shifting to any means of steering for which the vessel is equipped. Instructions shall be included to line up all steering wheels and rudder amidship before changing gears. Current emergency steering instruction is incorrect and crew had difficulty demonstrating switch over from normal to emergency steering.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 3 January 2020
Resolution: New Emergency Steering switch over instruction developed and mounted.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 4 December 2019
Resolved
Fire pumps must be fitted on the discharge side with relief valves set to relieve at 25 p.s.i. in excess of the pressure necessary to maintain the requirements of paragraph (c) of this section or 125 p.s.i., whichever is greater. Relief valves may be omitted if the pumps, operating under shut-off conditions, are not capable of developing a pressure exceeding this amount. Relief valve is missing. Provide relief valve or demonstrate that the fire pumps are not capable of developing a pressure exceeding this amount.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 30 December 2019
Resolution: Fire pumps are not capable of producing pressure exceeding the amount. Maximum pressure produced at 98 psi.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2019
Resolved
Valves installed on the outside of the oil tanks must be made of steel, ductile cast iron ASTM A 395 (incorporated by reference; see 46 CFR 56.01-2), or a ductile nonferrous alloy having a melting point above 1,700 °F and must be arranged with a means of manual control locally at the valve and remotely from a readily accessible and safe location outside of the compartment in which the valves are located. The spindle to fuel shut off valve is bent not allowing the pneumatic fuel shut off valve to work satisfactorily.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 30 December 2019
Resolution: Item cleared after satisfactory demonstration of remote fuel shutoff.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 4 December 2019
Resolved
Detectors must be capable of being triggered or tested and restored to service without the replacement of any component. Heat detectors must be rated not lower than 130 °F (54 °C) and not higher than 172 °F (78 °C). The operating temperature of heat detectors located in spaces of high normal ambient temperatures may be up to 260 °F (130 °C).
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 30 December 2019
Resolution: Witnessed satisfactory testing of heat detectors. Heat detectors are set at 172.5 F in engineroom.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 November 2019
Resolved
Repair leak on the port side raw water cooling piping.
Action required: 705 - Other - as specified
Due 8 November 2019
Resolved 7 November 2019
Resolution: Witnessed satisfactory repairs to port main diesel engine's s/w circ pump discharge spool piece.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 August 2019
Resolved
A vessel equipped with fixed pitch or controllable pitch propellers must have on the navigating bridge and at the engineroom control station a propeller speed and direction indicator or a propeller speed and pitch indicator for each shaft. Vessel was not constructed with shaft speed and thrust indicators IAW 46 CFR 113.37.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 16 December 2019
Resolution: Vessel satisfactorily demonstrated installed shaft tachometer underway in forward and reverse mode.