REGGIE

REGGIE is a 2005 industrial vessel. The Coast Guard has recorded 44 inspections since 2004, most recently in June 2026, along with 71 deficiencies — 3 with no resolution recorded — and 3 casualty investigations between 2016 and 2026.

Records from 2004 to 2026. Most recent: inspection, 12 June 2026.

Built
2005
Last inspected
12 June 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

WDC9351
667862
Flag
UNITED STATES
Maury page id
psix-667862

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspections, by type

…with no type recorded3
Years with a record 21 calendar years (2004–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Registered dimensions (L × B × D)75.5 ft × 50.0 ft × 10.0 ft
Registered tonnagegross 325 / net 325
ITC dimensions (L × B × D)75.5 ft × 50.0 ft × 10.0 ft
ITC tonnageNot recorded
BuilderC & C MARINE & REPAIR LLC · BELLE CHASSE, LA, UNITED STATES · built 2005
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 7 July 2026 · expires 31 August 2027
Service, as the file records itIndustrial Vessel
Hull formunknown (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it325 - Regulatory (Subpart C or D), Gross Ton
325 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

What it gives that this page does not: the whole record in one dated, citable document — every line with its Coast Guard activity id, the retrieval date on the cover, built to print to PDF with its page breaks — that a surveyor can attach and a lender can file. The same facts as this page, complete and in one file.

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

A request, not a checkout: leave an email and Maury replies once, with the dated document for this hull and a Stripe invoice for $299. Nothing is charged before the document is in your hands.

Inspected as a tow unit · 12

Inspection history · 44

12 June 2026 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8403076
25 March 2026 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8338679
23 February 2026 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8320885
10 February 2026 Administrative Inspection · COI Inspection · Vessel Attendance
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8308770
28 January 2025 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8071156
9 September 2024 Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7999350
8 July 2024 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7953097
25 January 2024 MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7855612
13 December 2022 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7608628
27 January 2022 Construction Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7386699
30 April 2021 Examination of Repairs · Drydock Exam · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7186538
19 November 2020 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7098758
15 October 2020 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7077806
6 January 2020 MTSA Verification · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6883195
20 September 2019 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6816456
11 February 2019 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6632535
4 October 2018 Deficiency Check
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 6554770
24 July 2018 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6488553
18 October 2017 MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6289222
28 February 2017 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6096515
26 October 2016 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6034789
19 September 2016 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6005041
24 August 2016 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6027022
9 August 2016 COI Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5967032
28 July 2016 Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5954753
18 August 2015 DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5212112
5 September 2014 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4979659
20 August 2014 MTSA Verification · Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4960869
22 July 2014 Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4930486
16 September 2013 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4721527
5 September 2013 Annual Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4705834
17 October 2012 Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4466110
14 September 2011 COI Inspection · Administrative Inspection · Hull Examination · MTSA Verification
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 4137565
12 October 2010 Annual Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3870329
22 September 2009 Internal Structural Exam · MTSA Verification · Drydock Exam · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3601392
20 May 2009 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3489308
14 April 2009 Annual Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3452659
28 February 2008 Annual Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3155041
14 September 2006 Internal Structural Exam · Initial Certification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2778841
11 August 2006 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2743805
8 May 2006 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2643453
12 August 2005 Initial Certification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2460759
9 September 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2190927
13 August 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2165338

