Records from 2024 to 2026. Most recent: inspection, 31 July 2026.
Documentation record
Registered dimensions (L × B × D)55.0 ft × 15.0 ft × 5.0 ft
Registered tonnagegross 27 / net 22
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJ & B MANUFACTURING LLC · CHAUVIN · built 2025
Hull materialAluminum
PropulsionDiesel
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 12 June 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it27 - Simplified, Gross Ton
22 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 18 July 2025
Resolved
An exposed hazard, such as rotating machinery, must be properly protected by a cover, guard, or rail. Both main diesel engines did not have a cover for the exposes crankshaft pulleys, the jet drive shafts (port & stbd) in machinery and lazarette space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2025
Resolved 21 July 2025
Resolution: Provided proof of guard installations.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 18 July 2025
Resolved
hen operating a vessel on a body of water where the discharge of untreated sewage is prohibited by the EPA under 40 CFR 140.3, the operator must secure each Type III device in a manner which prevents discharge of sewage. Acceptable methods of securing include—(1) Closing each valve leading to an overboard discharge and removing the handle;(2) Padlocking each valve leading to an overboard discharge in the closed position; or(3) Using a non-releasable wire-tie to hold each valve leading to an overboard discharge in the closed position. Over board valve was not secured.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2025
Resolved 18 July 2025
Resolution: Locked & removed handle.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 18 July 2025
Resolved
Rails or equivalent protection must be installed near the periphery of all decks of a vessel accessible to passengers or crew. Vessel did not have rails or equivalent protection across the bow.
Action required: 10 - Deficiency Rectified
Resolved 18 July 2025
Resolution: Chains were installed matching rail courses.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 July 2025
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each location for life jackets. Life Jacket stowage location under chairs were not marked.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2025
Resolved 21 July 2025
Resolution: Provided proof of life jacket sign installation.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 July 2025
Resolved
Each floating waterlight installed after March 11, 1997 on a vessel carrying only one ring buoy must be attached to the lanyard with a corrosion-resistant clip and allow the waterlight to be quickly disconnected from the ring life buoy. Waterlight was attached to the ring life buoy and did not have a clip to disconnect.
Action required: 10 - Deficiency Rectified
Resolved 18 July 2025
Resolution: Installed clip to disconnect light.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 18 July 2025
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. Vessel did not have two operable portable battery lights.
Action required: 10 - Deficiency Rectified
Resolved 18 July 2025
Resolution: Installed 02 portable battery lights.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 18 July 2025
Resolved
A ship, except a ship of less than 26 feet in length, must have a an "Oil Pollution Placard" of at least 5 by 8 inches, made of durable material fixed in a conspicuous place in each machinery space, or at the bilge and ballast pump control station. Vessel did not have placard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2025
Resolved 18 July 2025
Resolution: Placard installed.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 18 July 2025
Resolved
The master or person in charge of a ship shall ensure that the ship is not operated unless a garbage management plan is on the ship and that each person handling garbage follows the plan. Each garbage management plan must be in writing, describe procedures for minimizing, collecting, processing, storing, and discharging garbage; and designate the person who is in charge of carrying out the plan. Vessel did not have a garbage management plan.
Action required: 10 - Deficiency Rectified
Resolved 18 July 2025
Resolution: Provided proof of plan.