Records from 2001 to 2019. Most recent: operational control imposed, 14 March 2019.
Inspection history · 19
13 March 2019
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6642488
4 October 2018
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6554747
2 October 2018
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6553514
1 September 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6257194
14 August 2017
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6240236
8 September 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5995072
8 September 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6007790
6 September 2016
PII Safety Exam · ISPS III Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5987412
29 October 2015
Deficiency Check · PII Safety Exam · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5753389
28 October 2015
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5762134
29 January 2008
PII Safety Exam · MARPOL Annex V Examination · MARPOL Annex I Examination · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3135774
18 September 2006
MARPOL Annex I Examination · Ballast Water Examination · PII Safety Exam · MARPOL Annex V Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2780375
27 May 2005
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2370284
15 July 2004
ISPS II Exam
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 2126207
22 March 2004
Annual Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2029268
3 June 2002
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1625303
3 June 2002
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1625399
26 January 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 137586
25 January 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 286468
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 24 March 2019
No resolution recorded
33 CFR 164.37: Each vessel of 10,000 gross tons or more must have, in addition to the radar system under 164.35(a), a second marine radar system that operates independently of the first.Vessel's S-Band radar is currently inoperable. See attached LOD 1269.
Action Code: 40 a/c
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 4 October 2018
No resolution recorded
74 SOLAS (2014) III/20.2
Before the ship leaves port anda t all times during the voyage, all life-saving apppliances shall be in working order and ready for immediate use. PSCE observed faulty limit switch on starboard lifeboat. Lifeboat can be lifted manually.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2018
No resolution recorded
74 SOLAS (2004) II-1/40.1.3.
The safety of passengers, crew and ship from electrical hazards will be ensured. Dead end wires were found throughout the engine room.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 4 October 2018
Resolved
74 SOLAS (2004) III/20.2
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Starboard side lifeboat steering isn't able to continuously move rudder from starboard to port side.
Action required: 10 - Deficiency Rectified
Resolved 4 October 2018
Resolution: PSCE witnessed satisfactory repair of steering
Fire Fighting › Structural - A Class Divisions › Service Spaces
Issued 14 August 2017
Resolved
0799: 74SOLAS(01) II-2/2.2.2 The followingbasic principles underlie the regulations in this chapter and the potential fire hazards involved: the separation of accommodation spaces from the remainder of the ship by thermal boundaries. Cable penetrations found in cable trunk rooms 514,414,319,209, and 110 are such that there are altering the integrity of the thermal boundaries. (4ac)
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 1 September 2017
Resolution: Rectified with sealant to the satisfaction of Classification society.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 6 September 2016
Resolved
The activation of any detector or manually operated call point shall initiate a visual and audible fire signal at the control panel and indicating units. A. while testing smoke detectors the PSCO observed that the buzzer and light for the fire detector in the oil purifier room were inoperable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 September 2016
Resolved 6 September 2016
Resolution: The crew repaired the audible alarm and replaced the bulb for the visual indicator in the oil purifier room, PSCO cleared deficiency.
Electrical › Electric Generation Source (emergency) › Generator
Issued 29 October 2015
Resolved
EDG failed to provide power to the Emergency Switchboard.
74 SOLAS (2004 Cons.) Ch. II-1 Reg. 43.3.1.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 October 2015
Resolved 4 November 2015
Resolution: Received a class report attesting to the satisfactory repairs and operation of the emergency generator.
Operations/Management › Pollution › Changeover Not Completed Prior to ECA
Issued 29 October 2015
Resolved
PSCO discovered that the vessel has been operating within the ECA from 28OCT15 to 29OCT15, utilizing fuel that does not comply with the MARPOL Annex VI ECA Sulfer limits.
MARPOL Annex VI, Reg. 14.4
Action required: 705 - Other - as specified
Due 29 October 2015
Resolved 29 October 2015
Resolution: Vessel completed bunkering of 25 MT on 28OCT15.
Lifesaving › Launching Appliances › Davit
Issued 29 October 2015
Resolved
Limit switches on lifeboat davit failed to activate.
74 SOLAS (2004 Cons.) Ch. III, REG. 16.1
LSA Code Ch. VI/16.1.2.7
Action required: 705 - Other - as specified
Due 29 October 2015
Resolved 29 October 2015
Resolution: Vessel made repairs to limit switch, and successfully proved proper performance.