Deficiency record · 71

99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 June 2026 No resolution recorded
46 CFR 91.55-1 The following list of required plans is general in character, but includes all plans which normally show construction and safety features coming under the cognizance of the Coast Guard. In the case of a particular vessel, all of the plans enumerated may not be applicable, and it is intended that only those plans and specifications be submitted as will clearly show the vessel's arrangement, construction and required equipment. Amend Operations Manual to reflect actual operations.
Condition: Design Flaw
Action required: 705 - Other - as specified
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 June 2026 No resolution recorded
46 CFR 91.25-10 The inspection for certification shall include an inspection of the structure, boilers, and other pressure vessels, machinery, and equipment. The inspection shall be such as to insure that the vessel, as regards the structure, boilers and other pressure vessels, and their appurtenances, piping, main and auxiliary machinery, electrical installations, lifesaving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, pollution prevention equipment, and other equipment, is in satisfactory condition and fit for the service for which it is intended, and that it complies with the applicable regulations for such vessel and determine that the vessel is in possession of a valid certificate issued by the Federal Communications Commission, if required. The lights, means of making sound signals, and distress signals carried by the vessel shall also be subject to the above mentioned inspection for the purpose of ensuring that they comply with the requirements of the applicable statutes and regulations. The following must be installed -Tilt alarm for jacking operations. -Low hydraulic oil alarm -Install an Anemometer
Condition: Design Flaw
Action required: 705 - Other - as specified
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 June 2026 No resolution recorded
46 CFR 91.25-10 The inspection for certification shall include an inspection of the structure, boilers, and other pressure vessels, machinery, and equipment. The inspection shall be such as to insure that the vessel, as regards the structure, boilers and other pressure vessels, and their appurtenances, piping, main and auxiliary machinery, electrical installations, lifesaving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, pollution prevention equipment, and other equipment, is in satisfactory condition and fit for the service for which it is intended, and that it complies with the applicable regulations for such vessel and determine that the vessel is in possession of a valid certificate issued by the Federal Communications Commission, if required. The lights, means of making sound signals, and distress signals carried by the vessel shall also be subject to the above mentioned inspection for the purpose of ensuring that they comply with the requirements of the applicable statutes and regulations. Leg inspection intervals will be in compliance with CG-543 Policy Letter 07-02 include in the updated operational manual.
Condition: Improper Installation
Action required: 705 - Other - as specified
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 March 2026 Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. The hose for the CO2 extinguisher installed on the paint locker was cracked. 46 CFR 92.05-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2026
Resolution: Replaced hose.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 March 2026 Resolved
The inspection shall be such as to insure that the vessel, as regards the structure, boilers and other pressure vessels, and their appurtenances, piping, main and auxiliary machinery, electrical installations, lifesaving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, pollution prevention equipment, and other equipment, is in satisfactory condition and fit for the service for which it is intended. Hydraulic hoses on the exterior of the vessel were secured with rope. 46 CFR 91.25-10
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2026
Resolution: Removed rope and installed metal brackets.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 9 March 2026 Resolved
Except as provided in paragraph (b) of this section, each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. This letter sets forth conditions of operation. Vessel's current stability letter (Serial# C2-2200522) dated, February 17, 2022, is only valid while all three jacking legs are installed. Vessel shall not remove the jacking legs until the following requirements are met: 1. Update the operations manual to incorporate the new “legs removed” transit with reference to the Stability Calculation Addendum. 2. Submit the updated ops manual to MSC for verification. 3. Receive new stability from MSC. 46 CFR 170.120(a)
Action required: 705 - Other - as specified
Resolved 24 April 2026
Resolution: Received updated stability calculations and stability letter from MSC for operations with and without the jacking legs. See activity# 8320885
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 20 February 2026 Resolved
Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. This letter sets forth conditions of operations. Vessel had previously undergone modifications for a jacking system and had a stability letter approved by MSC. Vessel shall be in compliance with Stability letter prior to operations. Vessel has since removed spuds without notification to Coast Guard and the current stability letter is invalid.
Action required: 705 - Other - as specified
Resolved 11 March 2026
