Records from 1998 to 2022. Most recent: inspection, 25 January 2022.
Documentation record
Registered dimensions (L × B × D)54.1 ft × 24.5 ft × 8.6 ft
Registered tonnagegross 135 / net 92
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGULF OUTLET MARINE REPAIR · NEW ORLEANS, LA, UNITED STATES · built 1980
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 December 2025 · expires 31 January 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it135 - Regulatory (Subpart C or D), Gross Ton
92 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
25 January 2022
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7385280
9 November 2021
Administrative Inspection · Initial Certification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7348105
3 November 2021
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7345078
19 October 2021
TPO Audit
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7347229
27 July 2021
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7269394
23 May 2020
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6972209
11 December 2014
Industry Initiated Exam · MTSA Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5040234
8 December 2014
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5041357
29 October 2013
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4743850
2 December 2011
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4200395
5 November 2011
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4184927
25 September 2009
Industry Initiated Exam · Deficiency Check · Administration · MTSA Verification · MARPOL
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3602779
5 November 2008
DAPI Audit · Uninspected Other · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3358446
29 June 2006
MTSA Verification · Uninspected Other
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 2695083
22 November 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2246142
5 June 2002
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1626641
19 April 2001
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 289835
11 August 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 717160
5 March 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 27038
22 August 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 31388
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 27 July 2021
Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel is one of the associated fleet that has not obtained a valid COI. The vessel shall be made available for a Coast Guard COI inspection within 90 days. If an inspection is not completed prior to this date, the action for this deficiency shall be changed to a 60 (Rectify deficiencies prior to movement) and the vessel may no long be permitted to operate.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 25 October 2021
Resolved 15 November 2021
Resolution: Placed ITV Coal Express into laid-up status. This changes the company's compliance percentage to 78%. Cleared deficiency to reflect company's compliance with Sub-M implementation threshholds.
Stability › Watertight Integrity › General
Issued 5 November 2008
Resolved
Repair the stern void hull leak.
Condition: Improper/Lack of Maintenance
Due 8 January 2009
Resolved 6 January 2009
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 5 November 2008
Resolved
Replace expired items in the vessel's first aid kit.
Condition: Improper/Lack of Maintenance
Due 6 December 2008
Resolved 8 December 2008
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 5 November 2008
Resolved
Pick up excessive clutter and debris from the 2nd deck area (fire hazard).
Condition: Improper/Lack of Maintenance
Due 6 December 2008
Resolved 8 December 2008
Communications › Audible Communications › Bell
Issued 5 November 2008
Resolved
Ensure the General Alarm bell is tested and logged weekly (same for the [name withheld]).
Condition: Improper/Lack of Maintenance
Due 6 December 2008
Resolved 8 December 2008
Operations/Management › Drills/Instruction › Fire
Issued 5 November 2008
Resolved
Ensure security drills are conducted and documented quarterly (same for the [name withheld]).
Condition: Unknown
Due 6 December 2008
Resolved 8 December 2008
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 5 November 2008
Resolved
Ensure the crew and supervisors (minimum one hour) have the required Employee Assistance Training and that it is documented.
Condition: Unknown
Due 6 December 2008
Resolved 8 December 2008
Stability › Unintentional Flooding › General
Issued 5 November 2008
Resolved
Remove the excess water from the fwd void and verify water tight integrity.
Condition: Unknown
Due 8 January 2009
Resolved 6 January 2009
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 November 2008
Resolved
Properly support the dangling wire at the entrance to the forward void.
Condition: Improper/Lack of Maintenance
Due 6 December 2008
Resolved 8 December 2008
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 5 November 2008
Resolved
Cover the exposed electrical outlets in the galley area.
Condition: Unknown
Due 6 December 2008
Resolved 8 December 2008
Electrical › Lighting (service) › Lighting Fixture
Issued 5 November 2008
Resolved
Cover exposed second deck florescent light.
Condition: Improper/Lack of Maintenance
Due 6 December 2008
Resolved 8 December 2008
Electrical › Lighting (service) › Lighting Fixture
Issued 5 November 2008
Resolved
Install globes and guards on all exposed engineroom lights.
Condition: Improper/Lack of Maintenance
Due 6 December 2008
Resolved 8 December 2008
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 5 November 2008
Resolved
Secure the loose deck plate behind the engine room ladder.
Condition: Improper/Lack of Maintenance
Due 6 December 2008
Resolved 8 December 2008
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 5 November 2008
Resolved
Properly mount the aft, engineroom, fire extinguisher.
Condition: Improper/Lack of Maintenance
Due 6 December 2008
Resolved 8 December 2008
Engineering › Reduction Gearing/Clutches › Oil Spray
Issued 5 November 2008
Resolved
Repair both port and stbd, reduction gear, oil leaks and remove the oil soaked plywood sling shields.
Condition: Improper/Lack of Maintenance
Due 6 December 2008
Resolved 8 December 2008
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 5 November 2008
Resolved
Install a fixed, oily bilge water, piping system as per 33 CFR 155.410.
Condition: Unknown
Due 8 January 2009
Resolved 29 December 2008