Resolution: Spuds were re-installed
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 16 February 2026 Resolved
To maintain a valid Certificate of Inspection, you must complete your annual and periodic inspections within the periods specified in 46CFR91.27-1(a) and your Certificate of Inspection must be endorsed. The required annual inspection was not completed within 3 months of the November 16th anniversary date.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2026
Resolution: Completed COI inspection
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 February 2026 Resolved
Each pressure vessel listed on the Certificate of Inspection must be thoroughly examined externally every 5 years. MI observed COI PV inspection date of 09JAN2025.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2026
Resolution: Completed internal inspection of the PV.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 10 September 2024 Resolved
Each vessel must— (1) Carry not less than 12 rocket parachute flares approved under approval series 160.136. Missing 06 parachute flares.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 29 January 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 September 2024 Resolved
Electric installations and electric equipment must be inspected at the inspection for certification and periodic inspection to determine mechanical and electrical condition and performance. Vsl removed the STBD generator for rebuild so periodic testing for engine overspeed and low lube oil level couldn't be completed.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 January 2025
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 10 September 2024 Resolved
Containers, brackets, racks, and other similar stowage locations for lifesaving equipment must be marked with symbols in accordance with IMO Resolution A.760(18) indicating the device stowed in that location. Location of embarkation ladder and flares were not displayed correctly on fire control plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 January 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 February 2024 Resolved
Piping, including valves, pipe fittings and flanges, conveying vapors, gases or liquids whose temperature exceeds 150 °F., shall be suitably insulated where necessary to preclude injury to personnel. There was no lagging present on exhaust side of turbo on the no. 1 generator and on the bellow of the exhaust manifold of the main dredge engine.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 February 2024
Resolved 18 April 2024
Resolution: Vessel provided photos of installed lagging
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 February 2024 Resolved
Each panelboard must have a non-combustible enclosure that meets 111-01-07 and 111.01-9. The knockout was removed with no cable running through.
Action required: 10 - Deficiency Rectified
Due 15 February 2024
Resolved 14 February 2024
Resolution: Vessel provided photos of installed knockout seal.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 13 December 2022 Resolved
Piping, fittings, and valves for a fixed fire extinguishing must be in accordance with the manufacturer's approved design and installation. The piping connection between the paint locker and the extinguishing system had an enlarged opening around the connection piping, preventing the space from having a gas-tight closure. 46 CFR 95.16-10(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 December 2022
Resolved 23 December 2022
Resolution: Attached flanges botled on three sides of the each pipe penetration to ensure an airtight seal in the paint locker. See attached photo.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 13 December 2022 Resolved
Each cargo vessel must carry an immersion suit approved under approval series 160.171 of an appropriate size for each person on board. Two out of the six required immersion suits on board were oversized for any crew member onboard, which would not provide adequate buoyancy for the wearer.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 December 2022
Resolved 23 December 2022
Resolution: Ordered two immersion suits that fit a universal size.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 28 September 2021 Resolved
Each vessel must carry distress signal. The distress signals were expired, replace.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2021
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 28 September 2021 Resolved
Containers, brackets, racks, and other similar stowage locations for lifesaving equipment must be marked with symbols in accordance with IMO Resolution A.760(18) indicating the device stowed in that location. Stncil PFD/immersion suits and number inside.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 September 2021 Resolved
The hydraulic hoses used for the jacking system had several leaks. Tighten fitting to prevent leakage.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2021
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 28 September 2021 Resolved
Means shall be provided for closing all ventilation openings. The new intakes installed for cooling of the radiators need to have closing devices for ventilation shut down incase of an engine room fire.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 October 2020 Resolved
Port and stbd generator have no lagging on exhaust manifolds. Repair of replace to the satisfaction of attending MI 46CFR56.50(k)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2020
Resolved 15 November 2020
Resolution: Picutes provided attesting to the installation of lagging.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 October 2020 Resolved
Port engine room door has wastage and a notch missing out of the knife edge. Repair or replace to the satisfaction of attending marine inspector. Deficiency is to be corrected at next drydock. 46CRFR171.111
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 January 2021
Resolved 21 October 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 October 2020 Resolved
WT door to lower deck has wastage on bottom. Repair or replace to the satisfation of attending [name withheld] is to be corrected at next DD 46CFR171.111
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 January 2021
Resolved 20 October 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 October 2020 Resolved
Ladder to the lower deck has 02 penetrations that are not watertight. Repair to the satisfaction of atteengin marine inspector. 46CFR171.111
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2020
Resolved 15 November 2020
Resolution: Pictures provided documenting sat repair to bulkhead penetration.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 January 2020 Resolved
There must be ground detection for each ship's service power system. Switchboard located in machinery space had a ground on b phase during inspection.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2020
Resolved 7 January 2020
Resolution: MI attended vessel and verified proper operation switchboard ground detection system.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 6 January 2020 Resolved
Stations in the maritime service must be licensed by the FCC either individually or by fleet. Vessel's FCC Radio Station Authorization certificate is expired.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 January 2020
Resolved 7 January 2020
Resolution: Vessel provided valid FCC certificate.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 6 January 2020 Resolved
Marine employers shall establish programs for the chemical testing for dangerous drugs on a random basis of crewmembers on inspected vessels. Vessel did not have a valid document stating they use a consortium for random drug testing.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 February 2020
Resolved 7 January 2020
Resolution: Vessel representative provided valid consortium documentation.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 January 2020 Resolved
An aggregate of more than 7.6 liters (two gallons) of flammable or combustible liquids stowed outside of an accommodation, control, or service, space (other than a paint locker) or outside of a machinery space must be stowed in a paint locker that is marked with a warning sign indicating flammable or combustible liquid storage. Vessel is storing 4 X 55 gallon drums of combustible liquid on the top deck.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2020
Resolved 7 January 2020
Resolution: Vessel crew has removed 55 gallon drums from uppermost deck.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 July 2018 Resolved
Two gate valves observed leaking diesel on the fuel transfer pipe in way of the fuel transfer manifold.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 24 August 2018
Resolved 29 July 2018
Resolution: Vessel oeprator repaired leaking gate valves on fuel piping to satisfaction of attending CG Marine Inspectors.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 July 2018 Resolved
Starting batteries for the fiesel installation on deck hooked up loose on deck. Place in boxes or trays protected from the weather.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 24 August 2018
Resolved 29 July 2018
Resolution: Resolved by Sector Hampton Roads.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 24 July 2018 Resolved
Ventilation openings for the intake supply has no means to be closed in case of fire.
Condition: Improper Installation
Due 24 September 2018
Resolved 16 October 2018
Resolution: Attending Inspector(s) verified installation of ventilation closure device for machinery space ventilation (intake) and performed satisfactory operational tests.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 18 October 2017 Resolved
RT01: Permanently install CO2 bottle for newly installed paint locker.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 November 2017
Resolved 26 October 2017
Resolution: Received documentation confirming Paint Locker CO2 system installation and servicing by Hiller.
Stability › Watertight Integrity › General
Issued 19 September 2016 Resolved
Damage to vessel's watertight bulkhead on starboard side following replacement of piping. Repairs were started prior to notification to [name withheld] affected area available for inspection, to the satisfaction of attending marine inspector prior to operating vessel. 46CFR91.45-1(a)/46CFR91.45-5(a)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 October 2016
Resolved 23 September 2016
Resolution: Repairs were completed.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 19 August 2016 Resolved
Each life buoy is req to be marked w/ name of vessel & port in block letters. FWD life buoy missing markings. Re-mark to satisfaction of CG MI
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 September 2016
Resolved 24 August 2016
Resolution: Markings corrected to sat of CG MI
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 19 August 2016 Resolved
1/2 of life buoy must be fitted w/ a self igniting light. FWD life buoy light battery not approved by manufacture. Replace to the satisfaction of CG MI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 September 2016
Resolved 24 August 2016
Resolution: Float light battery replaced with correct type, corrected to sat of CG MI.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 19 August 2016 Resolved
Side lights shall be fitted w/ mat black inboard screens. Screens are painted white. Paint mat black to satisfaction of CG MI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 September 2016
Resolved 24 August 2016
Resolution: Nav light screens painted mat black, corrected to sat of CG MI.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Exhaust Manifold
Issued 19 August 2016 Resolved
Suitable guards shall be installed IWO all exposed dangers. Both service generators turbo lagging missing. Replace to the satisfaction of CG MI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 September 2016
Resolved 24 August 2016
Resolution: Lagging installed on both service gen. corrected to sat of CG MI.
Pollution Prevention/Response › Response Equipment › Sorbents
Issued 19 August 2016 Resolved
Vessel less than 400' must carry appointed spill equipment. Spill kit incomplete. Replace to satisfaction of CG MI.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 2 September 2016
Resolved 24 August 2016
Resolution: Spill kit replaced with complet kit, corrected to sat of CG MI.
Deck/Cargo › Cargo Stowage › General
Issued 19 August 2016 Resolved
CG MI assured safety of vessel. Gear and equipment not secure. Secure to satisfaction of CG MI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 September 2016
Resolved 24 August 2016
Resolution: Loose gear secured, corrected to sat of CG MI.
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 18 August 2015 Resolved
Vessel's 480V sub-pump electrical connection is spliced and wrapped with electrical tape, not in an enclosure. The vessel has all the necessary parts to properly secure. Vessel is restricted from conducting dredging operations until this electrical hazard is eliminated.
Action required: 705 - Other - as specified
Resolved 18 August 2015
Resolution: Vessel properly secured the spliced electrical connection in a proper electrical junction box.
Lifesaving › Hand Flares › Quantity
Issued 18 August 2015 Resolved
Vessel is required to have 12 rocket parachute flares, but has six parachute and six hand flares. Vessel must provide six additional rocket parachute flares. 46CFR199.60
Action required: 705 - Other - as specified
Due 1 September 2015
Resolved 26 August 2015
Resolution: Recieved proof that 06 more flares were purchased.
Lifesaving › Hand Flares › Not on Board
Issued 26 August 2014 Resolved
Vessel is required to have not less than 12 distress signals. Vessel only has 11 rocket parachute flares. Provide additional rocket parachute flare.
Due 9 September 2014
Resolved 5 September 2014
Resolution: Vessel purchased additional approved rocket parachute flare bringing the total number of distress signals onboard to 12.
Lifesaving › Visual Distress Signals (General) › Not on Board
Issued 5 September 2013 Resolved
Distress signals are not in compliance with regulations. Provide 12 rocket parachute flares (approval 160.136) prior to operating more than 30 minutes from shore.
Action required: 705 - Other - as specified
Due 11 September 2013
Resolved 16 September 2013
Resolution: Vessel rep provided 12 rocket parachute flares - all sat.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 5 September 2013 Resolved
Containment for fuel vent has drain with no means of closing. Provide means to seal containment.
Action required: 705 - Other - as specified
Due 11 September 2013
Resolved 16 September 2013
Resolution: Plug was provided for containment.
Stability › Watertight Integrity › General
Issued 17 October 2012 Resolved
Replace gasket on watertight door between bow and center holds
Due 31 October 2012
Resolved 21 November 2012
Resolution: Verified properly installed new gasket.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 17 October 2012 Resolved
Install dripshield on main switchboard.
Due 31 October 2012
Resolved 21 November 2012
Resolution: Verified dripshield was installed.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 17 October 2012 Resolved
Repair exhaust leak on stbd generator diesel engine.
Action required: 705 - Other - as specified
Due 31 October 2012
Resolved 7 December 2012
Resolution: Ran engine to verify exhasut leak was repaired.
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 17 October 2012 Resolved
Replace plastic Raycor plastic bowls with approved type.
Due 31 October 2012
Resolved 21 November 2012
Resolution: Plastic bowls were replaced with aluminum bowls.
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 17 October 2012 Resolved
Provide vessel with line throwing appliance.
Due 31 October 2012
Resolved 21 November 2012
Resolution: Vessel has on board line throwing appliance.
Lifesaving › Rocket Parachute Flares › General
Issued 17 October 2012 Resolved
Provide vessel with distress signals.
Due 31 October 2012
Resolved 21 November 2012
Resolution: Verified proper flares on board.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 14 September 2011 Resolved
Port and starboard running light side screens were faded and required painting matte black
Condition: Improper/Lack of Maintenance
Due 15 September 2011
Resolved 14 September 2011
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 14 October 2010 Resolved
Repaint name of vessel and hailing port on the stern.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 November 2010
Resolved 21 October 2010
Resolution: Operator renewed paint on the vesesel''s hailing port and name at the stern.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 14 October 2010 Resolved
Repalce stern lifering waterlight battery with an approved battery.
Action required: 705 - Other - as specified
Due 18 October 2010
Resolved 21 October 2010
Resolution: Operator replaced unapproved battery with an approved stud screw down type terminal approved battery.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 14 October 2010 Resolved
Repair starboard running light.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2010
Resolution: Operator has repaired inoperable running light.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 14 October 2010 Resolved
Provide a battery box and cover for the 12 volt batteries powering the stern and port running lights.
Action required: 705 - Other - as specified
Due 1 November 2010
Resolved 21 October 2010
Resolution: Operator installed a battery box and cover for the 12 volt batteries powering the stern and port running lights.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 14 April 2009 Resolved
The navigation lights are not working due to low battery voltage, repair or replace a necessary, portable lights are temporarily authorized.
Action required: 705 - Other - as specified
Due 13 May 2009
Resolved 20 May 2009
Resolution: Lights working properly and burning brightly.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 14 April 2009 Resolved
Properly label the storage location for the lifejackets.
Action required: 705 - Other - as specified
Due 13 May 2009
Resolved 20 May 2009
Resolution: Lifejacket storage location properly labeled.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 14 April 2009 Resolved
The emergency light in the lower deck center storage room is not working make repairs as necessary.
Action required: 705 - Other - as specified
Due 13 May 2009
Resolved 20 May 2009
Resolution: Light working properly.
Electrical › Lighting (service) › Lighting Fixture
Issued 14 April 2009 Resolved
Provide a globe cover for the light fixture in the forward stairway to the lower deck.
Action required: 705 - Other - as specified
Due 13 May 2009
Resolved 20 May 2009
Resolution: Globe provided.
Fire Fighting › Portable CO2 Fire Extinguisher › Marking
Issued 14 April 2009 Resolved
Provide markings for the storage location of the fire extinguishers as needed.
Action required: 705 - Other - as specified
Due 13 May 2009
Resolved 20 May 2009
Resolution: Storage location properly marked.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 14 April 2009 Resolved
Remove wire tie from the water light and properly attach with 3 - 6 ft. line.
Action required: 705 - Other - as specified
Due 13 May 2009
Resolved 20 May 2009
Resolution: water-light properly secured with lanyard.
Engineering › Fuel Oil Service System › Filter
Issued 14 April 2009 Resolved
Remove improper petcocks from the fuel filters on the prime mover for the on deck air compressor and replace with petcocks that will accept plugs.
Action required: 705 - Other - as specified
Due 13 May 2009
Resolved 20 May 2009
Resolution: Improper petcocks removed and proper petcocks installed.
Electrical › Electric Supply System (service) › Battery Charger
Issued 14 April 2009 Resolved
Repair or replace inoperative battery charger and stbd generator alternator for the generator batteries.
Action required: 705 - Other - as specified
Due 13 May 2009
Resolved 20 May 2009
Resolution: battery charger and STARBOARD gnerator alternator operating properly.
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 14 April 2009 Resolved
Install lagging where missing on the prot and stbd generator turbochargers.
Action required: 705 - Other - as specified
Due 13 June 2009
Resolved 26 June 2009
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 20 November 2006 Resolved
Provide onboard the following hand portable fire extinguishers: a) One (1) A-II for each Storeroom. b) One (1) BC-II for the compressor / waste oil tank room. c) One (1) B-II for the Jacking Air Compressor enclosure mounted outside the space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 November 2006
Resolution: All hand prtable F/Es proper.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 14 September 2006 Resolved
Relocate the battery box installed under the electrical switch gear, or, make the switch gear suitable for a hazardous location.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 November 2006
Resolution: Switch gear disconnected.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 September 2006 Resolved
Remove the portable lube oil containers from the jacking system air compressor space.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 November 2006
Resolution: Corrected
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 14 September 2006 Resolved
Provide oil transfer procedures for the barge that complies with 33 CFR 154, 155, and 156.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 November 2006
Resolution: OTP on board.
Operations/Management › Navigation Safety › Doors Closed at Sea
Issued 14 September 2006 Resolved
Mark the two (2) Class I WTDs in the below deck storeroom - "KEEP CLOSED".
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 November 2006
Resolution: WTDs marked.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 14 September 2006 Resolved
Provide on board the vessel's Certificate of Documentation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 November 2006
Resolution: COD on board.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 14 September 2006 Resolved
Provide the Manufacturer's Data Sheet for the air receiver.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 November 2006
Resolution: Data report received.

Casualty record · 3

26 October 2016Routine · role: Involved in a Marine Casualty · activity 6034789
11 February 2019Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 3 injured · activity 6632535
25 March 2026Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 8338679
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.